Designers’ Manual Overview and Chapter Contents

Slides:



Advertisements
Similar presentations
Roles & Responsibilities in Construction Management
Advertisements

THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
Program Controls Systems & Processes Board of Trustees Workshop October 11, 2005.
Field Orders on Construction Contracts Guidance Document CLC-8 May 13, 2013.
Managing a Successful Mechanical System project Following design – what next?
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Subcontracts 101 By Mitali Ravindrakumar USC Collaboration between Parties Perform Subcontractor Analysis Sponsor - Fund Project/Subcontr act Negotiate.
14.21 Contract Closeout Procedure Update Notice of Completion, Release of Retention and Punchlist Resolution December 8, 2005.
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Facilities and Construction: Did you know your GPO can help?
Conditions of the Contract for Construction
ESTIMATING By Laith Jacob.
PROCEDURES FOR SELECTING THE CONTRACTOR
Construction Contract Documents
Project Delivery Overview June 2015 Final PD Training FMD WUSM 6/15/15 1.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Standards of Practice Course
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT August 21, 2014.
Jason Martin February 2013 Design Section Engineer’s Manual 1.
The Construction Specifications Institute Session 4 CONSTRUCTION DOCUMENTS Part 1 Project Delivery Education Program Construction Document Technology (CDT)
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Presented by Molly Skorpik at the 2011 Montana Association of Dam and Canal Systems Conference Presented by Molly Skorpik at the 2011 Montana Association.
CEM 520 Construction Contracting Dr S. Almohawis Course Content.
TH 2 – Wilton Bridge Replacement Design-Build Project S.P March 5, 2009 Todd Vonasek, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING.
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
MARCH 9, 2006 Boating Safety and Enforcement Grant Program Regulations Stakeholder Workshop Proposed Conceptual Regulations Department of Boating and Waterways.
IDM Chapter 104 Utility Coordination Gail Lee Utility and Railroad Engineer, INDOT June 10, 2015.
Procurement Authority Representative Roles and Responsibilities Amanda Price, Program Development Coordinator, Planning and Programming, Transportation.
Conditions of the Contract ACT Objective To provide an overview of the Conditions of the Contract, their purpose, content, and relationship to.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Overview of Grant Agreements - Agreement Process - Roadmap to the Agreement Document - Agreement Requirements/ Compliance Issues - Timelines for Reporting.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
JEOPARDY FINANCIAL MANAGEMENT EDITION Documentation Procurement Mystery Cost Principles Administrative Requirements Q $100 Q $200 Q $300 Q $400 Q $500.
1 © 2013 Protiviti Inc. All Rights Reserved. This document has been prepared for use by OOCEA’s management, audit committee, and board of directors. This.
An Overview Of The MBP CM Leadership Manual Presented by: Robert J. Carter, CCM Robert M. Pfeiffer, CCM.
Managing Quality with Quality Through the Construction Management Leadership Manual Presented by: Aleksandr Sergek, PE, PMP Allison Justiniano, LEED AP.
Construction Management At Risk Process
May 4, 2011 Jenefer Youngfield Utah State Office of Education Utah K-12 Public School Construction Education and Training.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
The Intricacies of the Beginning and the End of a Project CM Leadership Manual Presented by: Todd Scholtz, LEED AP Carlos Sanchez, LEED AP BD+C.
- Special Education Needs (SEN) Network Administrative and Financial Aspects.
Construction Documents Drawings Specifications Bid documents Construction Sketches and other data.
“702 KAR 4:160, Capital construction process” 1.  To be developed as procedures document for K-12 school construction projects  Allows KDE to update.
USAID Afghanistan Engineering Support Program (ESP) Pre-Bid Meeting July 14, 2015.
IDM Chapter 104 Utility Coordination Gail Lee Highway Utility Engineer, INDOT June 21, 2016.
Procurement & Strategic Sourcing
DOING BUSINESS WITH ALBERTA INFRASTRUCTURE
RFP EMISSIONS SOURCE VALIDATION
CONTRACT DOCUMENTS & CONSTRUCTION
Joint Parking Task Force Update Procurement & Strategic Sourcing
State Aid Construction
9/18/2018 Bids CONTRACTING Khamis…..
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Designers’ Manual Appendix Contents
Request for Proposal and Specifications for
Classroom Enclosure – Phase II Bonnie Beard Agriculture Center
Request for Proposal and Specifications for
Administrator of Construction Todd Wilson Senior Project Manager
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
DBIA Manual of Practice
Cost Containment Working Group Board Update
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing
State Aid Construction
FPM School of Social Work Phase II Renovation Project No
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing FPM ART GALLERY DESIGN SERVICES
Presentation transcript:

Designers’ Manual Overview and Chapter Contents Training Session for LGIs June 20, 2018

PURPOSE: Help Develop and Execute Projects CHAPTER 1: INTRODUCTION 1.01 PURPOSE The Designers’ Manual provides standards, criteria, and guides for the development and execution of capital projects pursued under State Building Commission Authority. …augments but does not replace …the SBC-6 Standard Form of Agreement between Owner and Designer.

OWNER INFORMATION: System or Campus Specific Contact information Coordination with City/Campus utilities Staff contact information Local plans review process Team roles Plans rooms locations/contacts/website links Campus-specific payment processes Deliveries to campus Other as needed Requirements related to traffic, parking, and pedestrians circulation at and around construction site Template provided for LGIs to modify as desired.

Chapters: Sequenced Like a Project Chapter 1: Introduction Chapter 2: Designer Agreement and Payments Chapter 3: Design Chapter 4: Project Manual Guide Chapter 5: Procurement Chapter 6: Construction Chapter 7: Closeout and Record Documents

Appendices: Project Admin Guidance and Tools Appendix 1: Administrative Forms Appendix 2: Standard Bidding and Construction Documents Appendix 3: System or Campus Specific Guidelines and Requirements

Chapter 1: INTRODUCTION 1.01 PURPOSE 1.02 ORGANIZATION 1.03 REVISIONS 1.04 THE STATE AS OWNER 1.05 STATE ORGANIZATION REFERENCE LIST 1.06 SELECTION OF DESIGNER

Chapter 1: INTRODUCTION 1.01 PURPOSE 1.02 ORGANIZATION 1.03 REVISIONS 1.04 THE STATE AS OWNER 1.05 STATE ORGANIZATION REFERENCE LIST 1.06 SELECTION OF DESIGNER

Chapter 1: INTRODUCTION (continued) 1.07 OVERVIEW FLOW CHART FOR DESIGN/BID/BUILD PROJECTS 1.08 ELECTRONIC SIGNATURES, COUNTERPARTS, AND PHOTOCOPIES

Chapter 2: DESIGNER AGREEMENTS AND PAYMENTS 2.01 STANDARD FORMS OF AGREEMENT AnD ATTESTATION FORM 2.02 STANDARD FORM OF AGREEMENT BETWEEN OWNER AND DESIGNER 2.03 STANDARD FORM OF SUPPLEMENT TO AGREEMENT BETWEEN OWNER AND DESIGNER

Chapter 2: DESIGNER AGREEMENTS AND PAYMENTS (continued) 2.04 ADDITIONAL SERVICES PROVIDED UNDER AGREEMENTS 2.05 REIMBURSABLE EXPENSES INCURRED UNDER AGREEMENTS 2.06 PAYMENTS TO DESIGNERS 2.07 EXAMPLE INVOICE FORMATS

Chapter 3: DESIGN 3.01 GENERAL 3.02 REGULATORY 3.03 OWNER consultant reviews 3.04 HIGH PERFORMANCE BUILDING REQUIREMENTS 3.05 SPACE EFFICIENCY AND COST ANALYSIS

Chapter 3: DESIGN (continued) 3.06 PROGRAM PHASE 3.07 SCHEMATIC DESIGN PHASE 3.08 DESIGN DEVELOPMENT PHASE 3.09 CONSTRUCTION DOCUMENT PHASE 3.10 FURNITURE, FIXTURES, AND EQUIPMENT (FF&E) ADDITIONAL SERVICES

