LSSIP Objective AOP05 Note: objective postponed 12 months in ESSIP Plan Edition 2015.

Slides:



Advertisements
Similar presentations
Objective ENV01 ESSIP Plan 2013 Bernd HILL DSS/EIPR
Advertisements

Objective AOM 19 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective FCM05 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective AOM 21 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
LSSIP Objective AOP04.2.
Objective SRC-CHNG ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
LSSIP Objective AOP04.1.
Hans Koolen NMOC/CFMU Network Operations Services
Objective INF04 ESSIP Plan 2013 Ana Paula FRANGOLHO DSS/EIPR
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR
Objective ATC 15 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
LSSIP Objective AOP01.2.
Objective AOM 13.1 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective COM11 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective COM09 - Migrate ground international or regional X.25 data networks or services to the Internet Protocol (IP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR.
Objective FCM01 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective COM10 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective SRC-SLRD ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
Objective NAV03 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Marc Deboeck ADQ Implementation Workshop 29 May 2013 Directorate Single Sky (SES) Support to CAA-NSA Single Sky Implementation Support to NSAs.
Objective ATC 17 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
17th February 2004: Slide 1 DG Transport and Energy OATA Workshop 17th February 2004 European Commission OATA and the Single European Sky.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
Objective NAV10 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective INF07 ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR
The European Organisation for the Safety of Air Navigation Objective AOP04.1.
Objective ITY-SPI ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
LSSIP Objective AOP04.2.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/2012/ASBU/Nairobi.
Objective ITY-SPI ESSIP Plan 2013 Ana Paula FRANGOLHO DSS/EIPR
Objective ATC 15 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective ATC 12 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective ATC 17 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective COM11 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective COM10 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective AOM 19 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR
Objective ATC 02.6 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR
Objective ATC 02.2 ESSIP Plan 2014 Ingrid FEIJT DPS/PEPR
The European Organisation for the Safety of Air Navigation Objective AOP05.
Objective ITY-ADQ ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR
Objective FCM03 ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
Objective ATC 16 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective AOM 21 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR
Objective ATC 02.7 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR
Objective FCM04 ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
Objective ATC 02.2 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Objective FCM01 ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
The European Organisation for the Safety of Air Navigation Objective AOP03.
The European Organisation for the Safety of Air Navigation Objective AOP05.
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2015 Oscar ALFARO DPS/PEPR
Objective FCM05 ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
Objective ATC 07.1 ESSIP Plan 2013 Luca DELL’ORTO DSS/EIPR
European Commission 1 Interoperability of Air Traffic Management systems for the Single European Sky.
Workshop on preparations for ANConf/12 − ASBU methodology
Objective ATC 07.1 ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
Objective ITY-ADQ ESSIP Plan 2015 Ana Paula FRANGOLHO DPS/PEPR
Objective ITY-COTR ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
Objective NAV10 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective COM10 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective AOM 19 ESSIP Plan 2015 Agnieszka DYBOWSKA DPS/PEPR
London 14 October 2015 Freek De Witte Head of Stakeholder Relations
WG69 Status Report to ETSI
Objective NAV03 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
LSSIP Objective AOP04.1.
Objective INF04 ESSIP Plan 2015 Ana Paula FRANGOLHO DPS/PEPR
Objective COM11 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective ITY-AGDL ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective ITY-AGVCS2 ESSIP Plan 2015 Oscar ALFARO DPS/PEPR
LSSIP Objective AOP03.
The ATM Standardisation Coordination Group
Presentation transcript:

LSSIP Objective AOP05 Note: objective postponed 12 months in ESSIP Plan Edition 2015

Objective AOP05 Comprehensive Explanation Link to European ATM Master Plan Most important SLoA(s) Supporting Material ESSIP Report 2014 Objective Coordinator’s Analysis, recommendations, tips & tricks Conclusions Links and contacts November 2015

Comprehensive Explanation Implement Airport Collaborative Decision Making (CDM) This objective aims at implementing A-CDM to enhance the operational efficiency of airports and improve their integration into the Air Traffic Management Network (ATMN) while maintaining or improving the safety levels; The applicability area is presented in Table 8 of Part IV Annex B of the ESSIP 2012 document; Initial operational capability - 01/2004, Full operational capability - 01/2016 PCP Related November 2015

Link to European ATM Master Plan [AO-0501]-Improved Operations in Adverse Conditions through Airport Collaborative Decision Making; [AO-0601]-Improved Turn-Round Process through Collaborative Decision Making; [AO-0602]-Collaborative Pre-departure Sequencing; [AO-0603]-Improved De-icing Operation through Collaborative Decision Making; Enablers: PRO-204a PRO-204b PRO-204c AIRPORT-31 PRO-213a PRO-213b PRO-214a PRO-073 November 2015

Most important SLoA(s) APO01/ASP01/USE01- Define and agree performance objectives and KPIs at local level specific to airport operations in accordance with A-CDM Manual guidelines; APO02/ASP02/USE02 - Define and implement local airport operations procedures for information sharing through Letters of Agreement (LoAS) and/or Memorandum of Understanding (MoU) in accordance with A-CDM Manual guidelines; APO03/ASP03/USE03 - Define and implement local procedures for turnaround processes in accordance with CDM manual guidelines (baseline CDM); APO05 Define and implement the exchange of messages, Flight Update Message (FUM) and Departure Planning Information (DPI) between CFMU and the airport in accordance with A-CDM Manual guidelines; APO06/USE05 Define and implement procedures for CDM in adverse conditions including de-icing according to airport CDM Manual guidelines. November 2015

Supporting Material EUROCAE-ED-141-Minimum Technical Specifications for airport Collaborative Decision Making (Airport-CDM) Systems, dated October 2008; EUROCAE-ED-145-Airport-CDM Interface Specification, dated October 2008; EUROCAE-ED-146-Guidelines for Test and Validation Related to Airport CDM Interoperability, dated October 2008 Url: http://boutique.eurocae.net/catalog/index.php November 2015

Supporting Material EUROCONTROL-Airport CDM Functional Requirements Document, Edition 4.0, dated May 2009; EUROCONTROL-Airport CDM Implementation Manual, Edition 4,0, Dated 01.04.2012 Url : http://www.euro-cdm.org/library_eurocontrol_implementation.php ETSI-EN303 212, V1.1.1 - Airport Collaborative Decision Making (A-CDM); Community Specification for application under the Single European Sky Interoperability Regulation EC 552/2004, dated 01.06.2010, OJ 2010/C 168/04 Url : http://webapp.etsi.org/workprogram/SimpleSearch/QueryForm.asp November 2015

ESSIP Report 2014 November 2015

Objective Coordinator’s Analysis, recommendations, tips & tricks More elaborate explanation of chosen progress assessment is required. Objective aligned with Deployment Programme and PCP – postponed for 12 months November 2015

Links and contacts Objective Coordinator: Predrag Vranjkovic, +32 2 729 3257 predrag.vranjkovic@eurocontrol.int Yi Xiong, +32 2 729 3528 yi.xiong@eurocontrol.int DNM Objective Expert: Paul Adamson, +32 2 729 5183 paul.adamson@eurocontrol.int November 2015