EDUCATION FIRST FACILITIES COMMITTEE. THE FACILITY COMMITTEE WAS CREATED IN NOVEMBER 2012 TO COMPLETE A THOROUGH STUDY OF DISTRICT FACILITIES. MEMBERS.

Slides:



Advertisements
Similar presentations
MACCRAY Elementary Facilities Update meeting Tuesday, June 25, Maynard Community Center, 7:00 pm Wednesday, June 26, Raymond Community Center, 7:00 pm.
Advertisements

Wendover Renovation Presentation Presentation Overview Renovation Stages Before Now After How you will be affected Questions/Concerns.
SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
1 Zero Tax Increase Referendum: Community Information Session.
Fullerton College Bond Fund Projects Update Fullerton College Athletics Project Scope Overview Schedule Parking.
Cathedral of the Immaculate Conception Project Information Session.
Planning an athletic facility project for Middle School Kids! Ms. Pauleys 8 th Grade Math – CTMS April 18, 2013.
Welcome to the Grafton Village Town Hall Meeting! March 14, :30-7:30 pm.
MARPLE NEWTOWN SCHOOL DISTRICT FACILITIES. Maintenance & Small Projects Planned for Summer 2007 New carpet at Worralls office New fencing at Worralls.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
August 2008 WATCH YOUR STEP! CONSTRUCTION PROJECTS UNDERWAY!
Blissfield Community Schools Strategic Plan Facilities Team.
COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE.
February 16, Tonight’s Agenda  Review Assets and Challenges From Last Meeting  Review Necessary Assumptions  Look at Possible Considerations.
“Children First!” ENCINITAS UNION SCHOOL DISTRICT “Children First!” PROPOSITION P.
FACILITY PLANNING October 1, :00 PM – Raymond School Tour 6:30 PM – Interactive Workshop Raymond Community Workshop.
Measure G Overview March 9, Measure G School Facility Improvement East Side Union High School District To provide greater security and safety, relieve.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
Sports Complex Proposal GARY ROBERTS AND TRAVIS PALMER.
Finance and Facilities. DuPage County, IL EAV Growth History (Five Year Average: -2.15%)
School District Merger Study Crown Point Central School and Ticonderoga Central School Facilities April 17, 2013 Castallo and Silky Education Consultants.
Bond Election Presentation 2014 Webb Consolidated ISD.
Glenbard Township High School District 87 Facility Master Plan Steering Committee July 20, 2011.
Coloma Community Schools Community Forum #2 October 25, 2011.
St. Ambrose University Main Campus Planned Institutional District Application December 15, 2011.
WISH LISTS. GHS Install building wide phone system w/voic Remodel Office area w/AC Enlarge parking lot near LC Replace asbestos floor tile Pave gravel.
Dirty Tour December 2005 UN Capital Master Plan. 2 Dirty Tour- introduction The UN building was a state-of-the-art, code compliant structure when it was.
Fullerton College Physical Education Project Community Meeting March 11, 2009.
Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969Proposed Library for the Future.
S.M.A.R.T. Project Proposal December 9, 2014 Referendum.
November 6 th Referendum Information School District of Horicon.
Where We Are, And How We Got Here Somersworth School District November 27, 2007.
$18 million bond Construction of new Junior High campus Construction of safety improvements at Elementary School campus  Storm Shelter  Fire Safety.
1 NEW FAIRFIELD FREE PUBLIC LIBRARY Renovation Project
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
HENDERSON MIDDLE SCHOOL “The Grand Old Campus” CAMPUS FACILITY ISSUES.
Focus Areas Learning environments that meet the needs of today’s learners Safe and secure buildings and grounds Improve district infrastructure.
Maintenance & Operations Replacement Levy and School Improvements Bond Election Day: February 9, 2016.
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS High School Building Project.
Option 1 New Construction (10,000 Square Feet) – Secure Entrance / Administrative Offices – Lobby / Connection to Greeno Building – Weight Room Renovations.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
Energy Conservation Building Upgrades Alma School District.
Riley County – USD 378 Community Forum 2 23november2015 Riley County School District.
South Greenville Recreation Center and Park Master Plan.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
2007 DSISD School Bond Program DRIPPING SPRINGS INDEPENDENT SCHOOL DISTRICT Bond Election: November 6, 2007.
District Local Planning Committee Orientation Part 2 Trimble County Schools Kentucky Department of Education Division of District Support - District Facilities.
Quincy School District’s Vision For the Future Election Day: February 9, 2016.
SCHOOL #1 BALLOT QUESTION AND PROPOSAL Fall, 2016.
Oconee County Schools Five Year Facility Study April 27, 2011.
Facilities Focus Group
White Pigeon Community Schools
Cornwall Central School District
School #1 Ballot Question and Proposal
Southern Lehigh School District
VCSD Capital Project Forum
Dr. Joseph Meloche Superintendent of Schools Mrs
4 November 2013 LEHIGHTON AREA SCHOOL DISTRICT.
UNION GROVE ELEMENTARY REFERENDUM
Facilities Modernization Program
Educational Support Center
Pillager Public School District Community Survey Results
Recent Bond Accomplishments
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Master Facilities Committee Evaluation and Identification
Chimacum District Facility & Program Plan
Stoughton Public Library
East Troy Community School District Community Survey Results
Dixon Middle School Project Update
Zumbrota-Mazeppa School District Community Survey Results
Presentation transcript:

