Ongoing and to do work M.Lenti.

Slides:



Advertisements
Similar presentations
TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 7-8 October 2003 Børge Svane Nielsen, Niels Lindegaard,
Advertisements

MAGIC II Mirrors and reflector M. Doro Udine. MAGIC Collaboration Meeting. 2006/05/10-13.
Magnet Measurement Device for MICE F. Garnier, P-A. Giudici, F.Bergsma CERN MICE Collaboration Meeting No July 2011 Oxford technical drawings by.
Engineering 28 University of California Lecture # 9 –Orthogonal projection –Multi-view presentation –Third-angle projection –First-angle projection.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
M. Mariotti Padova University/INFN, CTA meeting Berlin 3-4 May 2006 >1 m 2 metallic mirror technology AIM find a suitable technology for large reflecting.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Leaf Spring prototype preparation M.Lenti. Reminder Piet’s proposal: two dowels inserted into two mirror holes (vertical alignment); mirror weight as.
POOLROOM MATH Geometry.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
INFN-LNF / D. Orecchini – S. Tomassini – 06/24-25/2015 CLAS12 – RICH MECHANICS REVIEW SLIDE 1 RICH MODULE INTEGRATION IN CLAS_12 – LAST LAYOUT RICH MODULE.
LAUNCHER BASE PARTS B A D E F C G. LAUNCHER BASE PARTS B A D E F C G.
September 8, 2015 THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER Helios Vocca.
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
Status Brussels GANTRY Ê Assembly of R3 modules (36 modules) 4 precision of the modules 4 problems with DataBase (not adapted for single sensor modules)
Hybrid Integrated Circuit
Support and alignment of PXL box with MSC, operation steps
RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.
CLASSE prototype: mechanical concepts G. De Michele, EPFL-PSI-CERN on behalf of CERN team SLAC, 16 th April, 2012.
Wall survey: With and without TT7. The wall targets are hybrid targets made of precise uncoded targets (the pin targets) which enter in the hole of the.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
1 Fulvio TESSAROTTO the new RICH beam pipe the new RICH beam pipe - pipe production, gluing and tests - measurement and removal of the old pipe - fixation.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
Magnet Measurement Device for MICE F. Garnier, P-A. Giudici, F.Bergsma CERN MICE Collaboration Meeting No. 29 RAL technical drawings by O.Jamet.
Status of RICH mechanical design at PNPI E.Vznuzdaev for PNPI group: V.Dobyrn, A.Khanzadeev, E.Kormin, V.Lebedev, N.Miftakhov, V.Polyakov, V.Samsonov,
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
Levers & Fluids Rig Step-by-step assembly instructions (c) 2012 Mechanical Kits Ltd.
RICH WG: Introduction M.Lenti. Outlook PMs and sockets: what we have Vacuum vessel, no Neon purification Cost of aluminum disks (raw material) Cost of.
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
A New GEM Module for a Large Prototype TPC: Status and Plans By Stefano Caiazza On behalf of the FLC DESY.
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
Integration with LDC & Push-pull impact on LumiCal Wojciech Wierba Institute of Nuclear Physics PAN Cracow, Poland FCAL Workshop, LAL Orsay,
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
Lab tests on Mirror Support M.Lenti. Glass robustness Test if mirror glass is robust enough to be supported in a single point (single dowel approach)
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
Design for a New Optical Table of the Shintake Monitor Takashi Yamanaka The University of Tokyo ATF2 weekly meeting 2007/9/26.
Camera Motion System Requirement Design Details FEA.
PXIE RFQ Engineering Design Steve Virostek Engineering Division Lawrence Berkeley National Laboratory April 10, 2012 Project X Collaboration
Test on mirror support prototypes M. Lenti. News from MARCON Shipping at CERN of all the mirrors: end of 2010 – beginning of dummy segments ordered.
Target Status 27 th August 2009 Chris Booth The University of Sheffield.
ECAL LED monitoring system upgrade status 04/09/20131.
Completed Front and Rear Standard 10 ½” 1 ½” 3 ¼” 4 ½” 1” ¾” 1 ½” 6” ¾” Channel Length: 5 ¼”, ¾” from end.
Rear end assembly.
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
Update on Pavia MM mechanical prototype
NA62 LAV Anti1 REMOVAL & TESTS
VELO-installation meeting CERN, January 17, 2006
Manufacturing of the first FCC-hh beam screen prototype for ANKA
Cover-Gear Box assembly
Barrel EMC assembling (EDMS DOCUMENT NUMBER /1)
New field cage LP2 Ole Bach, Bernd Beyer, Volker Prahl
Performances of the NA62 RICH detector
SciFi option for neutrino target tracker
LumiCal mechanical design, integration with LDC and laser alignment
Introduction to SolidWorks
Hydraulic Arm Assembly Instructions
Introduction to SolidWorks
Ballista Project 2 120mm Axle hole 3 Nails 1 200mm
Station and Module Support Frames
Fastening Wood Turn to Unit 10 on page 117.
BUILDING AN AUTONOMOUS QUADCOPTER.
Presentation transcript:

