1 Alfonso Boiano1, Flavio Loddo2, Pierluigi Paolucci1, Antonio Ranieri2
RPC’s HV-LV project I.N.F.N. Naples Introduction System requirements and description SASY-2000 project Prototype tests Cables and connectors Summary Alfonso Boiano1, Flavio Loddo2, Pierluigi Paolucci1, Antonio Ranieri2 1) I.N.F.N. of Naples, 2) I.N.F.N. of Bari

2 Pierluigi Paolucci - I.N.F.N. Naples
Introduction I I.N.F.N. Naples The RPCs sub-detectors of the LHC experiments will be for the first time equipped with a large part of the HV-LV system placed in a not accessible area. The HV “remote hardware” will be placed on the balcony and it will be accessible just in some dedicated period. The system will work in very hard conditions for the high magnetic field and high radiation environment. 11/27/2018 Pierluigi Paolucci - I.N.F.N. Naples

3 Pierluigi Paolucci - I.N.F.N. Naples
Introduction II I.N.F.N. Naples The idea of the HV-LV system for the RPC detector of the LHC experiments is to split the system in two: LOCAL: SY1527 mainframes placed in control room and a 48 Volts High Power Source; REMOTE: distribution system placed in the UXC zone around the detector. It consists of a 6U custom crate housing 2 independent controllers and up to 8 distribution board equipped with 4 HV + 8 LV floating channels. The system will work in very hard conditions due to the high magnetic field and high radiation environment. A common project (SASY 2000) to realize this system is going on between the I.N.F.N. and the CAEN company. 11/27/2018 Pierluigi Paolucci - I.N.F.N. Naples

4 detector description I
I.N.F.N. Naples RB3/RB4 ALV1 DLV1 ALV2 DLV2 HV1 HV2 Bigap ALV1,ALV2,ALV3 DLV1,DLV2,DLV3 Bigap RB2 reference plane RB1/RB2in Bigap ALV1 DLV1 ALV2 DLV2 HV1 HV2 HV1 HV2 HV3 Two non adjacent gaps will be connected to the same HV channel in order to halve the # of HV channels “without” reducing the trigger efficiency. 11/27/2018 Pierluigi Paolucci - I.N.F.N. Naples

5 detector description II
I.N.F.N. Naples RB1/RB2in RPC chamber Front-End Bigap Distrib. board Bigap ALV1 DLV1 ALV2 DLV2 ALV Analog Voltage = 7V Working Cur. = 0.42 A DLV Digital Voltage = 7V Working Cur. = 0.9 A I2C input LV+I2C FEB out LV in Distributes analog and digital LV It supplies LV power to 3 FEB chains It supplies the I2C main line from LB and one backup line from DT. Total power/(ALV+DLV) ch.: 1.32 A * 7 V = 9.24 W Expected Power  120 W/sector  7.2 kW/Barrel 11/27/2018 Pierluigi Paolucci - I.N.F.N. Naples

6 requirements and numbers
I.N.F.N. Naples requirements: system working in high magnetic field; system working in an high radiation environment; local system in control room + distributed remote systems on the detector; low voltage (48 Volts) running from the local to the remote system; floating HV (12KV–1mA) and LV (7V–0.42A (ana.) and 7V–0.9A(dig.)) channels (noise reduction). wheel 1 2 3 4 5 TOT gaps 408 2040 HV ch. 204 1020 front-end 936 4680 LV ch. 312 1560 having chosen 2 gaps per HV channel and 6 FEBs per LV channel 11/27/2018 Pierluigi Paolucci - I.N.F.N. Naples

7 Pierluigi Paolucci - I.N.F.N. Naples
SASY2000 project for RPC I I.N.F.N. Naples Electronic house 1 1 Branch controller From 1 to 16 4 4 All independent floating channels 11/27/2018 Pierluigi Paolucci - I.N.F.N. Naples