EDUCATION FIRST FACILITIES COMMITTEE

THE FACILITY COMMITTEE WAS CREATED IN NOVEMBER 2012 TO COMPLETE A THOROUGH STUDY OF DISTRICT FACILITIES. MEMBERS OF THE COMMITTEE INCLUDE RESIDENTS FROM ALL PARTS OF THE DISTRICT. TEACHERS, PARENTS, FARMERS, RANCHERS, AND A WIDE VARIETY OF PROFESSIONS ARE REPRESENTED. FACILITIES COMMITTEE

FACILITY COMMITTEE COMMENTS – READING Positive: Small classroom environments. Lobby/concession area. Building layout, creates good flow. Great gym environment. Stage performance is large with good storage. Great lighting throughout facility Two computer labs

FACILITY COMMITTEE COMMENTS – READING Issues: Office layout is isolated, creates safety and supervision concern. Condition of older bathrooms. Aged locker rooms. Longevity of gym floor, cant be sanded again if damaged. Not one level throughout facility. Location in relation to rest of district. Older windows & doors not energy efficient.

FACILITY COMMITTEE COMMENTS – AMERICUS Positive: Size of elementary classrooms. Advantage of 2 hallways – provides separation for middle & elementary levels. Versatility of rooms – more modern feel. One level – easier access to rooms. Football field/softball diamond/nice concessions/evening lighting Classrooms technologies.

FACILITY COMMITTEE COMMENTS - AMERICUS Issues: Settling of building/Grading on outside/Flooding. Mold in basement. Limestone on outside of building wearing down. Window AC units very loud disrupting teach lectures. Office location hard for visitors to locate Security concerns – hard to monitor visitors with current office location Size of lunchroom

FACILITY COMMITTEE COMMENTS - AMERICUS Issues: Infrastructure cannot always support new classroom technologies. Poor restroom facilities. Lack of gym seating for sporting events & accessing the seating. Lack of track facilities. Small locker rooms. Variance of temperature from room to room. Storage space throughout facility.

FACILITY COMMITTEE COMMENTS - AMERICUS Other Comments: 25 students maximum per middle school classroom. Increased enrollment decreases functionality. Increasing class sizes except in kindergarten ( ) One elementary class with enrollment of 27. Disparity in K-5 enrollment Americus/Reading

ARCHITECT REVIEW - AMERICUS Metal roofs showing signs of deterioration. Roof in fair condition, reaching end of life span. Exterior cracking result of building movement. Metal panel siding showing signs of rust & fastener failure. Majority of windows single pane or seals have failed. Restrooms dont meet ADA standards & guidelines. Window AC units unable to control humidity. Limited IT & electrical infrastructure.

ARCHITECT REVIEW - AMERICUS Life Safety Issues: Fire separation. Non-rated fire doors. Non-compliant corridor doors. Secure vestibule. Mold & mildew growth. Air quality. Exit plan/path from the basement.

FACILITY COMMITTEE COMMENTS - NHHS Positive: Lower number of structural issues. Better drainage. Majority of classrooms are adequately sized. Freshmen lockers located in separate hallway. Nice gym/seating for sporting events. Large kitchen space. Visibility of office in entryway. Classrooms technologies. However, infrastructure does not always support them.

FACILITY COMMITTEE COMMENTS - NHHS Issues: Mobile units built to be temporary. West unit in poor condition. Lack of electrical units due to building infrastructure. Concern with age & adequate number of work stations in science room. Window AC units very loud disrupting teach lectures. Shop building houses woodworking and welding – concern for fire. Lack of ventilation in shop, science & art rooms

FACILITY COMMITTEE COMMENTS - NHHS Issues: Infrastructure cannot always support new classroom technologies. Floor in shop class, concern about students slipping. Location of secretarys office – cannot monitor those entering & exiting. Aged roof on shop – concern with water leaks damaging equipment. Lack of designated dining area for various school functions.

