Presentation is loading. Please wait.

Presentation is loading. Please wait.

CAM-I Scalable Flexible Manufacturing Initiative NGMS Task 6.1.

Similar presentations


Presentation on theme: "CAM-I Scalable Flexible Manufacturing Initiative NGMS Task 6.1."— Presentation transcript:

1 CAM-I Scalable Flexible Manufacturing Initiative NGMS Task 6.1

2 2 Vision \ Our vision is E-manufacturing where we have  Seamless, scalable and robust evolution of products from design to manufacturing (and possibly to delivery and service)  Computer tools (such as simulators, rule-bases, visualizing environments) to rapidly plan, validate and deploy manufacturing instructions  Flexible manufacturing systems for simultaneous production of multiple products and minimum system change over

3 3 Broad Goals \ Manufacturing evaluation and deployment of emerging standards (STEP 203 and 210, possibly 220) \ Development of environments for manufacturability analysis of designs \ Manufacturing process planning and simulation environments \ Simulation and control for flexible manufacturing of board assemblies

4 4 Immediate Goals \ Implementation of visualization and translation tools for STEP AP210 (Generate 3-D models of assembly from AP210 descriptions) \ Computer implementation of Rockwell’s DFM rule base to function with AP210 description of boards \ Simulators for placement processes and machines (HSP and GSM simulators) \ Development of capabilities to ‘virtually’ produce a board (AP210 ‘as produced’ view of board assembly) \ Generation of (HSP) machine input files from AP210 model

5 Present flow Physical Constraints and Functions Design and Drafting MFG. Review (DFM Checks) Design Release Trial&Error Production

6 Proposed Flow Production Design Release Virtual Environment Physical Constraints and Functions Engineering Design Design For Manufacturing Computer Integrated Manufacturing Optel - Manufacturing Execution System Enterprise Resource Planning

7 Virtual Environment Process Planners Simulator Manufacturing Execution Systems DesignsRules Resources Process Plans Virtual Products Machine Programs Manufacturing Analysis Visualizers Rule Inference Engines

8 8 Product Enclosure Externally Visible Connectors Printed Circuit Assemblies Die Package Packaged Part Interconnect Assembly Printed Circuit Substrate Die

9 9 Typical 2-D design of a PCB

10 10 PCB Manufacturing Process

11 11 Why STEP? \ Emerging standard  Million seats of AP-203 presently deployed \ Simulation tool to be used across manufacturing facilities and vendors \ e-manufacturing  E-Business applications of STEP are being enabled by the STEP and W3C committees working together.

12 12 What is STEP? \ ISO standard (ISO 10303):  to share and exchange digital technical information \ Set of common data structures \ Application Protocols - Domain specific usage of data structures  AP 203 (3D solid Models)

13 AP210: Electronic Assembly, Interconnect and Packaging Design Technology Physical Component Placement Bare Board Design Layout templates Layers non-planar, conductive & non-conductive Material product Geometrically Bounded 2-D Wireframe with Topology Surfaces Advanced BREP Solids Constructive Solid Geometry Part Functionality Analysis Support Shape 2D, 3D Package Material Product Properties Configuration Mgmt Identification Authority Effectivity Control Requirement Traceability Analytical Model Document References Product Structure/ Connectivity Functional Packaged Fabrication Design Rules Product Design Rules Requirements Design Allocation Constraints Interface Rules Geometric Dimensioning and Tolerancing Geometry Design Control

14 14 AP 210 \ Several product models in electromechanical domain. \ Supports Multidisciplinary library data. \ Scope is “as required” & “as designed” product information. \ Sharing across several levels of supply base. \ Ability to Integrate with other engineering domains. \ Ability to integrate external services coherently.

15 Flow Diagram DFM Rule Checker DFM Rule files AP 210 file (3D) AP 210 file (2D) Assembly configuration file Placement Sequence (OPTEL) Visualizer (STEP OIV) Machine library Simulator Design Facts

16 16 2D to 3D converter \ ECAD translators generate AP 210 files containing 2D Geometry \ Simulate 3D view of the assembly board \ Converter  Input : AP 210 file (2D geometry)  Extrudes them into solids (Advanced BREP)  Output: AP 210 file (2D + 3D geometry) AP 203 files

17 17 2D to 3D converter \ Ap203 files  Individual packages  Board \ These files then converted into Open Inventor format  Inventor: Graphics package used for rendering

18 18 Typical 2-D design of a PCB

19 19 AP-210 Viewer

20 20 DFM \ We are adapting a system originally developed by Boeing for use at Rockwell  Developed on PreAMP and TIGER project. \ RDF syntax \ Inputs  AP-210 Design File  Rule Files \ Configuration Management Schema User Interface Rule Definition Software Rule Execution Software

21 21 DFM Rule Facility \ Subset of Rockwell Collins DFM rules were chosen for implementation. \ Relevant facts extracted from the AP-210 file during preprocessing.  Rule Inference engine insulated from intricacies of STEP  Different facilities can easily plug in their DFM modules. \ Interface to the simulator  DFM rules which were violated  Components which violated these rules.

22 22 Assembly Data \ Establish an assembly usage view  Components Organization by package / part family Part numbers, version Configuration management data Location, orientation Reference Designators \ Integrated with OPTEL  Magazine Setup  Optimized placement sequence

23 210 / 203 translator Electrical Domain Mechanical Domain

24 Simulator Feeder information Component information Placement Sequence Geometric Models Placement Simulator Virtual Board DFM Rule Check Components violating DFM rules

25 25 Simulator \ Configurable  Kinematics – accepts a mechanism graph  Graphics – Geometric Models of machine components \ Next steps  Machine Library  Adding functionality Nozzle compatibility Placement timing

26 26 Project timeline Year 1 Year 3 Year 2 Process Planning Production & Setup Planning Shop Floor Controller STEP Basics Machine Simulator DFM Checking Process Planning Modules Development of SFM Controller Capacity Planning & Simulation Standardization Deployment Process Simulation

27 27 Work done \ Accepting an AP210 2D design file \ Manufacturability analysis \ Extracting component information \ Generating 3D models of components and assemblies \ Simulation using Universal HSP and GSM \ Generating  “as designed” view  “as simulated” view

28 28 Work done (cont.) \ Simulation  Double sided boards  Multi Panel Boards  GSM  Multiple stage simulation \ Testing  Update of DFM Rules  Development of ‘Fact Extraction’ software \ AP210 Viewer  Full 3-D assembly model of board  Association between Graphical entities and AP210 entities  Ability to display properties

29 29 Future Work \ DFT  Bare Board testing  In-circuit test: fixtures for the test \ Manufacturing systems planning \ Generating stencils for printed circuit substrates \ Explore transition from Line concept to Cell concept  Capacity planning and simulation  Describing production facilities (AP-220) \ Deployment


Download ppt "CAM-I Scalable Flexible Manufacturing Initiative NGMS Task 6.1."

Similar presentations


Ads by Google