LAAWG Status Report – 15th May 2007

Slides:



Advertisements
Similar presentations
LHC ACCESS SYSTEM 1 Edms: LAAWG Status Report – 10th July 2007 P. Ninin, L. Scibile, T. Ladzinski.
Advertisements

Commissioning the access system M. Gruwé Machine checkout workshop November 8 th 2007.
O. Beltramello ATLAS experimental cavern Patrol Procedure LAAWG – October 07 O. Beltramello.
Tomasz Ladzinski GS/ASE. LASS Annual Maintenance & Tests General Principles Each winter shutdown preventive maintenance of EIS takes place. It is followed.
SESAME PSS Phase I : Microtron + Booster Morteza Mansouri SESAME PSS engineer on behalf of Safety group TAC Morteza Mansouri, SESAME TAC 2012, Nov.10th,2012.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.
Operational tools Laurette Ponce BE-OP 1. 2 Powering tests and Safety 23 July 2009  After the 19 th September, a re-enforcement of access control during.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
TS Workshop, Archamps, May 24 – May 26, 2005 The LHC Access System Status report – May 2005 P. Ninin & the Access project team TS/CSE.
B. Todd et al. 25 th August 2009 Observations Since v1.
Status Report from LHC Safety System Task Force Emmanuel Tsesmelis / TS-LEA on behalf of the Task Force LEAF 11 May 2007.
LHC ACCESS SYSTEM 1 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: Access Control and Safety System for the LHC Experiments P. Ninin L. Scibile.
Eric Thomas - Safety systems for LHC experiments 1 Safety Systems for LHC experiments Baseline specifications – Additional needs – Actions taken.
1 Safety and Database Subsection ADO - PO - SA Safety achievement and future activitiesSafety achievement and future activities Database (see K. Pommes.
LHC ACCESS SYSTEM 1 Authors: P, Ninin, L. Scibile T, Ladzinski EDMS: The LHC Access System Where do we stand ? P. Ninin, T. Ladzinski, L. Scibile,
Access system M. Gruwé (AB/OP) Thanks to TS/ASE group Extended LTC meeting March 3 rd 2008.
TS Workshop, Archamps 4 May 2004 SAFETY AND ACCESS CONTROL Where do we stand ? P. Ninin & the Access project team TS/CSE,
For more info:
Review of Safety Systems for the LHC Experiments & Experimental Areas Emmanuel Tsesmelis / TS-LEA LEMIC 20 March 2007.
Schedule IT General Schedule 9 th, September 09 Today.
LHC ACCESS SYSTEM 1 EDMS: January 2008 Global Tests of the LHC Access system Outcome P. Ninin, T. Petterson, S Grau, T. Ladzinski 18 th January.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
Access system global tests M. Gruwé LHCCWG January 15 th 2007.
Christophe Martin TE-MPE-EP 02/06/ The BIS and SMP activities during LS1 MPE Group Review, 2 June 2015 Christophe Martin, Stephane Gabourin & Nicolas.
Linac2 and Linac3 D. Küchler for the linac team. Planning first preparative meeting for the start-up of Linac2 in June 2013 –this early kick-off useful.
External Data and DIP Oliver Holme 18 th January 2008.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days Access Safety Systems Modifications & tests in 2006 Presented by Rui Nunes TS-CSE-AAS.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
GIF completion status Adrian Fabich, EN-MEF-LE on behalf of the GIF project team GIF users meeting, 14 th January 2015.
Access system LHC-SPS M. Gruwé and J. Ridewood OP days March 18 th 2008.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
V4.
(Access system for HWC)
SPS Personnel Protection System Renovation Project
PERSONAL SAFETY INTERLOCKS External EHS Expert Panel Workshop
Beam Interlock System SPS CIBU Connection Review
DRY RUNS 2015 Status and program of the Dry Runs in 2015
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
R. Denz, A. Gomez Alonso, AT-MEL-PM
BE-ICS Activities during the LS2 Period (15 min)
Gas system Commissioning procedures and status
Evolution and future of the Access safety and control systems
on behalf of the RF group
Saturday :12 Stable beams fill 3351 Initial luminosity
LHC Experimental Vacuum Systems Status October ‘07
Quality Assurance applied to Accelerator Safety
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
1v0.
SPS CC: Final plan for interlocking of crab cavities in SPS
Upgrade Strategy for the Experimental Vacuum Systems
James Ridewood BE-OP-SPS
Machine Protection Xu Hongliang.
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
Beam Dump and Injection Inhibits
Wire almost entirely through beam before BLM triggers dump
Assumption for a given sector
DPS-7/Espanola E-911 System Upgrade
Machine Protection System Commissioning plans
Status Report and highlights from workshop II
Machine Protection PLC Based System Verification and Validation Plan
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Saturday 2nd October BLM threshold follow-up - Bernd Dehning and Joerg Wenninger Following MPP approval, Bernd Dehning has increased the BLM thresholds.
Access Control for CERN Experimental Areas
Powering and Safety day Underground access during powering tests
Presentation transcript:

LAAWG Status Report – 15th May 2007 P. Ninin, L. Scibile, T. Ladzinski

Dash board – 15 may 07 Cable Access Control Access Safety Commis. Points Other Eis Soft & IHM Control Racks Soft Hard Loop Power System LHC1 Tested 4/6 Instal. Test Provis. Dev. Design Deliv. W33-35 L1.8 1/1 Constr. LHC2 W36 W28-37 W28-33 W23-42 W19 W43-45 LHC3 W24-27 TBD W40-42 LHC4 5/5 W22-24 LHC5 3/5 W30-32 LHC6 W34 W24-32 W25-29 W22-36 W36-38 LHC7 OK-NC OK V1 OK W25-27 LHC8 4/5 OK, NC CCR Completed with NC On-going CCC

Layout of LHCb in UX85 Area

LHC5 - CMS

ATLAS

ATLAS

LHC2- ALICE

ALICE - Access via PX24

Functional test of the LHC Access system in point 8. LACS & LASS overall system tests complete CCC and CCR hardware & software Complete LHC8 interlocked area Test scope: Access Operation in “General, Restricted, Closed modes Individual equipment test Access points, doors, shielding walls, patrol, … Patrolling of the 13 access sectors (incident simulation) LHC 8 closure -> safe condition for Beam Operation Moving to Beam operation: Trigger of the Beam Imminent Warning Unlocking of the Emulated LHC EISBeam and of the SPS Intrusion Checking of the system behaviour in case of : emergency stop, equipment, control system, power system failure Moving back to Access operation Not included: access control delegation to XCR

Synchronised operation from XCR and CCC Delegation Synchronised operation from XCR and CCC Only the Access requests are re-routed to XCR (No control of any Machine related element). Audio & Video control Delegation cancelled by a LASS VETO or by the CCC

Functional test of the Access system in LHC8. Results : First functional tests in LHC8 allowing the verification of all the concepts and equipment. Tests were globally successful Safety functions operated as specified Non conformities concerning installation defects, ergonomics of the restricted mode of operation, and the intercom system. Clear need of training and users’ information Test organization Machine reserved 2 evening and 1 Saturday Thanks to LHCB for the cooperation, Test were eased as the cavern was not completely fenced Next stages: CMS, ATLAS, ALICE testing To be organized in collaboration with LAAWG

Feedback from operation AND open issues Use of the new access points: Initial difficulty of use of the new access procedure As far as we know, everybody has been able to access Much faster “burn-in” than previous recorded experiences (see PX15). Much faster and flexible authorisation system (on-line update of databases from registration to access point). Training of experimental control room operators Open Issues Operation of the Non-interlocked areas Access point in pressurized areas Being analysed by SC (R. Trant LEAF 10/5/07)

Important points concerning the Exp. Areas. LHCB Test after final installation of fences and shielding wall Patrol procedure Access procedure to the non-interlocked area PZ85 renovation ATLAS SSA: pilot installation in June, available in September Partial commissioning planned W33-35 PX15 Access Point upgrade CMS Installation of the remaining access points (UPX56) Cabling of the Patrol devices in the cavern Commissioning planned W30-32 PM54 Access Point Design & Installation ALICE W27-W40 installation and commissioning Work preparation

Conclusion Good progress – despite a hesitant Contractor. Expect to be ready as planned (Master Schedule) Operational issues - to be finalized with the experiments.