Photon beamline crates

Slides:



Advertisements
Similar presentations
ESODAC Study for a new ESO Detector Array Controller.
Advertisements

2D Detectors DAQ Overview 2D detectors are organized as tiles providing 10G Ethernet serialized portions of the full.
Computer Architecture Ports.  There are lots of external devices that you can connect to your computer. All external devices connect to the computer’s.
Chapter 8 Input/Output. Busses l Group of electrical conductors suitable for carrying computer signals from one location to another l Each conductor in.
Introduction to Computers Personal Computing 10. What is a computer? Electronic device Performs instructions in a program Performs four functions –Accepts.
September 22, 2005 ESF Workshop-Perugia 1 Virgo Control Electronic upgrade Annecy/Pisa/EGO B.Mours.
Peter Göttlicher, DESY-FEB, XFEL-DAQ-2007/03/05 1 XFEL-PIXEL Readout and control Detector requirements/proposal Basic concepts for experiments Control.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
TRIGGER-LESS AND RECONFIGURABLE DATA ACQUISITION SYSTEM FOR POSITRON EMISSION TOMOGRAPHY Grzegorz Korcyl 2013.
GBT Interface Card for a Linux Computer Carson Teale 1.
Dec 8-10, 2004EPICS Collaboration Meeting – Tokai, Japan MicroIOC: A Simple Robust Platform for Integrating Devices Mark Pleško
Understanding Data Acquisition System for N- XYTER.
Detectors and read-out DetectorNo. of ch.Read-out method Device candidates CsI(Tl)768Flash ADCCOPPER + 65 MHz FADC FINESSE Active Polarimeter600 x 12 x.
DAQ Issues for the 12 GeV Upgrade CODA 3. A Modest Proposal…  Replace aging technologies  Run Control  Tcl-Based DAQ components  mSQL  Hall D Requirements.
Data Acquisition for the 12 GeV Upgrade CODA 3. The good news…  There is a group dedicated to development and support of data acquisition at Jefferson.
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
The Main Injector Beam Position Monitor Front-End Software Luciano Piccoli, Stephen Foulkes, Margaret Votava and Charles Briegel Fermi National Accelerator.
Serial Data Link on Advanced TCA Back Plane M. Nomachi and S. Ajimura Osaka University, Japan CAMAC – FASTBUS – VME / Compact PCI What ’ s next?
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
FLASH Free Electron Laser in Hamburg Status of the FLASH Free Electron Laser Control System Kay Rehlich DESY Content: Introduction Architecture Future.
News on GEM Readout with the SRS, DATE & AMORE
Guido Haefeli CHIPP Workshop on Detector R&D Geneva, June 2008 R&D at LPHE/EPFL: SiPM and DAQ electronics.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London CALICE a calorimeter.
XLV INTERNATIONAL WINTER MEETING ON NUCLEAR PHYSICS Tiago Pérez II Physikalisches Institut For the PANDA collaboration FPGA Compute node for the PANDA.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser DESY Status and Possible Controls Contributions to the ILC Kay Rehlich.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
XFEL In-kind Review Committee Meeting, 11 May 2009 Parliament British Museum XFEL clock and control system In kind contribution proposal Development and.
S.Anvar, V.Gautard, H.Le Provost, F.Louis, K.Menager, Y.Moudden, B.Vallage, E.Zonca, on behalf of the KM3NeT consortium 1 IRFU/SEDI-CEA Saclay F
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Update on works with SiPMs at Pisa Matteo Morrocchi.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
FLASH Free Electron Laser in Hamburg Status of the FLASH Free Electron Laser Control System Kay Rehlich DESY Outline: Introduction Architecture Future.
Tango Meeting ONERA, PiLC Logic Controller ADQ412 Digitizer Diffractometer in Sardana GPFS storage system Experiment Control Upgrades at DESY.
V Review SPARC Diagnostic & Control Status G. Di Pirro On behalf control and diagnostic group.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
Digital Acquisition: State of the Art and future prospects
MicroTCA Development and Status
Chapter 1: Introduction to the Personal Computer
Basic Computer Hardware and Software.
BaBar Transition: Computing/Monitoring
RF acceleration and transverse damper systems
Diagnostic & Control Status
BI-day 2014, The SEM-grid renovation project Michel Duraffourg
Basic Computer Hardware and Software.
Enrico Gamberini, Giovanna Lehmann Miotto, Roland Sipos
Basic Computer Hardware & Software
Ewald Effinger, Bernd Dehning
The Train Builder Data Acquisition System for the European-XFEL
Status of the Beam Phase and Intensity Monitor for LHCb
Silicon Lab Bonn Physikalisches Institut Universität Bonn
Hall A Compton Electron detector overview
Read-out of High Speed S-LINK Data Via a Buffered PCI Card
Electronics requirements for special diagnostics for the XFEL
Instructor Materials Chapter 1: Introduction to the Personal Computer
Basic Computer Hardware and Software.
Upgrading the Digital Component of the Bunch Current Monitors
The IFR Online Detector Control at the BaBar experiment at SLAC
Example of DAQ Trigger issues for the SoLID experiment
Commodity Flash ADC-FPGA Based Electronics for an
Pi Logic Controller Teresa Núñez DESY Photon Science
M. Krivda for the ALICE trigger project, University of Birmingham, UK
Status of muon monitor R&D and construction
Five Key Computer Components
The IFR Online Detector Control at the BaBar experiment at SLAC
The Online Detector Control at the BaBar experiment at SLAC
Status of TTF HOM Project Aug 9, 2005
KAGRA PLC System Overview
LIU BWS Firmware status
Presentation transcript:

