RPC HV&LV status Introduction HV power supply tender

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Davide Piccolo INFN Napoli Electronics Review Review of cable procurement and installation Davide Piccolo INFN Napoli.
1 S. Lusin, LV Cabling, CERN 06 Apr 06 LV Cabling 06 Apr 06 S. Lusin Fermilab / CERN Cabling from USC to UXC, Power Distribution.
Flavio Dal Corso - INFN Padova1 OPERA coll. meeting - Hamburg 3 July 2004 RPC & XPC Electronics Status Front End Boards (FEBs) Controllers HV system Crates.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting HV-LV-DCS Status DCS barrel:G. Polese and P. Paolucci DCS endcap:A. Cimmino and.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
NA62 GTK Cables & Patch Panels. TCC8_GTK1 TCC8_GTK2_GTK3.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10 
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
r1Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling YB+2 and YB+1, extension to minus wheels and YB0, cables between UXC55 and USC55.
Paolucci INFN-Napoli Muon Annul Review Cern 15 September 2003 RPC cabling HV & LV cables Signal cables Position and composition of racks in UXC and USC.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
cm 150 cm The Al foil is large as the M3 wall  we can put 1 raw (5 chambers) or 2 raws There is an insulating material (varnish) on the.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
Preparation of chamber training g. passaleva. Gaps to be trained We have O (100) gaps that have tripped at least once since June At a quick glance they.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
D. Piccolo Barrel RPC Cable procurement, installation Davide Piccolo INFN Napoli.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Cables for the RE4 Upscope in CMS
LKr status R. Fantechi.
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
RPC Barrel HV & LV system Lappeenranta University
T1 Electronic status Conclusions Electronics Cards:
Electronics for RPC Upscope
CMS RPC Endcap RE1 Status Report
HV & LV status LV system in W+1 and W+2 is OK
LV Test Napoli feb 05 Noise ripple: EASY - + CRATE LV cable
HV-LV, cabling & services
RPC Manufacturing Review - Pierluigi Paolucci - I.N.F.N. Napoli
RPC’s HV-LV project Introduction HV and LV requirements
RPC HV&LV systems Introduction Detector description Requirements
RPC Configuration DataBase Pierluigi Paolucci - I.N.F.N. of Naples.
RPC HV&LV systems Introduction Detector description Requirements
Pierluigi Paolucci - I.N.F.N. Naples
Pierluigi Paolucci - I.N.F.N. Naples
A. Boiano1, F. Loddo2, P. Paolucci1, D. Piccolo1, A. Ranieri2
Pierluigi Paolucci - I.N.F.N. Naples
Alfonso Boiano1, Flavio Loddo2, Pierluigi Paolucci1, Antonio Ranieri2
RPC Detector Control System
RPC Detector Control System
RPC Detector Control System
RPC HV&LV systems Introduction Detector description Requirements
RPC Detector Control System
Dr. Pierluigi Paolucci - INFN di Napoli
HV-LV-DCS Status NEWS DCS Endcap Integration
RPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
Dr. Pierluigi Paolucci - INFN di Napoli
RPC Detector Control System: towards the final system
RPC Detector Control System
RPC HV-LV project Introduction System requirements and description
RPC HV-LV project Introduction RPC description Requirements
RPC Readiness for installation
HV & LV status LV system in W+1 and W+2 is OK
on behalf of Barrel RPC Collaboration
RPC Detector Control System
HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV)
RPC HV-LV project Introduction System requirements and description
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System
Dr. Pierluigi Paolucci - INFN di Napoli
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

RPC HV&LV status Introduction HV power supply tender I.N.F.N. Naples Introduction HV power supply tender HV cable and connectors HV distributor and patch-panel Costs and schedule LV system CMS tender, costs and schedule Conclusions F. Loddo2, P. Paolucci1, D. Piccolo1, A. Ranieri2 1) I.N.F.N. of Naples, 2) I.N.F.N. of Bari 11/20/2018 Pierluigi Paolucci - I.N.F.N. Naples

Pierluigi Paolucci - I.N.F.N. Naples HV & LV numbers I.N.F.N. Naples 16 LV channels 8 HV channels Our best solution 2+2 LV 6 FEBs / 2 bi-gaps 6 FEBs / 2 bi-gaps 1+1 HV 2+2 LV 6 FEBs / 2 bi-gaps 6 FEBs / 2 bi-gaps 1+1 HV 2 LV 6+6+6 FEBs / 3 bi-gaps 1 HV Reduction of 2 LV 6+6 FEBs / 2 bi-gaps 1 HV HV 1020  480 ch LV 1560  960 ch 2 LV 6+6 FEBs / 2 bi-gaps 1 HV 2 LV 6+6 FEBs / 2 bi-gaps 1 HV wheel 1 2 3 4 5 TOT gaps 408 2040 HV 96 480 FEBs 936 4680 LV 192 960 CHAMBER option 1 HV channel per chamber 2 LV channels per chamber 11/20/2018 Pierluigi Paolucci - I.N.F.N. Naples

