7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site February 19, 2013.

Similar presentations


Presentation on theme: "7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site February 19, 2013."— Presentation transcript:

1 7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site February 19, 2013

2 Monitor well network sampled January 2012. Ground water samples indicated a significant increase of tetrachloroethene (PCE) concentrations in the source area wells at both properties. Increasing water table elevations are suspected of mobilizing additional contaminants from the soils to the groundwater. Data received from Salt River Project indicated their well, located approximately one-half mile north of the source area, has been impacted at the Aquifer Water Quality Standard of 5 parts per billion. This well is cased from land surface to a depth of 600 feet and the interval open to the aquifer for water production is from 240 to 600 feet. 2012 Groundwater Monitoring Results

3 7 th Avenue and Bethany Home Road Site Map

4 North-South Geologic Cross section

5 2012 Groundwater Monitoring Results

6

7

8 SRP Well 10.1N-13.5E Historical PCE Results

9 Final Remedial Investigation Report completed in April 2011 included the Remedial Objectives (ROs) for the site. Based upon review of public comment, the ROs are based on the following: Protect against possible exposure to hazardous substances in surface and subsurface soils that could occur during development of property based upon applicable zoning regulations. Protect against possible leaching of hazardous substances from the upper portion of the aquifer into deeper portions of the aquifer where groundwater use is occurring. Remedial Objectives Review

10 Based on public comment, ROs for current and future agricultural groundwater use in the 7th Avenue and Bethany Home Road WQARF site are: “To protect the supply of groundwater for irrigation use and for the associated recharge capacity that is threatened by contamination emanating from the 7th Avenue and Bethany Home Road WQARF site...” Remedial Objectives Review

11 Feasibility Study (FS) completed November 2012. Due to increases of PCE concentrations at the site, the FS evaluated three methods to reduce concentrations in the groundwater at the source area. 1. Enhanced reductive dechlorination (ERD) 2.In situ chemical oxidation (ISCO) 3. Groundwater Extraction and Treatment (GWET) Feasibility Study

12 Feasibility Study Cost Comparison

13 Based on the cost and other factors, ERD was selected for the pilot test at the site. ERD is preferred over the similarly priced GWET because it has the ability to destroy the volatile organic compounds in place and the potential to be completed in a quicker time frame. Feasibility Study

14 Dechlorination Occurring at MW-12

15 Feasibility Study/Pilot Test

16

17 Questions? Questions

18 Contact Information Scott Goodwin, Project Manager Remedial Projects Section sdg@azdeq.gov (602) 771-4452, 1-800-234-5677 ext 771-4452 Wendy Flood, Community Involvement Coordinator Remedial Projects Section wv1@azdeq.gov (602) 771-4410, 1-800-234-5677 ext 771-4410 Contact info