AP 231: Process Design and Process Specifications of Major Equipment

Slides:



Advertisements
Similar presentations
PROJECT MANAGEMENT PROJECT MANAGER ENGINEERING MANAGER PROCUREMENT MANAGER CONSTRUCTION MANAGER.
Advertisements

ISO Implementation and Processor Validation Keith Hunten, P.E. Lockheed Martin Aeronautics April, 2002 ESA-NASA Workshop
Seneca Valley School District. Context of the ECP The ECP will be comprised of a multi- faceted approach in helping students gain a comprehensive knowledge.
Models. The Future of Building Services Model Content.
MEP/CIC Jan. 12, 2001 NASA’s STEP for Aerospace Workshop Using STEP for Engineering, Fabrication and Construction of Industrial Facilities Mark Palmer.
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session # 9.
Racco industrial consulting working according to investment law to prepare Engineering, Economic, Technology, Environmental Studies for industrial projects.
The Piping and Instrumentation Diagram Schematic of a control system –more detailed than process flow diagram –does not include values of parameters Used.
Typical phases of a project: 1.Schematic Design 2.Design Development 3.Construction Documents 4.Construction Administration.
The Quiet Revolution in Building Design and Construction: BIM.
1 Simulation Modeling and Analysis Verification and Validation.
TECH 101 Product Design and Manufacturing. TECH 1012 System Life-Cycle Engineering 2 Major phases in almost all products and in many cases services –Acquisition.
Given a P&ID, the learner will be able to identify the purpose of that P&ID according to their student guide. – Given a P&ID, locate the title block and.
IT in the AEC Industry Fall, 2002 The Need for Data Exchange As computer applications became more numerous in every domain, the need and value for exchange.
An Approach to Unit Delivery and Assessment
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
Knowledge Creation and Virtual Enterprises in Power Plant Construction Pekka Välikangas & Jari Puttonen Fortum Engineering Ltd.
Howard Mason, BAE Systems Chair, ISO TC184/SC4: Industrial data
R NASA STEP for Aerospace Workshop at Jet Propulsion Laboratory January 27, 2000 Thomas Thurman Rockwell Collins Inc. AP 210 Foundations for Electrical-Mechanical.
UKCIC Masters. Scope of Product Data Exchange Manufacturers Sub Contractors Concept Design Fabricate Assemble Test/ Deliver Support Enables consistent.
STEP Tutorial: “STEP Capability Today and Tomorrow” Keith Hunten, Lockheed Martin January 16, 2001 ® PDES, Inc.
Mechanical Measurement and Instrumentation MECN 4600
E.Matias Canadian Light Source. Where is Saskatoon?
CAM-I Scalable Flexible Manufacturing Initiative NGMS Task 6.1.
PIPETECH CONSULTANCY WELCOME TO PIPE TECH CONSULTANCY
1 Click to edit Master title style ROCKWELL COLLINS STEP VISION Jack R. Harris Director, Advanced Manufacturing Technology Rockwell Collins
AP210: Electrical/Electronics PCA Design Information Physical Component Placement Bare Board Geometry Layout items Layers non-planar, conductive & non-conductive.
1 ILE Project Integrated Logistics Environment Kickoff Meeting Task 2 Completion of the Ship Common Information Model Presented by: Dr. Burton Gischner.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
Interim SCIM and STEP Implementation 2008 System Technology Panel Project Ted Briggs, Intergraph Mike Olson, Northrop Grumman Ron Wood, Northrop Grumman.
STEP Tools, Inc. 216 River Street / Troy, New York Voice: (518) / Fax: (518) The STEP.
Ken Youssefi Mechanical Engineering department 1 Introduction to Concurrent Engineering Computer Aided Design (CAD) Computer Aided Manufacturing (CAM)
Ship Computer Aided Design
Copyright Theorem Solutions Ltd 2001 Tony Ranger Technical Director Theorem Solutions Ltd. The PDM
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
STEP for Multi-Disciplinary Model Management: “Intelligent PDM”
AP 220: PCA Process Planning MANUFACTURING SPECIFIC PRODUCT INFORMATION PROCESS/FACTORY CHARACTERIZATION PCB Fabrication PCA Assembly Variability Characteristics.
Drawing Structure Drawing Revision Sheet Revisions Views Drafting Specifications Contract Security Classification Approvals Responsible Organisations Product.
Geometrically Bounded Wireframe AIC (Part 510) Grouping of curves relevant for 3-dimensional wireframe modeling without topological constructs Elementary.
NCSX Data Management Plan Peer Review Bob Simmons March 31, 2003.
The Office location (Where). The Detail Map The demographic models used in strategic planning is extended of the enterprise architecture as the requirements.
1 ILE Project Integrated Logistics Environment Kickoff Meeting NPDI Project & SCIM Summary & Status Presented by: Rick Lobsitz (NGTS)
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
0 Design Change Construction & Completion Management (Outline and related procedures) Hanul NPP Engineering Center.
5.1 5 Geometry for Drafting Chapter Objectives Identify geometric shapes and constructions used by drafters. Construct various geometric shapes. Solve.
Arkom Engineering Consultants
Turnkey Capabilities.
BSB Biomanufacturing CHAPTER 2 Process Plant Design – Part III
Autodesk Inventor and STEP Solutions
Systema V4 Patrick PLECZON
Theorem CADverter for STEP AP242
Change Management V.N.Bhaskar Rao Engineering & Construction Director Amec Foster Wheeler India Operations.
P&ID SYMBOLS.
Heat Transfer Lab Equipment
Dr. Avin Mathew CTO MIMOSA
MBD European Technical Committee
Materials and systems Pathway Subject(s): VCE Systems Engineering
The Life Cycle of a Project – START to FINISH
Fundamentals of PROCESS PLANT PIPING DESIGN
ChE 473K Plant Design R. Bruce Eldridge.
Pre-contract Planning and Practice
Estimating Capital Costs
Virtual engineering An outline of basic methods in virtual space
Electrical wiring harness interoperability: functionalities of AP242 ed2; preparation of the STEP 'electrical' Implementer Forum By Sophie Hérail (CIMPA.
الاحتراق.
ISO Brief Overview 17 September 2008 Magne Valen-Sendstad.
Charles V. Trappey, National Chiao Tung University
Running Large distributed projects
MASS RELATIONSHIPS IN CHEMICAL REACTIONS.
Piping and Instrumentation for Process Industries
Presentation transcript:

AP 231: Process Design and Process Specifications of Major Equipment Process Engineering Process Simulation Unit Operations Conceptual equipment design Chemical Industry Gas Processing Petrolium Engineering & Construction AP 231 - Process Design AP 231 Produce Conceptual Process Design Demolish Plant and Restore Site Produce Detailed Commission Plant Operate Engineering Design (Front End) Suppliers and Fabricators Maintain Plant and Equipment Construct Plant Pre-commission Decommission Procure and Control Equipment, Material and Services Control Scheme Process Material Chemical Reaction Process Flow Diagrams (PFDs) Equipment and Instrument Lists Process Specifications Process Simulations

AP 232: Technical Data Packaging Core Information and Exchange Product Data Group Packaging Product Structure Based Product/Document Relationships Exchange Configuration Parameters Ties all Forms of Product Data together (Both STEP and Non-STEP data) Document Configuration Versioning Representation Forms Identification of Content File(s) Configuration Parameters Associated Lists Parts List Data List Index List Indentured Data List Other Lists Presentation PDM System A Product Data Groups (Non-STEP) Drawings CAD Models Associated Lists Reference Documents Analysis Files NC Program etc. Product Data Sets (Shape) Advanced B-Representation Facetted B-Representation Manifold Surfaces with Topology Wireframe and Surface without Topology Wireframe Geometry with Topology PDM System B Product Data Groups (STEP) AP 232 AP 209 AP 203 AP XXX Exchange Parameters Reason Destination Identification of Associated Business Documents 1