Pierluigi Paolucci - I.N.F.N. Naples HV & LV schema I.N.F.N. Naples LV ch. 480 LV baords 60 EASY 20 HV ch. 960 HV boards 80 12 Control Room SY1527 HV distributor HV-EASY HV distributor HV-EASY Detector 3 4 RPC LV RPC LV 2 5 1 6 12 7 11 8 RPC LV RPC LV 10 9 HV small cable LV cable HV big cable panel HV panel HV 11/20/2018 Pierluigi Paolucci - I.N.F.N. Naples

HV connections schema I.N.F.N. Naples 11/20/2018

Pierluigi Paolucci - I.N.F.N. Naples LV connections schema I.N.F.N. Naples 60 LV boards placed in 20 crates (1 per balcony) Power consumption: board (12 ch.)  116 W crate (3 boards.)  350 W wheel (4 crates)  1.4 KW Total  7.0 KW 11/20/2018 Pierluigi Paolucci - I.N.F.N. Naples

Pierluigi Paolucci - I.N.F.N. Naples HV: where we are I.N.F.N. Naples High Voltage: The power supply tender has been assigned to the CAEN; A complete prototype will be delivered in Sept 04 and will be test in Naples using the RB3 chamber that is working in Naples in the cosmic test station. The” small” quadrupolar cables (from chamber to patch panel) have been delivered at CERN; The “big” multi-conductors cables tender has to be redone as soon as possible; The tripolar and coaxial connectors have been delivered to Naples; A first HV distributor prototype has been build in Naples. Now is under test; A first HV patch panel is almost ready; 11/20/2018 Pierluigi Paolucci - I.N.F.N. Naples

HV distributor and patch panel I.N.F.N. Naples Patch Panel 11/20/2018 Pierluigi Paolucci - I.N.F.N. Naples

Pierluigi Paolucci - I.N.F.N. Naples HV & LV cable drawings I.N.F.N. Naples 11/20/2018 Pierluigi Paolucci - I.N.F.N. Naples

Pierluigi Paolucci - I.N.F.N. Naples LV: where we are I.N.F.N. Naples Low Voltage: The power supply quotation inquiry made by CERN for CMS will be ready in a few weeks; A LV PS prototype will be delivered in July 04 and will be tested in Naples; The power supply will be ordered in Sept 04 and delivered from Dec 04 to Dec 05; The cables have been delivered at CERN; The connectors will be ordered in June; The cable production will be done at the ISR when the cable length list will be officially published by the DT-RPC team (CERN-TO-PD-NA) 11/20/2018 Pierluigi Paolucci - I.N.F.N. Naples

HV and LV cost estimation 2003 I.N.F.N. Naples The total costs of the systems are calculated using a spreadsheet having as inputs the following items: number of: connectors, cables, patch panels, boards, crates, controllers and mainframes cable length and installation costs cost of each of those items GRI may 03 slide We have used the following prices (Euro): 3500 HV board, 2500 LV boards, 1500 crates, 3500 branch contr, 10K mainframe. Tot (HV control room) CORE is  900 FS or 600 K€ 11/20/2018 Pierluigi Paolucci - I.N.F.N. Naples

HV and LV cost estimation 2003 I.N.F.N. Naples

Pierluigi Paolucci - I.N.F.N. Naples Budget & Costs I.N.F.N. Naples A “reduced” HV and LV systems have been designed for budget limitation: HV: from 1020 to 480 ch.  80 boards  12 crates; LV: from 1560 to 720 ch.  60 boards  20 crates High Voltage 2003 estimated cost  400/450 K€ already paid  405.877 € to complete  100 K€ Low Voltage 2003 estimated cost  200/250 K€ already paid  10 K€ to complete  240 K€ 80 boards Tot: 506 K€ Extra: 50 K€ Tot: 250 K€ No Extra 11/20/2018 Pierluigi Paolucci - I.N.F.N. Naples

Pierluigi Paolucci - I.N.F.N. Naples HV & LV detailed costs I.N.F.N. Naples 11/20/2018 Pierluigi Paolucci - I.N.F.N. Naples

Pierluigi Paolucci - I.N.F.N. Naples Conclusions I I.N.F.N. Naples The intermediate solution (80 boards  one channel per chamber) has been chosen for the HV system in order: Prevent the ground loop for the RB3 & RB4 chambers; Have independent voltage on every chamber. The HV tender has been assigned to the CAEN: HV board: 3500 € (2003)  3500 €; EASY crate: 1000 € (2003)  950 €; Branch Ctrl: 1000 € (2003)  850 €; SY1527: 10000 € (2003)  8500 €; There is an extra cost of about 50 K€ The LV PS costs are known: No reductions The cost of the system is 250 K€  No extra costs 11/20/2018 Pierluigi Paolucci - I.N.F.N. Naples

Pierluigi Paolucci - I.N.F.N. Naples Conclusions II I.N.F.N. Naples 450 K€ has been assigned in the 2003: 422 K€ has been already spent in the 2003; Extra cost of about 50 K€ is needed to complete the system; We are still working on the cable construction and installation; The LV delivery will begin in the second part of the 2004: No reduction in the LV PS price (CERN tender); The cable construction will be done at ISR. 150 K€ are sub-judice in the 2004 Total extra cost of both the system is 200 K€ 11/20/2018 Pierluigi Paolucci - I.N.F.N. Naples