20th India Power Forum 2017 “Sustainability of Power Business – Paradigm Shift for 24x7 Power for All” Session I: Power Generation Scenario by 2022 :

Slides:



Advertisements
Similar presentations
Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
Advertisements

A Sustainable Environmental Programme Enel Maritza East 3 Mike Foster CEO Enel Operations Bulgaria.
Meeting with Rep. _______________ Solar Industry Representatives May 5, 2010.
Green Manufacturing: Adopting Energy Efficiency in Manufacturing Supply Chains -Dangote Cement Strategy By Pabby Paramjit Director, Dangote Academy.
11 CEMENT MAY 2014 For updated information, please visit
Doing more with Less Coal Efficiency and GHG Intensity enhancement potential for the Steel Sector in India Institutional Mentor / Partner Lead Researchers:
Community Energy Opportunities Jon Bell Business Development Manager Mosscliff Environmental Ltd.
The Role of Energy Conservation and Efficiency in Saudi Arabia in Long - Term Sustainability Dr.Abdulrahman A. Al-Tuwaijri Deputy Minister for.
Input-Output Analysis of Climate Change: Case Study of Efficiency Driven Policy Choice of Indian Response Strategy Joyashree Roy Jadavpur University, Kolkata,
1 Framework Required to Ensure Long-term Sustainability - Environmental and Socio- cultural concerns.
Cogeneration.
China’s Sustainable Energy Policy
Energy Security and Low Carbon Development in South Asia
1. Objective of Seminar Energy sector at a glanceProfiles in Energy SectorAbout SynergemSeizing the opportunities 2.
Scaling Up Energy Efficiency in India: Opportunities in the Electricity Sector Dr. Jayant Sathaye, Dr. Amol Phadke and Ranjit Bharvirkar Energy Analysis.
ENERGY IN THE MEDITERRANEAN REGION: Situation and prospects Dr Houda BEN JANNET ALLAL, OME General overview of renewable energy and energy efficiency in.
OPTIMIZATION OF CONVENTIONAL THERMAL & IGCC POWER PLANT FOR GREEN MEGA POWER Dr. V K Sethi & J K Chandrashekar Director Adviser Director Adviser University.
Consequences for Eskom of the Listed Activities under Section 21 of the National Environmental Management: Air Quality Act, 2004 Submission to the Portfolio.
1 Power – The Wind Way. 2 Windy Years India Currently holds a cumulative capacity of over 21000MW in India. Wind power growth in India has seen various.
OVERVIEW OF INDIAN POWER SECTOR AND PLAN FOR 12 th / 13 th PLAN.
Introduction of international standards in energy sector CF “Centre of sustainable production and consumption” Almaty, July 4-6 Safargaleyeva Guzaliya.
Iran steel export: perspectives and competitiveness in the MENA region 2 nd Iran Steel Export Perspectives Conference September 4, 2015, Istanbul, Turkey.
Nokia Siemens Networks Environmental Impact. Content AboutNSN? Environmental Strategy Customers Advantage Energy Efficiency Take Back Solution Working.
1 Introduction to exercise in emission scenario building Lars Strupeit Malé Declaration: Emission inventory preparation / scenarios / atmospheric transport.
World Energy Outlook 2006 Scenarios for the World and the European Union Presentation to European Wind Energy Conference Milan, Italy, 7-10 May 2007.
The Energy Sector in India. Growth of installed capacity for electricity in India.
Opportunities for Competitive Energy Services IEA DSM Task XVI Experts Meeting, Deventer, Netherland, 8-9 October, 2007 Abhishek Nath Bureau of Energy.
OVER VIEW OF INDIAN POWER SECTOR INDIAN POWER SECTOR 27 th January, 2010.
CARBON EMMISION FROM COAL BASED THERMAL POWER PLANTS
On/Off Operation of Carbon Capture Systems in the Dynamic Electric Grid On/Off Operation of Carbon Capture Systems in the Dynamic Electric Grid Rochelle.
1 VOLUNTARY MERCURY CELL PHASE OUT PROGRAMME OF INDIA Dr.Y.R.SINGH Executive Director ALKALI MANUFACTURERS’ ASSOCIATION OF INDIA MERCURY TECHNICAL BRIEFING.
Driving Forces Behind the Adoption of Pollution Control Technologies in the Electricity Sector : A U.S. Perspective Meredith Fowlie University of Michigan.
Policy questions to be addressed and structures of IMACLIM-CHINA Wang Yu Institute of Energy, Environment and Economy Tsinghua University 29 January 2015.
World Steel Market and Ukrainian metallurgy in 2010 Vlasyuk V.S. SE UPE Co. Research & Consulting, Ukraine 69 th Session of the OECD Steel Committee Meeting,
© 2016 Global Market Insights. All Rights Reserved Solar Tracker Market size Forecast Analysis ( )
Clean Power Plan EW Tim Wilson Director of Energy Supply Services.
Japanese Electricity Market M. Hossein Javidi Iran Electricity Market Regulatory Organization & Administrative Department for Electricity Market Regulatory.
THE WORLD BANK Coal and the Search for Energy Security: Challenges Facing China Junhui Wu Energy Sector Manager East Asia and Pacific Region.
Uniper Energy Services
Electricity Generation: Coal v/s N-Gas - Basic Economics
The chemical industry as a key for economic development and wealth
Electricity Generation: coal v/s n-gas - Basic Economics
Policy Initiatives – Roundtable Conference on Coal
DISTRICT COOLING A promising and sustainable option for HFC phase-down
CENERG 3rd TEMATIC WORKSHOP
Transition towards Low Carbon Energy Monday 12th June 2017
Ryan Anderson April 22, 2008 Climate Change: Science and Society
UPGRADE OF AGING ELECTRICITY INFRASTRUCTURE
Flexibility in Utilization of Domestic Coal
Financing of Solar power plants
Managing Director (Bajaj Power Ventures Ltd)
Power Plant Boiler Market Report Categorizes the Global Market by Type, by Technology, by Fuel, & Region.
Thank you for the opportunity to present our energy efficient product
Commercial Mining Prospects and Challenges
Solar Power Project –Viability
Don’t write off coal amid the renewables boom
A Study on ‘Mechanisms for Coping with Power Outages’
Air-conditioning as part of a demand response strategy: A bigger picture Ozone Secretariat workshop on energy efficiency opportunities while phasing-down.
NS4960 Spring Term, 2018 China: Expanded Renewables
NS4960 Spring Term 2018 Fundamentals Will Curb Coal
Coal – security of coal supply considerations of EURACOAL
Giorgia Pasqualetto Project Associate Department of Energy UNIDO
APEC Energy Demand and Supply Outlook 6th Edition 2-1 Introduction and Business as Usual Cecilia Tam, Special Adviser May 2016, EWG 51 Canberra.
RE Grid Integration Study with India
Dusan Zivkovic, Head of Investment EPS
Restructuring Roundtable: Merchant vs Rate-Base
Present Preparedness and Constraints for the Implementation of New MoEF&CC Emission Norms vis-à-vis Expansion of Generation Capacity Shiv Kumar Dube Senior.
Wholesale Electricity Costs
Towards more efficient energy use - IPP perspective
Flexibility in Utilization of Domestic Coal Pankaj Batra Member(Planning) CENTRAL ELECTRICITY AUTHORITY August,
Presentation transcript:

20th India Power Forum 2017 “Sustainability of Power Business – Paradigm Shift for 24x7 Power for All” Session I: Power Generation Scenario by 2022 : Business Case of Decommissioning Thermal Power Plants and their Replacement with Efficient and Cleaner Units Anup Bhargava Executive Director, Jindal Steel & Power Limited

Yearly Capacity Additions in Thermal Power in India (MW) India has witnessed an increasing trend in thermal capacity addition with a few dips, however, the future forecasts show that there will be a downward trend in yearly additions Capacity Addition Trend Yearly Capacity Additions in Thermal Power in India (MW) 71,982 75,292 79,637 91,132 103,140 120,551 138,016 154,171 175,106 194,400 Total Capacity has more than doubled from 2010 to Mar 2017 The under construction capacity is estimated at 53,000 which will come in the next 4 years – that gives us ~12,000MW/Year addition capacity on an average – much lower than previous years Source: Avalon Consulting Research and Analysis, Interactions with suppliers, TPPs, power associations

JSPL Business Overview Current Capacities – Domestic & Global Power Mines & Minerals Global Ventures Construction Material & Solution Steel Current Capacities – Domestic & Global 6.1 MTPA Steel* 3.11 MTPA* Iron ore IPP – 3400 MW** CPP – 1634 MW 2 MTPA Steel Coal Mines Cement Road solutions LGS Domestic ** 1000 MW Divestment announced 3