8 Pierluigi Paolucci - I.N.F.N. Naples
SASY2000 project for RPC II I.N.F.N. Naples Detector region Electronic house 4 8 16 HV #1 HV #2 Branch controller #1 Complex ch. 1 256 Remote boards LV #1 LV #4 Branch controller #2 HV #1023 HV #1024 Complex ch. 512 256 LV #2047 LV #2048 Branch controller #16 What do we need ?? 26 ch * 12 sect * 5 wheels = 1560 LV 17 ch * 12 sect * 5 wheels = 1020 HV One mainframe is enough for the barrel The remote board has 2 Complex ch. each equipped with: 2 HV ch and 4 LV ch. 11/27/2018 Pierluigi Paolucci - I.N.F.N. Naples

9 RPC HV-LV prototype SASY2000
I.N.F.N. Naples The HV-LV CAEN functional prototype consists of: 1 HV board, LV board and 1 controller. The prototype has been split in three pieces, following the “logical separation” of the system, in order to study the functionality of every single piece and component. The final HV-LV board will have 2 complex channel each with 2 HV + 4 LV floating channels . It will be 6U high and 2 slots width. After the tests the factory will begin to design the final board integrating all these components in a single 6U – 2 slots boards. 11/27/2018 Pierluigi Paolucci - I.N.F.N. Naples

10 Pierluigi Paolucci - I.N.F.N. Naples
Test performed I.N.F.N. Naples SASY 2000 prototype The HV-LV prototype 0 consists of: HV board (SA2001), 3 LV boards (SA2002) and 1 controller. It has been split in three pieces, following a “logical separation” of the system, in order to study the functionality of every single piece and component. The following tests has been performed on both the prototypes and will be repeated for the final boards: Magnetic field test up to 7 KGauss (at CERN) (results shown by CAEN at CERN in May 2002) Radiation test up to 10 LHC eq-years (at Louvain La Neuve) (results shown) Test on the RPC to study the noise condition (to be performed at the test station in Bari); High Stress Test to study the system under very hard conditions (under test in Napoli). 11/27/2018 Pierluigi Paolucci - I.N.F.N. Naples

11 Neutron radiation test
I.N.F.N. Naples The SASY2000 HV-LV prototype has been tested twice (May-Aug 2002) at the Louvain La Neuve radiation facility. The total neutron fluence requests for 10 LHC years is about 1x1012 n/cm2 (note: in RE1/1 region) corresponding to 2 hours and 40 min with a beam at 1 mA at 70 cm SASY2000 In first session the system worked well for 30 min. corresponding to 1.8 • 1011 n/cm2 (a factor 6 higher than that expected on RB4!) We lost the communication with the prototype. CAEN reported a known loss of current gain due to irradiation on CNY17 opto-insulator used to enable the HV/LV channels. The prototype was irradiated for 80 min corresponding to 4.8*1011 n/cm2. On the second prototype (ATLAS one) the gain current loss was cured using a lower value biasing resistor. Was registered a few SE on the controller with loss of communication but the normal condition was restored after 1 s on power OFF/ON condition (it will be implemented by firmware an HOT RESET to recover the communication without interruption of remote power supply). After the irradiation the SASY2000 was tested outside, preserving its original functionality. (robustness of hardware) 11/27/2018 Pierluigi Paolucci - I.N.F.N. Naples

12 Magnetic field test setup
Magnet: MNP24-1 at CERN Bldg. 168 B: up to 10 KGauss B around CMS: .44T Test condition: 0-7 KGauss Magnetic Field: up to 5 KGauss Test condition SA2001: VOUT = 8kV, Rload=12 M SA2002: VOUT0 = 4.7 V, VOUT1 = 5.0 V, IOUT0,1 = 1.9A from 0 a 5 KGauss: loss of efficiency 2% (// B) 0% ( B) (efficiency defined as =Pload/PDC-DC converter) (75%  73%) Future improvements: transformer oriented according  B  it will work reliably up to 8 KGauss 11/27/2018 Pierluigi Paolucci - I.N.F.N. Naples