Ongoing and to do work M.Lenti

Pins to be glued on the segment Anti-Rotation Pin: where to fix the stabilizer ribbon Drive Pin: where to fix the pulling ribbon 05/03/2013 M.Lenti

Drawings in EDMS Pins to be glued now 05/03/2013 M.Lenti

Pins to be glued now Pins in stesalite in production by a private company close to Perugia Expected to be completed this week (or the next at max) 2 “drive pins” per segment, same dimensions for all; position in a 500 mm diameter circle centered on the dowel touching point (only two, almost central segments, have the pins on a 250 mm diameter circle), forming a 90 degree angle 1 “antirotating pin” per segment, different lengths depending on the segment position, some on the left – some on the right of the segment (to avoid overlapping ribbons) To be shipped to CERN beginning of april 8 march in Ferrara: final drawings where to glue the pins (essentially where the antirotating pin goes to the right or to the left of the segment) Gluing mask in preparation in Perugia Pins gluing during the mirror coating process Don’t forget that there are not trivial geometrical differences between segments (lebghts, Position of the holes, see F.Bucci presentation on February 6, 2012) 05/03/2013 M.Lenti

Aluminum ribbons No italian firm found (!!!) for the required alloy Swiss company: Lamineries Matthey in La Neuveville (about 20 years ago made the LKR copper-berillium electrodes) I am ordering a coil of aluminum AW6082 “annealed temper”, 0.2mm X 10mm, 6 kg Delivery time: 2 weeks from order (directly to CERN, to Ferdi attention…) Probably after Easter available at CERN Other orders possible if needed (different sizes, alloy, etc) 05/03/2013 M.Lenti

To be tested/prototyped How to properly cut, make holes, bend the aluminum ribbon “triple ribbon” point: welding (Vito preferred), smart cut (Piet) or what else? 05/03/2013 M.Lenti

To be tested/prototyped How to fix the ribbon to the “drive pin” Screw? Hook? The mounting scheme is related to the choice Fix the ribbon with the segment “far” from the panel and then pass the ribbon through the (30 mm diam) hole? Or put the segment on the dowel and then fix the ribbon already in position? Special tooling? For the stabilizer ribbon seems simpler: put all the vertical ribbons, then install a segment and screw the ribbon to the “anti-rotating pin” with a screwdriver inserted in a panel hole in front of it. But must be checked. 05/03/2013 M.Lenti

Dowel Support Not final drawing “pyramid” in stesalite Dowel in aluminum Piramid glued to the honeycomb panel, with reference pins for centering Still under discussion: one single piece or one piece to be inserted in another piece 05/03/2013 M.Lenti

Other pieces Red: stesalite Stabilizer ribbon keeper with regulating “spring” Actuating ribbon keeper 05/03/2013 M.Lenti

Piezo Motors Fixing the ribbon to the Piezo rod seems simple but must be worked out All piezo-motors available in Firenze All encoders available in Firenze Control electronics to be bought (we have an informal offer for two module with 20 channels each from Piezomotor) 05/03/2013 M.Lenti

Available We have 4 dummy segments: same glass, same shape (hexagonal), same size, same holes in the back as true mirrors. One dummy is at CERN to test the coating procedure Three dummies are in Firenze 05/03/2013 M.Lenti

Available Piezo with encoder Support for one segment Dowel 05/03/2013 M.Lenti

Laser Alignment in preparation See my presentation on August 28, 2012 Laser Alignment in preparation Support for mirror 1 (old type: two lateral holes) Support for mirror 2 (old type: two lateral holes) 3-platforms where laser, beam-splitter and Diode can be placed 05/03/2013 M.Lenti

Conclusions The mounting scheme has to be worked out Tooling necessary for manipulating the segments? Scaffolding…. Honeycomb panel “partially” decoupled from details of the support: can proceed independently? 05/03/2013 M.Lenti