A dominant share of capacity (~140,000 MW ~72%) is <17 years old accounting for 350 units whereas ~38,900 MW (20%) is >25 years old and is reàdy to decommissioned Unit Age Wise Share of Existing Thermal Power Capacity Thermal Power Capacity Breakup by Unit Age (MW) Thermal Power Capacity Breakup by Unit Age (No. of units) Comments The biggest and most important age segment is > 17 year old plants that can be phased out from 2018- 2022 These account for over 54,400 MW capacity in India Around 38,900 MW is over 25 years old – these plants do not have much life left, expensive to upgrade and comply to new Emission norms. Total = 194,400 MW Total = 674 units The total Decommissioning of Thermal Plants from an age perspective (>17 years old) is estimated at ~ 54,400 MW across 323 units, can be phased out from 2018 to 2021 Note: The existing market capacity is as of 31/07/2016 and April 2017 Report Source: CEA

India’s total thermal Capacity breakup by ownership and size (in MW) Plant capacity / unit spread across Utility Companies ( Public/State and Private Sector ) :: Target Market > 25 yrs Unit ownership wise break up ( Current Figures may slightly vary as data collected from a research report published a few days back) India’s total thermal Capacity breakup by ownership and size (in MW) India’s total thermal Capacity breakup by ownership and size (in no. of units) Comments > 25yrs Plant - Central ( NTPC/DVC/NLC) = 37% - State Sector = 58% Average Net Station HR = 2,944 Kcal/kwhr, ( 8.8%, 60% PLF) New 800 MW Supercritical Net SHR = 2,100 kcal/kwh Central and State Sector is the target market for decommissioning and then replacement with new technology Total = 194,400 MW Total = 674 units 350 233 451 231 287 Average Central Sector and State Gencos ( 39,000 MW , > 25 yrs) is the Target Market for Decommissioning Source: Avalon Consulting Research and Analysis, CEA

Target Power Stations (Thermal) Advantages of replacement Business Case of Decommissioning Thermal Power Plants and their Replacement with Efficient and Cleaner Units Business Case Target Power Stations (Thermal) Advantages of replacement Other Parameters Stage I : Phasing out > 25 yrs Power plant ( Approx. 242 Units, 38,900 MW) Stage II : Phasing Out 17-25 yrs Power Plants ( Approx. 74 units, 15,500 MW) Phasing out units where FGD Cannot be installed ( Approx. 16,600 MW) Summary Total Expected Decommissioning Opportunity 71,000 MW -> Rs 2,700 Cr Expected capacity addition in Thermal to be 5% YOY (NEP) New Unit 50,000 MW ~ Rs 250,000 Cr Reduction in Tariff by replacing older units to New Supercritical units – 10% Emission Reduction, including CO2, Sox, Nox as per new norms for plant after Jan 2017 Reduction in customer (Discom Tariff), due to removal of fix costs for these decommissioned power stations – Expected Rs 1/unit Steel Scrap Availability 13 Million MT Ash Generation reduction by 25% Salvage value of a typical 4x120 MW PS ~Rs 130 Cr Coal will remain primary energy, which was 55% in 2015-16 and is expected to remain high at 48-54% by 2040 Reduction in customer (Discom Tariff), due to removal of fix costs for these decommissioned power stations – Expected Rs 1/unit Stranded Capacity ~ Approx 50,000 MW For Decommissioning 71,000 MW -> Scrap Value – Rs 19,200 Cr FSA Transfer Retrofit – Rs 1.5cr / MW Indian Power Sector revival and COP21 Compliance largely depend on Decommissioning & Replacement of Older Power Stations

Advantages of replacement Business Case of Decommissioning Thermal Power Plants and their Replacement with Efficient and Cleaner Units (Simulation) Business Case Business Case Advantages of replacement Conclusion Replacement of 4x110 MW or 2x210 MW by 1x 800 MW Distribution Tariff : Less by 13-15% Generation Tariff : FC Less by 50% : VC Less by 10% (due to 10% reduced coal + 10% increased O&M and 100% increased output) Ash Reduction : Less by 12% CO2 reduction : Less by 12% SOx reduction : Less by 80-90% (considering present level of 1200/1400 to be reduced to 100 mg/Nm3) NOx Reduction : Less by 80-90% (considering present level of 600/500 to be reduced to 100 mg/Nm3) Water Consumption : Less by 35-40% (considering present level of 4.5/4.0 to be reduced to 2.5 m3/Mwh) COP 21 Emission Compliance by 2021/22 by India by decommissioning and replacement of old units Flexible Power Generation, with newer plant for < 30% turndown Effective use of coal -> reduction of 80 T/MW We recommend decommissioning of > 17 yrs units to new 800 MW supercritical units

Thanks