Spending money, saving money A4 section Zgorzelec – Krzyżowa business case Monika Milwicz EU Projects Department.

Slides:



Advertisements
Similar presentations
Ragnar Grøsfjeld Senior engineer Norwegian Public Roads Administration
Advertisements

Michigan Department of Transportation Michigans Infrastructure Needs and Funding 2013.
1 Roadway User Costs Nathaniel D. Coley Jr. Prefabricated Bridge Elements and Systems Work Zone User Costs Nathaniel D. Coley Jr. Federal Highway Administration.
Heartland Coast-to-Coast Corridor Study ___________________ Presented Sept. 11, 2007 Sanibel Harbour Resort Spa Heartland Coast-to-Coast Corridor Study.
EURORAIL Project Organizational model. EURORAIL Project Initiator: Ministry of transport and communications of Ukraine Lviv Oblast State Administration.
International Organization International Organization
1. 2 PERCENTAGE FOR IACHR IN THE OAS 2009 BUDGET (US$ 3,746,100)
Tackling the Environmental Impact of Transport Presentation by David Jamieson MP to the Institute for Public Policy Research Wednesday 15th October 2003.
Metropolitan Transportation Authority July 2008 Financial Plan MTA 2009 Preliminary Budget July Financial Plan 2009 – 2012 DJC.
Information - Communication 1 European Commission December 2005 Trans-European transport network policy.
Benefit-estimation for mobility management by stat. data Walter Bien ECOMM-2008 (London, June-2008) 1 Quick & Simple – a new approach for benefit-estimation.
1 ECOMM 2010 moving people – bridging spaces How klima:aktiv mobil helps to move and bridge DI Robert Thaler Head of Division Transport,
Władza Wdrażająca Programy Europejskie ul. Wspólna 2/4, Warszawa tel faks OPERATIONAL.
Marshal Office of Silesian Voivodeship European Social Fund Department
GROWING REGIONS, GROWING EUROPE Fourth Report on Economic and Social Cohesion By Prof. Danuta Hübner Brussels, 30 May 2007.
PROJECT STUDY AREA Route Selection. Stage 1 Environmental Assessment Guidelines to underpin the effectiveness of the National Roads Project Management.
Michael Egan Head of Corporate Affairs National Roads Authority Development and Implementation of the National Roads Programme in Ireland
Development Priorities in Regional Operational Programmes prepared by the Polish Regions for the Programming Periode – 11 October 2007,
Brussels, 6th October 2010, OPEN DAYS 2010 Broadband as Enabler for Social Innovation in Malopolska Kraków, 2 kwietnia 2004 r. Brussels, 6th October 2010,
DEVELOPMENT OF VIA BALTICA IN LITHUANIA. I transporto koridorius.
Does Europe need more roads? 1 Wednesday, 7 October 2009 Steer Davies Gleave Upper Ground London, SE1 9PD +44 (0)
European Commission - DG Environment Clean Air for Europe Jacques Delsalle European Commission European Commission DG Environment, Unit C1 Update on TREMOVE.
FREILOT Energy efficient urban freight Zeljko Jeftic ERTICO – ITS Europe.
1 Cohesion Policy Evaluation Network Meeting: Brussels, October 2010 Ex post evaluation of cohesion policy interventions financed.
Dharmesh Shah 07 Oct 2008 City Planning and Road Safety Dharmesh Shah Traffic and Public Transposrt Authority.
1 Irregularities statistics from draft 280 Annual Fight Against Fraud Report for 2008 Maria NTZIOUNI-DOUMAS OLAF Train the trainers European Commission.
April 2, $1 Billion - $1.2 Billion The Pawlenty-Molnau Transportation Financing Package will improve Minnesotas transportation system by greatly.
Fiscal Condition of the States Presentation to the Rhode Island House of Representatives Economic Forum December 1, 2009 Arturo Pérez Fiscal Affairs Program.
Beltline Highway ITS – Ramp Metering Project ODOT Planners Meeting April 25, 2012.
Oregon Department of Transportation.
1 MAXIMIZING PUBLIC INVESTMENT Ohio Department of Transportation Highway Funding Overview Julie Ray, Deputy Director Division of Finance & Forecasting.
A34 Corridor Strategy Strategic Route Improvements 25 th November 2004 working together with.
Perry Points of Pride... Creating the New Perry Way Attractive 1. Become Attractive To All Community 2. Build Community Spirit Identity 3. Establish Our.