13 High Stress Test in Naples I
I.N.F.N. Naples The High Stress Test system has been designed and developed by the group of Naples in order to make a very complete test of any HV-LV power supply. It consists of a test-box controlled by a PC running LabVIEW 6.1 At present the HST system is able to make: Long term test: A cycle of measurements (voltage and current) made using different resistive charge (from 1M to 10 G) to explore the whole range of the PS. Spark test: A cycle of spark at different voltage are generated in order to test the hardware/software behavior of the PS under this critical conditions. Calibration: independent measurement of the voltage and current (PS and test-box). The Trip-time, the rump-up and rump-down are also calibrated. 11/27/2018 Pierluigi Paolucci - I.N.F.N. Naples

14 High Stress Test description I
I.N.F.N. Naples The test-box consists of a custom rotating switch controlled by a step-to-step motor through a microcontroller (Microchip) . Each position of the switch corresponds to an electrical contact placed on a PCB and positioned on a circle at a distance of 22,5o each others. The motor needs 400 steps to make a complete turn corresponding to about 0.9o/step. 11/27/2018 Pierluigi Paolucci - I.N.F.N. Naples

15 High Stress Test description II
I.N.F.N. Naples Each position of the commutator is connected to: a different resistive charge (10G, 5G, 1G, 100M, 9M, 6); one of the four spark systems (10KV, 5KV, 2KV, short); OFF position. The spark system consists of two electrodes connected between the high voltage and the ground, placed at a fixed distance in order to generate sparks at a predetermined voltage. 11/27/2018 Pierluigi Paolucci - I.N.F.N. Naples

16 High Stress Test description III
I.N.F.N. Naples The micro-controller PIC 16F is used to: controls the motor through a custom board housing a “power driver” used to generate the phases needs to control the motor. drive the LCD monitor placed on the box and the manual control. drive the communication through a serial port RS232 used to connect it to a PC. control an internal ADC (10 bits) and drive a Programmable Gain Amplifier. It is used to measure the current provided by the PS at different full scale (1mA, 100 mA, 1mA). A C program has been written to control all the operations of the micro-controller. The program is stored in the internal flash memory. It also calculates the voltage from the measured current and takes in account the offset of each full scale. 11/27/2018 Pierluigi Paolucci - I.N.F.N. Naples

17 Pierluigi Paolucci - I.N.F.N. Naples
The HST test box I.N.F.N. Naples rotating switch display RS232 port step motor manual control 11/27/2018 Pierluigi Paolucci - I.N.F.N. Naples

18 Pierluigi Paolucci - I.N.F.N. Naples
HST LabVIEW display I.N.F.N. Naples output table Vmon Imon current 11/27/2018 Pierluigi Paolucci - I.N.F.N. Naples

19 Pierluigi Paolucci - I.N.F.N. Naples
HV cable I.N.F.N. Naples The HV cable has been chosen and approved Suitable to sustain up to 15 kV Cable characteristics: According CERN safety instruction IS 23 Single conductor- = 0.16 mm Conductor 20°C = 147 /Km Core- = 3 mm Screen wire-=0.2 mm (for 10 conductors) Overall diameter = 8.4 mm (for 3 conductors) Price: €/Km (for 10 Km and 3 conductors cable) 11/27/2018 Pierluigi Paolucci - I.N.F.N. Naples

20 Pierluigi Paolucci - I.N.F.N. Naples
HV connectors I I.N.F.N. Naples The HV connector has been chosen and approved Possibility to stack it up Electrical characteristics: Operating voltage: 15 kV Testing conditions: 20 kV 2 high voltage pins to supply –12 kV 1 pin for signal return insulating material Polietilene HDPE (Eraclene Polimeri Europa (57%) Masterbatch (GPO1246 Viba) (43%) (Conforming to TIS Rules) Metal cover connected to external chamber aluminum frame ZAMA (UNI 3717 G-Zn A14 Cu1) 11/27/2018 Pierluigi Paolucci - I.N.F.N. Naples

21 Pierluigi Paolucci - I.N.F.N. Naples
HV connectors II I.N.F.N. Naples By CPE ( Price: 3 CHF/contact/ pieces Schedule: The connector has passed CERN tests for chemical analysis Made electrical test performance (before and after radiation exposure) We are waiting for the final quotation before final order 11/27/2018 Pierluigi Paolucci - I.N.F.N. Naples