PGA South Site Phoenix Goodyear Airport South CAG Meeting of November 7, 2013 Travis Barnum 1.

Slides:



Advertisements
Similar presentations
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 107.
Advertisements

1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 14.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 44.
R188 Project Overview Overall Status Highlights Progress
Reorganization of Procurement Services for Public Works Construction
Doors Open Innisfil 2014 October 10, What is Doors Open?
The Water and Sanitation Project The Provision of Water and Sewer Connections to Toilet blocks in Informal Settlements in EThekwini.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Beneficial Occupancy Readiness Evaluation Plan Update Brian Heneveld, P.E., CIH NSLS-II BORE Coordinator Conventional.
Michael Hopkins, P.E., Assistant Chief, DAPC. GP Development PBR Updates Other Updates Short BAT History 10 ton/yr BAT.
Presenter: Karen Fligger, US EPA. Decentralized Wastewater Treatment Managed onsite or cluster wastewater systems used to collect, treat, and disperse.
Purpose To update the existing master plan To present development options for the airport To create an airport layout plan to document current and future.
Certification of Compliance By Evita Lagard
Event/ date: WB WS UWWTD & emissions, , Skopje Author: Anita Künitzer 1 West Balkan Regional workshop on Urban Waste Water Treatment Directive.
David Edmunds Environmental Program Specialist Drinking Water Program Department Of Environmental Conservation Drinking Water Watch.
Enagás, REnagás, REN and TIGF EN and TIGF IT implementation plans and agreements with PRISMA 25 th IG meeting 13 th December 2013.
Southwest Treatment Area The Coliseum Boulevard Plume (CBP) is a groundwater plume that contains trichloroethylene (TCE). TCE is a common solvent that.
BOND PROGRAM UPDATE Long Beach Community College District Citizens’ Oversight Committee Meeting October 11, 2004.
Buffalo Lake Dam Project Update date Meeting June 30, 2012.
CERN IT Department CH-1211 Genève 23 Switzerland t The Wigner Data Centre An Extension to the CERN Data Centre.
MPCA Citizens’ Board Information Item February 25, 2014.
SWMU 48, 62 and AOC G/SWMU 49 Update Joint Base Charleston Weapons Partnering Meeting December 4, 2013.
AHMET UCANOK JOHN E. ELVIS Pump and Treat of Contaminated Groundwater at the United Chrome Superfund Site Corvallis, Oregon.
Federal Mogul Department for Environmental Protection Kentucky Division of Waste Management February 10, 2015 Presented by Chris Jung To Protect and Enhance.
Town Hall Meeting 12 March 2008 Carmichael Area Aerojet Groundwater Remediation Progress Update 12 March 2008.
Rule Change Update MPCA 1/13/ Mid-Sized ISTS (MSTS)
Vermont Yankee VSNAP Presentation February 22, 2011 Mike Romeo Director NSA.
Cedar Valley, Utah County, Utah Cedar Valley Water Rights Management Plan Status and Review March 7, 2013 Teresa Wilhelmsen, P.E. UL/JR Regional Engineer.
Project Overview and Status Update SCC Board of Trustees Study Session February 22, 2012.
Town of Hamilton Community Information Meeting For Well Harmony Intermediate School May 13, 2010.
Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997 Located west of Highway 101 Access to Gaviota Beach and Hollister.
Background and lessons learned Managers Meeting February 13, 2014.
University of Toronto Mississauga Campus: UTM Master Plan Update Campus and Facilities Planning | March University of Toronto Mississauga Campus.
Site Activities Update Park – Euclid RP Group Community Advisory Board Meeting January 16, 2013.
7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site August 20, 2013.
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
Haley & Aldrich, Inc. 1 Preliminary Draft Community Advisory Board West Van Buren WQARF Site WVB Working Group - Draft Final Feasibility Study Work Plan.
SITE STATUS UPDATE TOP STOP PETROLEUM RELEASE SITE GUNNISION, UTAH Morgan Atkinson – Division of Environmental Response and Remediation, Project Manager.
Aerojet Environmental Update Carmichael Town Hall Meeting March 12, 2008 Michael Girard Aerojet Environmental Site Remediation (916)
1 LOCKFORMER ELECTRIC RESISTIVE HEATING CASE STUDY U.S. EPA Emergency Response Branch Steve Faryan, On-Scene Coordinator ,
1 Moab Uranium Mill Tailings Remedial Action (UMTRA) Project Site LTS&M Planning LTS&M Conference Grand Junction, CO November 16, 2010 Donald Metzler U.S.
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site February 19, 2013.
Case Study of Groundwater Contamination at the Delphi Corporation, Wyoming, Michigan Dr. Peter E. Riemersma Department of Geology Grand Valley State University.
Stephanie Lyn Koehne Amec Foster Wheeler Environment & Infrastructure, Americas (Amec Foster Wheeler) Phoenix-Goodyear Airport- North (PGA-North) Superfund.
Introduction to Phoenix-Goodyear Airport Superfund Site
Mark Holmes City of Goodyear Water Resources Manager Partnering for Success.
Good Afternoon!. Construction Update Airside Center Roof Construction began in May Scheduled completion March.
Advisory Council 8 th Meeting 20 th February 2008 Newpark Hotel, Kilkenny.
Western Avenue WQARF Site Western Avenue/Phoenix Goodyear Airport CAG Meeting of August 8, 2013 Delfina Olivarez.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
Division of Water Quality Coal Ash Storage, Use, & Disposal: Update Ted L. Bush, Chief Aquifer Protection Section Division of Water Quality “To protect.
ESAC Meeting December 1, pm LOS REALES LANDFILL UPDATE Entrance Facility Rodeo Wash Erosion Control Structure Scale House Drainage and other Stormwater.
COUNCIL UPDATE – APRIL 13, 2016 Perfluorinated Compounds (PFCs)
ENVIRONMENTAL PROGRAMS Copyright © 2007 Exceptional Events and Data Collection in the Vicinity of the West 43 rd Avenue Monitor MAG Regional Council April.
The World of AUL Presentation by: Atul Pandey, P.E. PANDEY Environmental, LLC 2016 Ohio Brownfield Conference April 7, 2016.
North Park Sandy Breuer, Director of Parks and Recreation Craig Schlichting, Director of Community Assets and Development.
Tsan-Liang Su, Ph. D. and Mahmoud Wazne, Ph. D. Stevens Institute of Technology Hoboken, New Jersey, USA Questor Research Proposal Presentations November.
Pre-Bid/Proposal Meeting
Perris Water Filtration Plant Membrane Upgrade – Phase I
U.S. Air Force Cooperative Agreement for Perfluorinated Compounds Response Activities, Phase 2 (ESCA II) Jayne Joy, P.E. July 18, 2017.
Chemical Metals Industries, Inc. (CMI)
TECHjOSH.COM TechJosh.com.
Groundwater Sustainability
Regional Water Availability and Superfund
Thank You!! For More Information Visit: m/ Call to :
Chemical Metals Industries, Inc. (CMI)
Harbour Island Force Main Replacement
Sewage System Summary Village of Schoolcraft Kalamazoo County, Michigan Vern Johnson, REHS, Environmental Health Chief Lucus Pols, REHS, Environmental.
Ward Park Restroom Timeline
Presentation transcript:

PGA South Site Phoenix Goodyear Airport South CAG Meeting of November 7, 2013 Travis Barnum 1

PGA South Site 2

TCE – Subunit A (1995 and 2013) 3

Q1 and Q2 Groundwater Monitoring Results – Subunit A TCE

Q1 and Q2 Groundwater Monitoring Results – Subunit A Figures and Charts provided by Haley & Aldrich, Inc. for GTRC Chromium 5

Current State of Subunit C North - TCE New Wells GMW25LC and GMW-26LC 6

Proposed location for E-103 Existing extraction well E-102 Additional Subunit C Extraction Well Location 7

Current State of Subunit C North - Chromium 8

Status Update Groundwater Model DUER at Former Chromium Beds GAC-04 Replacement Status Chromium Investigation Lux Air Facility Development Beneficial Reuse of Treated Water 9

Proposed water conveyance includes installation of a 6,000-foot long subsurface pipe from the Subunit C GWET to a COG connection at the Bullard Wash. GTRC is anticipating a letter from EPA to acknowledge that the proposed discharge complies with the requirements of the ROD. ADEQ provided a letter of support to COG in a letter dated January 28, GTRC has submitted Sub C Treatment System analytical results and ADEQ is finalizing substantive discharge monitoring requirements. Final engineering drawings were approved by COG, COP, and FAA. Pre-bid site visit was held 6 November. Status Update: Beneficial Reuse of Subunit C Treated Water 10

PGA South Site Thank You-Questions Travis Barnum Project Manager , Wendy Flood Community Involvement Coordinator , 11