How LRT affect Kayseri Feyzullah GUNDOGDU Kayseri Light Rail System Fixed Installation Manager
CIVITAS-ELAN Objectives and main results in Zagreb
The City of Stockholm, Sweden Climate Change target: Fossil Fuel Free 2050 Charlotta Hedvik Stockholm Action Programme on Climate City of Stockholm.
Design of the EU ETS for aviation. Aviation and EU ETS legislation Directive 2008/101/EC Directive 2008/101/EC –entered into force on 2 February 2009.
Florida Education K-20 Fixed Capital Outlay Legislative Budget Request.
SCATTER workshop, Milan, 24 October 2003 Testing selected solutions to control urban sprawl The Brussels case city.
1 Overview and Outlook for PPP Projects in Vilnius Mrs. Ruta Vainiene Adviser to the Mayor of the City of Vilnius November 22 nd, 2006 Vilnius.
1 Roadway User Costs Nathaniel D. Coley Jr. Prefabricated Bridge Elements and Systems Work Zone User Costs Nathaniel D. Coley Jr. Federal Highway Administration.
City of Miami PROPOSED Fiscal Year 2009 BUDGET. 2 Budget Focus To prepare a structurally balanced general operating budget. To provide a budget, which.
Designing Bank Operations to Support Program-Based and Sectorwide Approaches.
Global impact of Biotech crops: economic & environmental effects Graham Brookes PG Economics UK ©PG Economics Ltd 2008.
Equal or Not. Equal or Not
Daily mobility trends of Finnish people since 1986 and user segmentation according to daily mobility based on NTS Tuuli Järvi.
Source : Energy Policy and Planning Office, Ministry of Energy, August Tips on OIL Saving 1. Drive at max. 90 km/hr 2. Use Mass Transit instead.
NIMT at a Glance National Institute of Metrology (Thailand)
Government of the Republic of Macedonia Secretariat for European Affairs Fifth Meeting, Subcommittee on Transport, Environment, Energy and Regional Development,
The Decision Tool for MPP-Dairy Mark Stephenson Director of Dairy Policy Analysis University of Wisconsin.
Mitja Kosec – Project Manager
The existing and the future sectors of M0 ring The construction of the eastern sector of motorway M0 is an overdue debt. M0 collects and distributes.
Bulgaria’s strategic road infrastructure challenges.
MANAGING MOTORWAYS CONSTRUCTION IN CROATIAN MOTORWAYS Goran Legac Construction Department Croatian Motorways, Ltd. Zagreb,
Where does how we travel have an impact? On your body On the planet In our community.
COUNTRY STUDY - POLAND POLISH PROGRAMME OF MOTORWAYS CONSTRUCTIONS - BARRIERS OF IMPLEMENTATION Prof. Jan Burnewicz, dr Monika Bak University Of Gdansk.
HDM-4 Applications. 2 Project Appraisal Project Formulation Maintenance Policy Optimization Road Works Programming Network Strategic Analysis Standards.
TRACECA PROJECT EVALUATION. Mark the location of the project on the map with a plain, black line or dot. Constanta – Vama Veche Motorway section.
RBGC First Transnational Roundtable Vilnius 24th November 2011 « Core Corridors and the « Rail Baltica » James Pond DG MOVE European Commission.
THE CIVITAS INITIATIVE IS CO-FINANCED BY THE EUROPEAN UNION Promoting Sustainable Urban Mobility with CIVITAS.
1 Program of construction the high speed lines in Poland Warsaw, r.
FINANCING THE EU TRANSPORT POLICY AND TRANS-EUROPEAN NETWORKS. Hugh Rees. BELGRADE APRIL 2012.
23e Congrès mondial de la Route - Paris 2007 Network Safety Management – From Case Study to Application François GANNEAU Roads and Motorways Engineering.
A European Commission funded Regional Programme since Improvement of the road section of Gerede - Gürbulak Border Gate and Impacts Evaluation.
BELMONT TRANSPORT PACKAGE A49 – B4349 (Relief Road Southern Section) Meeting 14 June 2013.
1 Cohesion Fund (including former ISPA) ex post evaluation Jurate Vaznelyte, Adam Abdulwahab Evaluation Network Meeting Brussels, April 14 th.
Road Investment Decision Framework
European Truck Platooning Challenge Conference HGV Platooning Trial in the UK Ian Thompson Senior Technology Advisor Highways England.
PLANNING OF RAILWAY INFRASTRUCTURE IN THE CZECH REPUBLIC
Introduction and Applications
Presentation transcript:

Spending money, saving money A4 section Zgorzelec – Krzyżowa business case Monika Milwicz EU Projects Department

Goals of motorway construction Goals of motorway construction: Cohesion of European TENT network (all motorways in Poland are part of TENT) Shorter travel times Improved road safty

A4 Motorway Basic information on A4 Motorway: Part of 3rd TENT corridor Part of E40; Ostenda (Brusselss_ - Aachen – Koln – Dresden – Wrocław – Kraków - Kijev

A4 Motorway; section Zgorzelec - Krzyżowa Basic information on A4 Motorway; section Zgorzelec – Krzyżowa: Length – 51,4 km Number of motorway junctions – 4 Designed speed – 120km/h Cement concrete pavement Number of carriageways – 2 Number of traffic lanes – 2x2 (target 2x3) Maximum axle load – 115kN

Short history of construction section Zgorzelec - Krzyżowa The history of A4 section Zgorzelec - Krzyżowa construction: 1930s – Preliminary design and preparation work. (earth works for German Wrocław – Dresden motorway still exist) 1997 – Preliminary design completed 1998 – Administrative decisions on the motorway route 2005 – Final administrative decision on the motorway route 2007 – Environmental impact study approval 2007 – Construction permit 2007 – 2009 Construction 14/08/2009 Grand opening

Project 2 projects implemented with EU co-financing 2002/PL/16/P/PA/007 Development of the project: Construction of A4 motorway; section Zgorzelec – Krzyżowa Project budget according to the Financing Memorandum: EURO Cohesion Fund contribution: EURO 2004/PL/16/P/PT/004 Construction of Ar motorway; section Zgorzelec – Krzyżowa Project budget according to the Financing Memorandum: Euro Cohesion Fund contribution: EURO

Costs Project costs Study and analyses EURO Land acquisition – EURO Works – EURO Management and supervision – EURO TOTAL: EURO

Costs Economical costs Traffic jam on the existing national road number 4 (DK 4) Accidents (only in 2006 – 2008 there were 100 accidents with 27 killed and 124 injured)

Benefits Project benefits according to the feasibility study: Savings in vehicle operating costs Savings of time Savings due to lower accident frequency Management and supervision

Benefits Results of economic analyse: Pessimistic scenario: NPV – ,00 EURO (8%) IRR- 22,4% Optimistic scenario: NPV – ,00 EURO (8%) IRR – 39,3%

Verified Benefits Benefits of the new motorway construction EURO per year The economic benefits include: savings on fuel and vehicle maintenance – EURO savings on time of freeway users – EURO savings on traffic accidents costs – EURO cost on emissions EURO

Spending money – Saving money Spending money: Bad menagement argument by the Cmmision: - cost over-runs on the PA/007 project preparation around EURO - cost over-runs on the PT/004 (construction of motorwa) around EURO Saving money: (and time) EURO per year – total economical savings - shorten time of journey – to 30 minute-drive

Thank you

Monika Milwicz