MIRACOSTA COMMUNITY COLLEGE DISTRICT

Slides:



Advertisements
Similar presentations
MULTIPLE PROFESSIONAL REVIEWS DOCUMENT SOLUTIONS Architectural and engineering review identifies building code and accessibility repairs needed. ($750,000.
Advertisements

Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Draft FMP Priorities For Discussion Facilities Committee 3/5/13.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 18, 2011 EDUCATE ENGAGE EMPOWER 1.
April 14, 2009 Los Angeles Valley College Prop J Master Plan Town Hall Presentation.
Bond Program Planning Imperatives Study Session October 12, 2004.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1.
NEW PALTZ CENTRAL SCHOOL DISTRICT Comprehensive Facilities Master Plan – Progress Report Summary.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District January 31, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Campus Master Plan 2012 Update University Senate November 6,
Bond Construction Update Citizens Oversight Committee Long Beach Community College District August 8, 2011 EDUCATE  ENGAGE  EMPOWER 1.
PINOLE VALLEY HIGH SCHOOL FACILITIES SUBCOMMITTEE MEETING December 13, 2011.
Remsenburg – Speonk Union Free School District Elementary School Bond Planning Presentation October 12, 2010 BBS Architects and Engineers and Triton Construction.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District January 25, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Additions and Renovations to: Horace Mann School Additions and Renovations to: Horace Mann School Additions and Renovations to: Horace Mann School.
Glenvar High School Renovations School Board Presentation
Accredited with “Distinction in Performance” St. Clair R-XIII School District.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 14, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Citizens’ Oversight Committee Long Beach Community College District January 28, 2008 BUILDING  TOMORROW  TODAY Cordoba Corporation.
HIGHLAND PARK BOND WORK The final results will be AMAZING!
Facilities Improvements and Bond Construction Update Facilities Advisory Committee Long Beach Community College District Septmeber 24, 2009 EDUCATE  ENGAGE.
Board of Trustees September 1, 2010.
MiraCosta College 2011 Proposition EE Plan Summary October, 2012.
1 Educational and Facilities Master Plan Update Dr. Richard McCullough President Saddleback College Dr. Glenn Roquemore President Irvine Valley College.
Torrance Unified School District Bond Measure Y Bond Measure Z Quarterly Construction Update September 30, 2009.
Facilities Maintenance Status Report John Ozurovich, Director Facilities – Saddleback College John Edwards, Director Facilities – Irvine Valley College.
Architectural, Engineering, and Professional Construction Services Consultants Request for Qualifications February 11, 2005.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 1,
Bond Construction Update Facilities Advisory Committee Long Beach Community College District November 17, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District October 24, 2011 EDUCATE  ENGAGE  EMPOWER 1.
St. Cloud High School Phased Comprehensive Construction Project April 28,
Agriculture and Industrial Technology Complex Capital Planning and Development Project Highlight.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District January 23, 2012 EDUCATE  ENGAGE  EMPOWER 1.
10 December 2015 Campus Master Plan. 10 December 2015 Draft Master Plan Concept Site Development Plan New Facilities Maintenance Building New College.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 26, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 6, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Board of Trustees Meeting February 25, Strategic Plan Alignment Strategic Priorities from the Strategic Plan 
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 14, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Merritt College Proposed New Science Complex PCCD Board of Trustee Meeting May 20, 2008 Presented By Dr. Sadiq B. Ikharo, Vice Chancellor Department of.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District March 3, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Measure G Bond Projects. Message from the President ….. Monument Refurbishment Project.
LOCAL OPTION SALES TAX FOR EDUCATION APPROVED BY THE BOARD OF TRUSTEES SEPTEMBER 29, 2015.
LOCAL OPTION SALES TAX FOR EDUCATION APPROVED BY THE BOARD OF TRUSTEES SEPTEMBER 29, 2015.
Development of a Comprehensive Modernization Project at Burroughs Middle School Community Meeting January 20, 2016.
Mt. San Jacinto Community College District Five Year Construction Plan
White Pigeon Community Schools
April 2016 Bond / Facilities Update Presentation
Building for the Future of Education: Propositions S and N
Community Forum 2017 Project Overview UNIVERSITY OF UTAH.
Southwestern Community College District Facilities Master Plan and
Bond Implementation Committee
2006 Facilities Master Plan Update Cañada College
Bond 2017 Capital Projects Linda Degman | January 19, 2017.
UPDATE: 8/8/2011 Batavia City School District
Forsyth County 2016 Bond Referendum
Facilities Update November 17, 2017
BURROUGHS HIGH SCHOOL PROJECT STATUS REPORT February 2017 Fast Facts
BURROUGHS HIGH SCHOOL PROJECT STATUS REPORT March 2017 Fast Facts
UNION GROVE ELEMENTARY REFERENDUM
HARWICH FIRE STATION 2 Board of Selectman Presentation 11/06/2017.
Facilities Modernization Program
Takoma Park/Silver Spring Campus
College Council Meeting September 7, 2018
Ten year Capital Improvement Program and Preliminary Bond Information
Update to Board of Trustees: November 9 FAC Meeting
Project S.O.A.R December 10, 2018 Meeting
Recent Bond Accomplishments
Citizens’ Oversight Committee Meeting February 22, 2018
Dixon Middle School Project Update
Presentation transcript:

MIRACOSTA COMMUNITY COLLEGE DISTRICT FACILITIES MASTER PLAN UPDATE | MAY 18, 2016 PHASE TWO: Board of Trustees Presentation

Facilities Master Plan Review & Questions Community Learning Center San Elijo Campus Oceanside Campus 1 Sustainability Goals & Guidelines 2 Security Master Plan 3 Schedule & Cost 4

Community Learning Center Existing Building Area 43,360 GSF Demolition -4,500 GSF SBDC (old fast food restaurant) Building C (Temporary Building) Arby’s New Construction 9,300 GSF Student Resource Building Final Building Area 48,160 GSF Bldg. B Delta +4,800 GSF (11% increase) Resources Student Quad Bldg. A Renovation 7,000 GSF Student/Faculty Spaces & Tutoring Space Modernization 19,000 GSF Classrooms

Community Learning Center Town Square Entry A Arby’s New entry / gateway F Parking F 117,300 GSF Reconfigure Parking & Pave Dirt Lot Add 120 parking spaces B Bldg. B E Site Improvements 0.8 Acres (10% of Site) Campus Quad Outdoor Space Refresh w/ Drop-Off Bioswale / Native Plantings Resources Student Infrastructure & Systems: Natural gas line improvements New hot water boiler and pump @ building A New heat pumps @ buildings A&B HVAC Controls Replace rooftop package units @ building B Overall Acreage: 7.7 acres Bldg. A D Infrastructure & Building System Natural Gas Utility Pipe Repairs Mechanical Systems Upgrades

San Elijo Campus Demolition New Construction Renovation Modernization Existing Building Area 72,134 GSF Demolition -4,000 GSF Building 800 (non-functional space) New Construction 11,300 GSF Student Services / Administration Building Student Center 79,434 GSF Final Building Area Services Delta +7,300 GSF (10% increase) Quad Renovation Library 35,800 GSF Building 400 (Science Labs) Building 500 (Computer Labs) Library (Includes Tutoring) Student Center Modernization 23,900 GSF Classrooms & Labs

San Elijo Campus Entry Parking Site Improvements Infrastructure D New monument sign Parking 0 SF No changes to parking E Student Center Site Improvements 4.6 Acres (7% of site) New Entry Plaza Create Campus Quad Outdoor Learning Spaces Improved Landscape & Paving Bioswale / Native Plantings Services C B Library According to industry standards, campus has extra parking capacity. According to student and faculty/staff, parking is good and not an issue. Design Goals: Reduce Turf Spaces Enhance Native Habitat Address Stormwater Run-off and Erosion Create Useable Outdoor Spaces Enhance Campus Identity Total Acreage: 64 acres Infrastructure Underground Storm Water & Sewer Pipe Repairs Natural Gas Utility Pipe Repairs & Earthquake Valves Replace Outdated Heat Pumps (building mechanical system) A F

Oceanside Campus Academic Hubs STEM (Science, Technology, Engineering & Math) Allied Health / Health & Wellness Arts Communications Letters & Humanities LETTERS STEM HEALTH Library Services COMM. Admin Each Academic Hub has: Classrooms/Labs Student Study & Collaboration Space Offices & Meeting Space Useable Outdoor Space ARTS

Oceanside Campus New Construction NEW EXISTING NET / DELTA Student Services Building (includes Veterans Center) All Existing Functions & Personnel Growth for Additional Staff / Programs New Food / Coffee Cart Gym Complex Gym Replacement New Multipurpose & Kinesiology Studios Offices & Locker Rooms Wellness Center Allied Health Building Classrooms, Labs & Offices New Study Space for Students Science Building Biotechnology Labs & Offices (replaces existing & adds lab) Chemistry Labs (replaces existing & adds labs) New Classrooms 39,040 GSF 29,900 GSF* 9,140 GSF 35,340 GSF 26,700 GSF 8,600 GSF 20,450 GSF 7,900 GSF* 12,550 GSF 20,600 GSF 9,400 GSF* 11,200 GSF *GSF for individual program elements estimated based on efficiency ASF to GSF calculations estimated