FACILITY COMMITTEE COMMENTS - NHHS Issues: No commons area. Efficiency of windows throughout the building (i.e. water and wind blowing in) Baseball and softball fields off campus in two different locations. Difficult for spectators to attend both. Significant costs for football and track facilities. Lack of adequate facilities for fine arts. Location long distance for students to drive/travel.

FACILITY COMMITTEE COMMENTS - NHHS Other Comments: Lower student population equals less course opportunities. Vocational opportunities for students in welding classes. Grants available for welding equipment, but no room for additional equipment in current building. Do not anticipate growth in student population with current structure of facilities and lack of ability to provide expanded course opportunities.

ARCHITECT REVIEW - NHHS Building movement evident from exterior cracking. Majority of windows single pane un-insulated. Concrete façade is spalling. (Face layer is falling off) Metal roof on wood shop is rusting. Temporary classrooms structures show significant weathering. Window AC units dont provide adequate air quality. Limited IT and electrical infrastructure. Limited quality teaching space.

ARCHITECT REVIEW - NHHS Exposed & unprotected gas lines in science rooms. Restrooms dont meet ADA standard & guidelines. Inaccessible public restrooms in Gym, locker room facilities, stage & elevated seating. Football field access. Life safety include fire separation, secure vestibule, non-compliant corridors & storage areas. Exterior includes press box, pavement replacement & repair, current track & field requirements.

HERINGTON SCHOOL VISIT K-12 enrollment – 480 New addition PreK-5 th grade for 240 current students up to 300. $14.9 million with no changes to high school. Demolished old grade school built in Building itself was good, but interior was not. Renovation would cost 60-70% of new costs. Geothermal heating/cooling. All rooms have their own exchanger in enclosed 2 nd story. Separate entrance for parents and busses. Visitors entrance limited through office.

HERINGTON SCHOOL VISIT Common kitchen area with two access and serving areas to separate cafeteria rooms – elementary and middle/high school. Concession by kitchen. Receiving area off kitchen for deliveries. Have 3 gyms Building set up for wireless. Speaker systems in classroom for equal sound.

HERINGTON SCHOOL VISIT

BASEHOR-LINWOOD SCHOOL VISIT Middle School has 490 students/built to house 700. Built on 80 acres with practice track. 110,000 sq. ft. cost $21.5 million did not include land acquisition, off-site development, furnishings or design fees. All electric with gas service only in kitchen. All classrooms have wireless Internet service.

BASEHOR-LINWOOD SCHOOL VISIT

Frequently Asked Questions Why hasnt the school district kept up with maintenance of buildings through the years? Each mill levied in USD #251 raises a minimal amount of funds. Capital Outlay Funding has been about $150,000 annually. To replace the roof at NHHS would be $750,000 or 5 years of capital outlay levies.

Frequently Asked Questions If we remodel the current buildings, how long will it take and how will school continue to be held? HTK estimates that a remodeling project will take about 2 years. It would be a challenge to keep school in session during this time frame. One of the options would be to conduct school in an alternate location. No alternate locations have been identified.

Frequently Asked Questions If we remodel, are there any requirements in conjunction with the American Disabilities Act (ADA)? Yes. For every $1 spent on remodeling, $.20 must be spent on ADA issues until the building and location are ADA accessible.

Frequently Asked Questions If a new building is built, has a new location been identified? No definite location has been identified. However, HTK has identified several needs for a building site. Adequate water pressure and three-phase electrical service are a must. Natural gas availability would help keep utility costs down.

Frequently Asked Questions What would happen to the existing buildings if a new K-12 was constructed? The committee has not addressed this question at this time. As with everything else, the final decision would be made by the Board of Education.

Frequently Asked Questions Is there information available about the number of USD #251 students attending school in other school districts? Yes, information is available for the school year. 120 North Lyon County students attended school outside the district. The breakdown of where these students attended school is: Emporia – 67 students (56%) Osage City – 20 students (17%) Mission Valley – 15 students (12%) All others – 18 students (15%)

OPTIONS PROS REMODEL PRO: -Keep elementary schools in Reading & Americus -Less building costs NEW K-12 PRO: -All students in one location. Families no longer have students in Reading, Americus & NHHS. -Better able to manage elementary class sizes so teachers & students will have more comparable teaching & learning experience. -Able to manage jr. high & high school courses better to have more courses available for these two levels. -Consolidation savings could be used for introducing new programs/classes.

THANK YOU FACILITIES COMMITTEE