Photon beamline crates Contents introduction Attempt to list where crates are used at FLASH and where they might be used at XFEL, whether modifications are required etc. instruments and their crates Gas Monitor Detector - GMD Beam Position Measurement - BPM Photo-electron spectrometer Motor controllers Pump laser Experiment End Stations Small user end station Large 2D pixel detector end station 04.Dec.2007 Crate standard workshop - C.Youngman

Crate standard workshop - C.Youngman Remember … Most of this information is new to me, so I have probably … misinterpreted information … missed out crate users at FLASH … missed proposed crate systems for XFEL 04.Dec.2007 Crate standard workshop - C.Youngman

Gas Monitor Detector - GMD At FLASH Measures photon beam intensity and x-y position Ionization electrons => position Integrated current measurement of ionization ions => beam intensity 2 GMDs per beamline and per experiment => 20 total 1 VME crate per GMD Single board SPARC cpu, runs DOOCS server, software Rehlich and GMD group Readout boards: timing control, digital intputs/outputs, ADCs, integrator, etc. Slow control: HV controller For use at FLASH Photoionization cross-section lower Detector eXtended GMD (XGMD) => increases meas. length, amplifies signal, … increase ADC and integrator resolution and speed Improve resolution of timer system Conclusion Single crate solution preferred, upgrades are required for XFEL usage which could allow a change of crate, most boards provided by MCS group 04.Dec.2007 Crate standard workshop - C.Youngman

Gas Monitor Detector - GMD At FLASH 04.Dec.2007 Crate standard workshop - C.Youngman

Beam Position Measurement - BPM At FLASH Beam position monitoring from electron ionization signal of GMD – will not work at XFEL, due to lower rate At XFEL Use instead a Flourescent screen plus Micro Channel Plate detector to visualize the position. Basler Camera readout via PC using firewire. This is no longer a crate system, and the firewire/PC might be replaced by a ethernet connection. 04.Dec.2007 Crate standard workshop - C.Youngman