Oceanside Campus New Construction TOTAL: 149,340 GSF 91,490 GSF* EXISTING NET / DELTA Arts / Media Building Relocated Media Arts Labs & Offices, & Art Gallery New Classroom New Study Space for Students New Food / Coffee Cart Campus Police Building Offices & Police Operations Meeting / Classroom Resource Center Building Large, Flexible Event Space ELI Program Misc. Buildings Purchasing Building (temporary building replacement) Greenhouse (replacement) Athletic Field Restrooms/Support 10,470 GSF 6,100 GSF* 4,370 GSF 6,925 GSF 1,440 GSF 5,485 GSF 6,860 GSF 1,000 GSF* 5860 GSF 9,650 GSF 9,050 GSF* 600 GSF TOTAL: 149,340 GSF 91,490 GSF* 57,850 GSF *GSF for individual program elements estimated based on efficiency ASF to GSF calculations estimated

Oceanside Campus Renovation Modernization Demolition Vacated Student Services Space Classrooms & Labs Student Study / Collaboration Space Office / Work Environments Professional Development Center (Building 4400) Student Center, Theater & Library (partial) Library Facilities & Maintenance, 4200 & 4300 Classrooms & Labs at 4000 Offices at Building 4700 Total Modernization: 68,370 GSF Demolition Buildings Past Useful Life Temporary Buildings Gym Complex, Bldgs. 5000, 5100, 5200 Safety & Security / Functionality issues Police Station Buildings: 1000, 1200, 2000, 2100, 3000, 3100, 3200, 3300, 3400, 3500, 3601, 3700, 4000, 4100, 4400, 4500, 4600, 4800 Total Renovation: 157,995 GSF Total Demolition: 54,950 GSF

Oceanside Campus STEM Letters Health Comm. Arts RC Science Gym Allied Improved Fields STEM Letters New Baseball Field Health RC Science Gym Allied Note buildings getting renovated & modernized New Student Parking Comm. Library Services Admin Arts

Oceanside Campus: Comm. Arts Services Arts Police Library Admin New Student Parking Arts Theater Arts Police

Oceanside Campus Parking Site Improvements 356,000 GSF new Adding 545 parking spaces (2) New Student Lots New Visitor Parking lot Expanded & Reconfigured lots Site Improvements Library 18.5 Acres (15% of campus area) Services Admin Create Outdoor Instructional Space Reduce turf areas (water usage) Enhance identity of academic hubs Quad Improvement Project Pathway Improvements Athletic Fields

Oceanside San Elijo Community Learning Center 4% 14% 14% 25% 27% 38% Final Building Area by Type Final Building Area by Type Final Building Area by Type 30% 31% 25% 14% 4% 14% 27% 38% 40% 45% 19% 15% Summary slide for all three sites: Demo, renovate, modernize, new and net new Site improvements New Construction Renovation Remaining Modernization

Facilities Master Plan Review & Questions Community Learning Center San Elijo Campus Oceanside Campus 1 Sustainability Goals & Guidelines 2 Security Master Plan 3 Schedule & Cost 4

Phasing CLC: 2 phases SEC: 2 phases OCN: 3 phases

Cost Estimate Information Based on either design-bid-build or construction-manager-at-risk procurement method. Building Costs Sitework Costs New Construction: $460 to $520 per square foot Renovation: $200 to $300 per square foot Modernization: $100 to $150 per square foot Parking: $15 to $20 per square foot Athletic Fields: $15 to $18 per square foot Site Improvements: $20 to $35 per square foot Construction Costs (75%) Soft Costs (25%) Building Cost Sitework Cost Furniture, Fixture & Equipment Swing Space Construction Contingency Professional Services & Other Fees Architectural/Engineering Project Management Permitting, Inspection & Testing Geotechnical & Survey Contingency Project Costs (100%)

Community Learning Center: Project Cost Summary Building Projects $17,254,000 Site Projects $5,426,000 Subtotal: $22,680,000 Escalation (over 4 years) $4,248,000 Total: $26,928,000

San Elijo Campus: Project Cost Summary Building Projects $30,062,000 Site Projects $6,461,000 Subtotal: $36,523,000 Escalation (over 4 years) $6,678,000 Total: $43,201,000

Oceanside Campus: Project Cost Summary Building Projects $235,076,000 Site Projects $63,226,000 Subtotal: $298,302,000 Library Services Escalation (over 7 years) $86,843,000 Admin Total: $385,145,000

District-Wide Project Cost Summary Community Learning Center $26,928,000 San Elijo Campus $43,201,000 Oceanside Campus $385,145,000 * Total: $455,274,000 *Indicated cost: Is for the build out the Facilities Master Plan Only Does not include district-wide planning contingency.