TDB Database Internet Access

Slides:



Advertisements
Similar presentations
Avoiding Misunderstanding in Collaborative Digital Projects Presentation by Brenda Campbell, Images Canada Project Manager OLITA: Digital Odyssey, Toronto,
Advertisements

Draft JORUM Depositor Licence By Emanuella Giavarra LLM Chambers of Prof. Mark Watson-Gandy Amsterdam and London
Proposal for organising data collection and exchange in WP2.
Effort in hours Duration Over Weeks Or Months Inception Launch Web Lifecycle Methodology Maintenance Phases Copyright Wonderlane Studios.
2015 ANNUAL USER SURVEY Nick Rabbets Managing Director – TRICS Consortium Limited.
Credential Provider Operational Practices Statement CAMP Shibboleth June 29, 2004 David Wasley.
ILearnNYC Platform Session Objectives Provide an understanding of overall platform components, how they fit together and associated timelines Explain.
The FP7 How to submit a project electronically AN INFORMATION POINT FOR FP7 IN PALESTINE: Training Seminar of experts Nicosia, Cyprus November.
Web Trnsport – Beta Testing and Implementation TUG Roundtable Discussion Elizabeth Rodgers Info Tech, Inc. October 9, 2007.
Tools and enablers for building applications for EADS TETRA
What is Information Systems (IS)? Information systems (IS) consist of networks of hardware and software, people, and telecommunications that organizations.
COUNTER and the development of standards for usage reports Marthyn Borghuis, Elsevier COUNTER Executive Committee For: CALISE-Taiwan.
How does it work? Username Password Application Database Security Database Visual Guard User permissions PB Application PB objects modified dynamically.
Name Position Organisation Date. What is data integration? Dataset A Dataset B Integrated dataset Education data + EMPLOYMENT data = understanding education.
1 WIPO – Geneva – April 2005 European Commission – Research DG D. Dambois European Patent Attorney IPR disputes in international.
Igniting our potential Research Governance Issues in Higher Education Brunswick Sub Group: 2 March 2006 Standardised Agreements.
EuropeAid Delegated Co-operation November EuropeAid 2 SUMMARY BACKGROUND TO CO-FINANCING AND DELEGATED COOPERATION INDIRECT CENTRALISED MANAGEMENT.
The MICHAEL Project is funded under the European Commission eTEN Programme The multilingual catalogue of digital cultural heritage in Europe.
Community Sign-On and BEN. Table of Contents  What is community sign-on?  Benefits  How it works (Shibboleth)  Shibboleth components  CSO workflow.
Getting Started. Package Overview (GradeQuick)‏ Web-based grade book –Access Anywhere –Always Current Paper grade book “look and feel” Flexible grading.
NATIONAL CONFERENCE Intellectual Property Policies for Universities and Innovation dr. sc. Vlatka Petrović Head, Technology Transfer Office Acting Head,
BRISEIDE is supported by the CIP / ICT Policy Support Programme of the European Commission. BRIDGING SERVICES, INFORMATION AND DATA FOR.
EGEE is a project funded by the European Union under contract IST Roles & Responsibilities Ian Bird SA1 Manager Cork Meeting, April 2004.
Component D: Activity D.3: Surveys Department EU Twinning Project.
Community Sign-On and BEN. Table of Contents  What is community sign-on?  Benefits  How it works (Shibboleth)  Shibboleth components  CSO workflow.
Global Standards Management Process Henri Barthel General Manager Business Development EAN International.
ERASMUS + Care to Work project (2014) Abused no More project (2015)
EIFL Licensing Training 2: EIFL LICENCE AGREEMENTS
Nick Rabbets Managing Director – TRICS Consortium Limited
Margill New Generation Interest Calculation Software for Professionals Partnership Model Presented to National Structured Settlements Trade Association.
IP Review.
Training for developers of X-Road interfaces
2 March 2017 Jevgenija Sevcova, EIFL Programmes and events coordinator
Efficient and secure transborder exchange of patient data
Managing the Project Lifecycle
The Integrated Food Security Phase Classification in Sudan –Next Steps
Road Manager Module National Heavy Vehicle Regulator
NATIONAL DOSE REGISTER Steering Committee Meeting 28 August 2015
Oakville’s GIS Site Selection Tool
NMMU Upgrade Integrator 3 Integrator UG 2014 Greg Saunders
Section 12.1 Section 12.2 Discuss the functions of a Web site
International Training Centre of the ILO
COMMISSIONED TRICS SURVEYS & THE TRICS BUREAU SERVICE – AN UPDATE
EC-68 DOC 16.3 GOVERNANCE REVIEW
Mike Green Surrey County Council
Presented by Richard Laing
Gaps and priorities in sea basin observation and data
April Monthly Release GDPR Configuration Preview Printable Guide
Easy Website Creation Using WordPress
OECD Chief Statistician and Director, Statistics Directorate
Institutional Framework, Resources and Management
APPLICATION PROCESS Parents access the web address: to be on the “Welcome to Admissions Online Application for 2019” page.
Keeping Member Data Safe
Background to the development of a European Victimisation Survey
TRICS SYSTEM DEVELOPMENTS FOR DECEMBER 2018
Vanda Nunes de Lima 18th June 2009
Updating the TRICS Good Practice Guide for 2019
Road Manager Module National Heavy Vehicle Regulator
GMC visits: How to deal with them
PROGRAMME MANUAL Rachel Burn, Joint Secretariat
INSPIRE Development of Implementing Rules
EPAN – eGov WG EPAN Good Practice Information System
VERITE – Dissemination plan
Managing Private and Public Views of DDI Metadata Repositories
Why QRA monitor? Knowing what should be done for:
Phase one demonstration
TRICS AUSTRALASIAN DATABASE WORKSHOP
European Commission, DG Environment, Marine Unit
CFR Enhancement Session
Mobile Registration App Training Guide for Ambassadors
Presentation transcript:

TDB Database Internet Access Web Platform Launch Presentation to TDB AGM 2018 6/11/2018 Trips Database Bureau

Background Project initiated formally 2015 Desired outcomes Added value to members Better access to database Better security of our key asset More efficient administration (updates, distribution) Three development options (ourselves, piggy back on existing known partner system, private developer) 6/11/2018 Trips Database Bureau

Project process In parallel - legal agreements and technical work Partnership agreement Signed April 2017 (18 months – 10 versions) Contributions/commitments of parties, data access and IP rights, new survey programme, relationship between TDB organisation, TDB members and TRICS organisation, access prices to Australasian and UK databases, termination and conflict resolution, governing law. 6/11/2018 Trips Database Bureau

Project process Technical work Led by TRICS with joint specification review Modifying ex. TRICS platform – 2 way improvements/reconciliation Development specification - definitions, fields, data granularity, future methodologies, open text descriptors Beta testing process (2018): tech team, Board and support members, final tech review 6/11/2018 Trips Database Bureau

Database information All existing TDB database information is in new system. Survey collection: Survey sub-group being refreshed – all parties More regular releases enabled Review survey methodology (esp. data fields to be collected) Was Now TDB commissioned TDB commissioned (updated) RMS survey programme TDB member submissions 10-12 TRICS surveys / yr 6/11/2018 Trips Database Bureau

Basic structure TRICS site – choose Australia/NZ region Log On with username and password New user guides – on line 6/11/2018 Trips Database Bureau

Basic structure Trip Rate process 6/11/2018 Trips Database Bureau

Basic structure Trip Rate Process 6/11/2018 Trips Database Bureau

Basic structure List Sites Process 6/11/2018 Trips Database Bureau

Next steps User access licence Two way agreement between member and TDB/TRICS – to protect TDB asset and reputation Required to be signed before access provided to database Clarify access and support rights, and conditions of use Termination/suspension process and liability/responsibilities Privacy and general standard conditions (e.g. transferability) Request User Access Licence from Caron to gain system access Stage 2 – reviewing survey methodology, integrated survey programme, upgrades from feedback on this initial release Thanks to Dave Smith (Abley), Ian Coles and Nick Rabbets (TRICS) without whom this would not have been landed. 6/11/2018 Trips Database Bureau