Photo-electron spectrometer Prototype being built at FLASH Measures spectral distribution of each photon bunch 8 GHz sampling mean photon energy, bandwidth, higher harmonic content, spectral distribution Readout via Acquiris system (scope without the display) Compact PCI bus system Alternative to VME crate, it‘s newer so ADCs are faster Could be a candidate crate for the upgraded GMD system Single crate solution so could be a portable GMD for use elsewhere Access to timing and event ID information via compactPCI timing board – works(?) DOOCS server is available Data stored on internal disk Looks like another standard 04.Dec.2007 Crate standard workshop - C.Youngman

Crate standard workshop - C.Youngman Motor control At FLASH Drives appertures, mirror movements, invasive beam monitpring equipment Currently VME based Controller/steping boards sit in crate PC sitting outside crate drives boards 8 crates with ~100 drive channels At XFEL 100 channels per beamline, 5 beamlines Current solution is limited usually not possible to drive channels in parallel(?). Cantidate for a new implementation? 04.Dec.2007 Crate standard workshop - C.Youngman

Crate standard workshop - C.Youngman Pump laser Optical laser used to pump the sample Two VME crates used to control/monitor the system Was not able to get additional information on time PG2 BL1 BL3 BL2 Optischer LASER 04.Dec.2007 Crate standard workshop - C.Youngman

Crate standard workshop - C.Youngman Small user end station At FLASH 1 VME crate user end station per beamline Timing information Trigger signals Event ID Controls via DOOCS Experimenters store data on scope or laptop, analyse at home At XFEL Does this exist at XFEL – yes Must work at other non XFEL loactions ? Could be upgraded to a new standard is all required functionality provided. 04.Dec.2007 Crate standard workshop - C.Youngman

Large 2D pixel detector end station 3 detectors have submitted proposals/LoI: HPAD – Hybrid Array Pixel Detector LPD – Large Pixel Detector LSDD – Linear Silicon Drift detector Detectors: ~2MB, ~400 frames/bunchtrain digitized, all data archived. A common frontend/backend/archive solution is being looked at by HPAD and LSDD, possibly by LPD Frontend readout modules sends data to a PC farm PC farm builds complete frames and then bunchtrains Data archived to tape silos in DESY computer center Designs still being worked on. 04.Dec.2007 Crate standard workshop - C.Youngman

Large 2D pixel detector end station LPD Originally ATCA crate proposed for data processing card MicroTCA now favoured LPD request TCA based solutions should not be excluded from standard LSDD Idea: readout ASIC and transfer data via custom protocol to crates (candidates ATCA, CompactPCI,…), where data is reorganized and sent via network IP protocol to backend 04.Dec.2007 Crate standard workshop - C.Youngman

HPAD frontend overview 04.Dec.2007 Crate standard workshop - C.Youngman

Large 2D pixel detector end station Preliminery ideas w.r.t. crates to be used, for HPAD Timing signals Fast bunch veto signal Start bunchtrain + bunch clock CompactPCI/PXI, possibly ATCA crate Vbias PS SC propriety crates DESY timing standard crate. Not required if board goes into main crate. … .. C P U Field bus … … Front end modules Set configuration Read status Set Bunchtrain gap vetos Euro standard crate – for modules not requiring bus Not a crate, but modules in some mechanical framework on the detector head Frontend modules 04.Dec.2007 Crate standard workshop - C.Youngman

Crate standard workshop - C.Youngman HPAD crates CompactPCI/PXI rather than ATCA Availability of commercial boards for: Slow ADCs Digital I/O Fieldbus interface … Also important More than one user group with different slow control requirements. External data Timing system input required Access to slow (bunchtrain) data from network 04.Dec.2007 Crate standard workshop - C.Youngman

Crate standard workshop - C.Youngman Conclusions There are many crate based systems in the photon beamline, both experiments and beam monitoring systems. A standard crate could be introduced most easily where: An upgrade is required, e.g. GMD A new installation is planed, e.g. 2D pixel detectors. 04.Dec.2007 Crate standard workshop - C.Youngman