Reminder of Stave250 Tooling Design

Slides:



Advertisements
Similar presentations
Click on this image to open the full PDF document.
Advertisements

Stave Vacuum Tool Tim WP4 Face to Face Liverpool, 13/11/14.
Stave 130 Tooling John Carrol & Tim Jones. Status First generation stave assembly tool model modified to incorporate… – Stave Geometry Length 1277mm Width.
LIGHT-DUTY BELT FASTENER SYSTEMS
ATLAS Module building at Glasgow
Components Connection Jig Graph Paper (#4101) Mounting Blocks (#5902) Nails Tape Measure Pen Hammer Customer Coordinates.
Chapter 27: Workholding Devices for Machine Tools
Assemblies in Solidworks Simple Assembly Download 4_assembly_example.zip Open a new assembly file (use tutorial template) Click view, origins (to show.
Stave # 1 Metrology Eric VIGEOLAS, WG2 July the 12th 2011.
1. Start with Kit of Parts Original kit of parts New carbon fiber (CF) parts Flexure elements Links Steel triangles Steel faceplate Polyester flexure 2.
Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.
CERN PH/DT 12/05/13 Jordan Degrange / Francisco Perez Gomez CERN PH/DT.
Jigs and Fixtures.
1 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Ladders, Trays and Towers Construction A.Brez.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Co-Cure Stave Construction 11/10/2010. Co-Cure cables should have flashbreaker tape still covering the surface for this process. SO - don’t remove the.
Traditional Fixtures & Fittings 1 J. Byrne Fixtures & Fittings J. Byrne
Progress on staves – mechanical & thermal. Core and materials.
J.Byrne Block Joint : Hard plastic Surface fitting, side to end Modesty Block : Hard plastic. Surface fitting, side to end Bolt & Cam : Metal.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
ASSEMBLING THE PCB – V3.914 Hold the PCB as shown below.
Silicon /pcb assembly R Thompson, J Freestone LAL 3 June 08.
WP4 – Plans for next 6 months
New design With fewer parts and easier manufacture degrees 20mm 245.
Knock Down Fittings J.Byrne 2014.
A thermo-mechanical petal Sergio Díez Cornell Petal discussion, 24 Oct 2014.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
Counter Bore. Spot Facing – Provides a true bearing surface for a washer. Counter boring – Provides a recess for a bolt head, bushing or pin.
Hybrid Mechanical/Thermal Design Ray Thompson / Manchester FP420 meeting Torino 11/12 July 06.
Plank #7 and beyond. 2 What was new for plank#7? Carbon-fibre jig Oversize (by 10mm) facesheets during stave core build –Facesheets now at the very limit.
QMUL 2/2/12 1  Current status of new alignment system.  Drawing status update.  Laser alignment.  Module removal from frames for new kit.  Stave(lets.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
Stave 130 Geometry Peter Sutcliffe ATLAS Strips WP4 Meeting 26 th March 14 Liverpool.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
Gluing, measuring and shearing Heated plate curing Is the process feasible? Tests with 130nm hybrids Measure resulting glue thickness Determine the shear.
Frames and insertion Note: Stavelet holder (working) document available on wiki:
Stave130 Assembly Jig (Tim). Current Tooling Components – CF jig + ‘C’-channel jig & various face-sheet positioning aids It works! – Seems to produce.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
Metrology of the Stave250 Assembly Jig (Tim). What do we need to measure?
1.2 m Stave with Co-cured Facings Using Low Areal Density Fiber G. Viehhauser (Oxford) C. Haber (LBNL) T. Hurteau, W. Emmet (Yale) R. Rurns, D. Lynn (BNL)
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
Stave Tooling & Plans for Future Stave-building (Tim)
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
Prototype Review 04-Sept Different side-closeout to allow petal end-insertion concept…self- guided… Only backup from last review in July…
Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.
(Tim Jones).  Who am I? ATLAS-UK Tracker Upgrade work-package leader for WP4 (Mechanics)  Materials, Cooling, Stave Core Assembly, Module Mounting,
Dan Cheng 8/27/2015 MQXFS1 Observations and Feedback from the Assembly Processes, Part II.
Pocket and Metric Hole in End Parts Miao Yu 02/25/2014.
Completed Front and Rear Standard 10 ½” 1 ½” 3 ¼” 4 ½” 1” ¾” 1 ½” 6” ¾” Channel Length: 5 ¼”, ¾” from end.
Machining Skills Flexible Manufacturing.
STEP 1: ASSEMBLE ANGLE PLATES
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
A comparison of Some Properties of Sandwich Test Tokens with Various Core Materials (Tim)
Date of download: 11/6/2017 Copyright © ASME. All rights reserved.
WP4 – Plans for next 6 months
News from Saclay F. Bauer, M. Boyer, D. Desforges, E. Ferrer-Ribas, W. Gamache, A. Giganon, P.F. Giraud, P. Graffin, S. Herlant, S. Hervé, F. Jeanneau,
STEP 1: ASSEMBLE ANGLE PLATES
Knock Down Fittings J.Byrne 2015.
Test RF gun cavity Takuya Natsui.
Traditional Fixtures & Fittings
Humanities Matching Final
Here’s the flange for the robot
STEEL PLATES.
Humanities Matching Final
Valve stem “gag” mechanism
Pixel module assembly tooling
1st solution. Cut internal to the plate with startup hole
Fixtures, Jigs, and Check Gauges
Presentation transcript:

Reminder of Stave250 Tooling Design (Tim)

Stave Assembly Tool Update Development of 2nd generation Stavelet assembly tool CF / Nomex sandwich construction Brass inserts for dowels & threaded holes Steel plates for magnetic chuck Vacuum channel formed in FR4 Ground CF top plate

C-channel Jig 2 C-channels loaded into Jig Jig located on assembly tool using locator blocks Holes match !!!

Trial Assembly Studies Stave Components Facesheets K13D2U/RS3 panels 1.3m x 0.31m (0/90/0) Cut out on pattern cutter Honeycomb Nomex grade N636 (Korex replacement) http://www.compositematerialsltd.com/pdfs/nomex_honeycomb/cormaster_n636.pdf 4.8mm cell / 28kg.m-3 (1.75 lbs/cuft) Laser cut (1st go as a trial) ‘C’-channels Original manufacturing tool – slight lip on open edges (need to re-make tool to improve) End Close-outs Peek (from QMUL)