Chapter 4: PROJECT MANUAL GUIDE 4.01 GENERAL 4.02 INSTRUCTIONS FOR SELECTED STANDARD DOCUMENTS (listed on next slide) 4.03 SPECIFICATIONS INSTRUCTIONS

Section 4.02: SELECTED STANDARD DOCS 00 00 01 Project Title Page 00 11 16 Invitation to Bid 00 11 19 Request for GMP 00 11 19 Invitation to Bid – Non-Construction 00 41 13 Bid Form 00 41 63 Bid and Agreement Form – Non-Construction

Section 4.02: SELECTED DOCS (continued) 00 42 23 GMP Summary 00 42 71 GMP List of Trade Subcontracts 00 42 75 GMP Disclosure of General Conditions 00 61 43 Three Year Roof Bond 00 72 13 General Conditions of the Contract for Construction 00 72 13.2 Supplementary Conditions – Demolition Requirements

Section 4.02: SELECTED DOCS (continued) 01 11 00 Summary 01 21 13 Allowances 01 21 15 List of Allowances 01 22 13 Unit Prices 01 22 15 List of Unit Prices 01 23 00 Alternates 01 57 23 Temporary Storm Water Pollution Control

Section 4.02: SELECTED DOCS (continued) 01 74 00 Cleaning and Waste Management 01 78 01 Closeout Submittals 01 78 02 Closeout Submittals 01 91 13 Commissioning 01 91 23 Performance Testing Identification Form 01 91 26 Performance Testing Procedures Form 01 91 29 Functional Performance Test Certification

Section 4.02: SELECTED DOCS (continued) 07 50 35 Existing Roofing System Warranty 07 50 36 Total Roofing System Warranty 07 61 02 Twenty Year Total Metal Roofing System Warranty

Chapter 5: PROCUREMENT 5.01 CONSTRUCTION PROCUREMENT DELIVERY METHODS 5.02 INITIATION OF THE BIDDING PHASE 5.03 PRE-BID CONFERENCE AND ADDENDA 5.04 BID TAB (TABULATION) PREPARATION 5.05 BID OPENING PREPARATION

Chapter 5: PROCUREMENT (continued) 5.06 BID OPENING 5.07 COMMUNICATION OF APPARENT RESULTS 5.08 DISPOSITION OF BIDS 5.09 AWARD OF CONTRACT 5.10 DESIGNER EVALUATION FOR DESIGN AND BIDDING PHASES

Chapter 6: CONSTRUCTION 6.01 APPLICABILITY TO NON-CONSTRUCTION PROJECTS 6.02 PRE-CONSTRUCTION CONFERENCE 6.03 NOTICE TO PROCEED and CONTRACT TIME 6.04 Logs, Progress Observations, and Field Reports

Chapter 6: CONSTRUCTION (continued) 6.05 Initial SUBMITTALS 6.06 RESPONSE EXPECTATIONS: 6.07 Allowances AND Unit Price BASED ALLOWANCES 6.08 PLANNING FOR CHANGES IN WORK 6.09 Subcontractor REPLACEMENT 6.10 Designer’s Order for a Minor Change

Chapter 6: CONSTRUCTION (continued) 6.11 Request for Proposal (RFP) 6.12 Claims and Proposals 6.13 Amendments 6.14 CHANGE ORDERS AND DIRECTIVES 6.15 CM/GC Contingency, Reserve Funds, and Pushes 6.16 CONTRACTOR APPLICATIONS FOR PAYMENT

Chapter 6: CONSTRUCTION (continued) 6.17 PROGRESS MEETINGS 6.18 PRE-CLOSE-OUT SUBMITTALS 6.19 SUBSTANTIAL COMPLETION 6.20 modifications after substantial completion

Chapter 6: CONSTRUCTION (continued) 6.21 FINAL INSPECTION 6.22 Contractor’s record documents and data binders 6.22 DESIGNER EVALUATION FOR CONSTRUCTION PHASE

Chapter 7: CLOSEOUT AND RECORD DOCUMENTS 7.01 final payment to contractor 7.02 Designer’s RECORD Drawings, Information, and Instructions 7.03 ONE-YEAR CORRECTIVE INSPECTION