Plan of production of SiW-ECAL slabs in Japan

Slides:



Advertisements
Similar presentations
LLRにようこそ Laboratoire Leprince-Ringuet (LLR)
Advertisements

Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Calice ECAL Prototype Status Silicon sensors : Production Reception.
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
David Bailey Manchester. Summary of Current Activities UK Involvement DAQ for SiW ECAL (and beyond) “Generic” solution using fast serial links STFC (CALICE-UK)
Taikan Suehara, ILC-Tokusui annual meeting, 16 Dec page 1 Overview of SiECAL and related DAQ development Taikan Suehara (Kyushu University, Japan)
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
CALICE – 12/07/07 – Rémi CORNAT (LPC) 1 ASU and standalone test setup for ECAL MAIA BEE project Overview DAQ dedicated Sensor test In situ debug and maintenance.
Taikan Suehara, 13 May 2014 page 1 Status of SiW-ECAL development for ILD Taikan Suehara (Kyushu University) on behalf of ILD SiW-ECAL development.
CALICE ECAL/AHCAL Electronics 5-6 July DESY L.Caponetto, H.Mathez 1 Developments and Planning towards 1 m 3 Technological DHCAL Prototype Didier.
Mickael Frotin– 07/06/2009 Demonstrator - Assembly ECAL meeting - London.
ECAL silicon- tungsten status
Mickael Frotin– 15/01/2010 ECAL MACHANICAL R&D ECAL meeting - PARIS 1.
LPNHE activities Contribution in the development of an assembly line for highly granular calorimeters with semiconductor readout Gluing robot system Metrology.
SiW ECAL Technological Prototype Test beam results Thibault Frisson (LAL, Orsay) on behalf of the CALICE collaboration.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Cristina Lo Bianco - LLR Cosmics test for the W-Si prototype (CALICE) Why the test in cosmics? The cosmics test-bench DAQ for the cosmics test-bench All.
Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 1 Vaclav Vrba Institute of Physics, AS CR, Prague CALICE ECal Status Report.
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
EUDET JRA3 ECAL in 2007 : towards “The EUDET module” C. de La Taille IN2P3/LAL Orsay.
Taikan Suehara, SiECAL meeting in Tokyo, 10 Sep page 1 Status of DAQ development for ILD-SiECAL in Kyushu (and more) Taikan Suehara (Kyushu University,
1 October 2003Paul Dauncey1 Mechanics components will be complete by end of year To assemble ECAL, they need the VFE boards VFE boards require VFE chips.
ECAL review 5 th ILD LAL Orsay May 2011 K. Kawagoe Kobe-U  Kyushu-U in April 2011.
Taikan Suehara, Belgrade, 7 Oct page 1 Hybrid ECAL: optimization and related developments Taikan Suehara H. Hirai, H. Sumida, Y. Sudo, T.
Taikan Suehara, LLR-Kyushu meeting, 20 June 2014 page 1 Discussion on DAQ: my prospects Taikan Suehara (Kyushu University)
Thursday Sept 17, 2009CALICE week IPN Lyon1 EUDET Module Plans of integration and assembly Julien Bonis SLAB assembly : Process phases.
Taikan SUEHARA, IN2P3-KEK collaboration meeting on ATF2, Annecy, 2007/10/15 Shintake Monitor: Installation and Commissioning Schedule Taikan SUEHARA, The.
CALICE SiW EcalAboud Falou/ LAL-Orsay Detector SLAB Integration EUDET Prototype Slab cross section, thickness budget Space Frame Ladder {Step.
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
Monday June 8, 2009CALICE SiW ECAL Meeting ULC London EUDET prototype Thermal drain and plans for module assembly Julien Bonis CAD model.
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
Status Report toward the Beam Test Quick report on the MPPC mass check Other beam test related issues –Schedule –Participants –Jobs –etc … Satoru Uozumi.
Taikan Suehara, CALICE meeting at KEK, 20 Apr page 1 Report from CALICE DAQ Task Force Taikan Suehara (Kyushu University, Japan)
14 jan 2010 CALICE/EUDET FEE status C. de LA TAILLE.
SiW ECAL Marcel Reinhard LLR – École polytechnique LCWS ‘08, Chicago.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
FKPPL, Febuary , Rémi Cornat 1 FKPPL technical activities CALICE Si-W ECAL Rémi CORNAT
SiW Electromagnetic Calorimeter - The EUDET Module Calorimeter R&D for the within the CALICE collaboration SiW Electromagnetic Calorimeter - The EUDET.
CALICE Collaboration Meeting May 2011 Roman Pöschl LAL Orsay Report from the Technical Board CALICE Collaboration Meeting CERN May 2011.
Taikan Suehara, Belgrade, 7 Oct page 1 Hybrid ECAL: optimization and related developments Taikan Suehara H. Hirai, H. Sumida, Y. Sudo, T.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
EUDET Extended SC SiW Ecal 1 SiW Ecal EUDET Module - General Schedule - Development of Different Components - (Towards) a working prototype Roman.
EUDET Annual Meeting SiW Ecal 1 SiW Ecal EUDET Module - General Schedule - Development of Different Components - (Towards) a working prototype Roman.
Mickael Frotin– 19/10/2009 ECAL MACHANICAL R&D CALICE meeting - Genève 1.
Rui De Oliveira Vienna March 2014 Industrialisation of Micromegas detector for ATLAS Muon spectrometer upgrade 1.
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
14.4. Readout systems for innovative calorimeters
K. Kawagoe / Kobe-U FJPPL KEK 2007 May 9th
AIDA st annual meeting DESY, 27/01/2016
Status on INTT bus extender R&D
Ladder Assembly All tools and jigs produced Glue dispensing works
Current activities in Kyushu for Silicon-ECAL
Katsuro Nakamura Sep. 10, 2015 VXD meeting
Ladder Assembly All tools and jigs produced Glue dispensing works
ECAL Integration / CALICE DAQ task force
T1 status (a selection from EDR presentations)
C. de La Taille IN2P3/LAL Orsay
BT2017 Analysis meeting LAL, 30/11/2017
CALICE/EUDET Electronics in 2007
CALICE Collaboration Meeting KEK/Japan – April 2015
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
Module/Ladder Assembly
ECAL electronics schedule
Ecal Front End Electronics
AIDA 2020 Tel Aviv group.
Stéphane Callier, Dominique Cuisy, Julien Fleury
Status of the EUDET Prototype
CALICE(-UK) Status Paul Dauncey 7 Oct 2004 Paul Dauncey.
Perugia SuperB Workshop June 16-19, 2009
Presentation transcript:

Plan of production of SiW-ECAL slabs in Japan Taikan Suehara (Kyushu University) Kyushu team: K. Kawagoe, T. Yoshioka, I. Sekiya, H. Yamashiro, Y. Miura, R. Mori Collaboration with SiW-ECAL team: LLR, LAL, LPNHE, Kyushu, KEK, Tokyo

Kyushu activities Ongoing Planned SKIROC2/A studies with testboard: I. Sekiya Participation and analysis of test beam: Y. Miura, I. Sekiya APD/PSD/LGAD study: R. Mori, H. Yamashiro Planned Firmware on DIF etc. Y. Miura FEV production & test T. Suehara, Y. Miura, I. Sekiya

Short Slabs - Status Successfully tested 7 slabs at DESY testbeam in June Several issues Retriggering Interconnection Dead slabs etc. Still many things to do

Production in Japan - Targets Optimization of production/test method Benefits from Japanese industry PCB, FPC, dispenser, … We have close connections to design companies (instead of work by in-house engineers in Europe) Quick studies in Japan by having more slabs Firmware development Development of test stands (ASIC, slab with RI, cosmic, …) Get more slabs by production at multi-sites Investigate optimal price

Breakup of a short slab

Breakup of a short slab (cont.) Sensors by HPK FEV with SKIROC2(A) Gluing sensor to FEV SMB board (adapter to DIF) and interconnection FPC (Kapton) for bias (and gluing them) Copper sheet and cover Stiffener DIF

Preparation Sensor (just buy) FEV/SMB (production in Japan) Will obtain ~20 sensors in Jan/Feb 2018 FEV/SMB (production in Japan) Interconnection Gluing / alignment (dispenser + robot) FPC (for bias)

FEV/SMB production FEV: flatness Interconnection FEV-FEV and FEV-SMB They confirmed < 0.4 mm (measured after virtual reflow) Interconnection FEV-FEV and FEV-SMB Plan to replace them with FPC connector/cable SMB: small bugfix shared with LLR (under discussion)

FEV/SMB production (cont.) SMB – currently mixed rigid-flexible PCB Cost is high (-800 EUR/board @ 5 boards) Can be replaced by connectors/FPC (as same as interconnection) Mechanical strength?

Gluing We will buy a dispenser in Kyushu with other projects ATLAS pixel upgrade Muon g-2/EDM in J-PARC Investigating several providers Musashi engineering Iwashita engineering Cost: 12-20k EUR (dispenser + robot) Target Experience of assembling slabs (glue + alignment) Optimization of glue etc.

(Optimistic) Schedule First FEV with single SKIROC2: Nov.-Dec. Dispenser arrival: -Dec. First test & assembly: Dec.-Feb. Production with 16 SKIROC2(A): Feb.-Mar. Testbeam with 5 slabs from Japan: ~summer