Presentation is loading. Please wait.

Presentation is loading. Please wait.

SESAME PSS Phase I : Microtron + Booster Morteza Mansouri SESAME PSS engineer on behalf of Safety group TAC 2012 1 Morteza Mansouri, SESAME TAC 2012, Nov.10th,2012.

Similar presentations


Presentation on theme: "SESAME PSS Phase I : Microtron + Booster Morteza Mansouri SESAME PSS engineer on behalf of Safety group TAC 2012 1 Morteza Mansouri, SESAME TAC 2012, Nov.10th,2012."— Presentation transcript:

1 SESAME PSS Phase I : Microtron + Booster Morteza Mansouri SESAME PSS engineer on behalf of Safety group TAC 2012 1 Morteza Mansouri, SESAME TAC 2012, Nov.10th,2012

2 Contents: 1.Radiation Monitors (?) 2. Plan and time schedule for PSS 3. Equipment of the PSS (inside the tunnel) 4. Equipment of the PSS (outside the tunnel) 5. Procedures defined for the PSS 6. Acknowledgment 2 Morteza Mansouri, SESAME TAC 2012, Nov.10th,2012

3 Radiation Monitors (?) Rules: Keep radiation level < 1mSv over one year (2000 h), 0.5 µSv/h Purchasing of Radiation Monitors in progress (expected June 2013): - 5 movable combined stations connected to PSS through interlock signals. - 2 portable Gamma. -2 portable Neutrons. -2 Gamma spectrometers and calibrations kits outside tender/later. Passive: - Gamma dosimeters/ SESAME. - Neutron TLD’s outsourcing (JAEC). Morteza Mansouri, SESAME TAC 2012, Nov.10th,2012 3

4 4 Plan and time schedule for PSS - The Personal Safety System of SESAME must comply with norm IEC 61508 (SIL-3) -All SIL-3 equipments must be approved from Jordan Institution for Standards and Metrology (JISM) Organization??? The contractor will be responsible for providing all the hardware and software of PSS. Tasks will be Shared between contractor and SESAME as follows: a)Contractor tasks: 1. Programming the PSS PLCs by a certified PLC programmer. 2. Assembling and installing the PSS cabinets (Booster tunnel & Control room PSS cabinets) 3. Training SESAME staff for safety PLC programming. 4. SAT in cooperation with SESAME staff. 5. Providing the drivers needed to connect PSS PLCs to monitoring system of PSS. 6. Providing the documentation.

5 Morteza Mansouri, SESAME TAC 2012, Nov.10th,2012 5 Plan and time schedule for PSS b) SESAME tasks: 1.Installing the PSS field hardware and connecting the interlock signals to the cabinets terminals. (an electrical technician should be hired) 2.All field cabling and installing cable trays. 3.SAT in cooperation with contractor. 4.Monitoring system for PSS by EPICS (control team + PSS engineer) 5.Preparing the final documentation of PSS.

6 Morteza Mansouri, SESAME TAC 2012, Nov.10th,2012 6 Stage No. Stage DetailsExpected End date PSS 0Preparation of the documentEnd 11/2012 ? 1Internal reviewEnd 12/2012 ? 2External reviewEnd of 12/2012 ? 3Tender on WEBFirst 1- Middle 2/2012 ? 4DecisionEnd 2/2012 ? 5Contract SignatureEnd 2/2012 ? 6Proposed designMiddle 3/2012 ? 7Acceptance test at Supplier siteSimulation End 4/2012 ? 8Equipment delivery, installation …….End 7/2012 ? 9SESAME training and SATFirst 8/2012 ? 10Expected CompanyLocal/ International ? 11Warranty5 years ? Plan and time schedule for PSS

7 Morteza Mansouri, SESAME TAC 2012, Nov.10th,2012 7 Equipment next to Booster Tunnel Door (D1) Connected to PSS 1.PSS cabinet with Restricted Access capability 1.1 4 Light panels 1.2 2 restricted access keys 1.3 Emergency Stop Push Button 1.4 Card reader 1.5 Contact Control room 2. Magnets light indicators 3. Evacuation Horn light 4.Attached to the door 2 different lockers 5. Next to the door from inside Open door Push button (P) 6.Next to the door from outside 6.1 Radiation Monitor 6.2 Camera 7. Fire detector (F.D) F.D

8 Morteza Mansouri, SESAME TAC 2012, Nov.10th,2012 8 1. 4 Search Push Button (S) 2. 7 Emergency Push Button (E) 3. 2 speakers (sp) 4. 2 (Horns, beacon) (H) 5. Fence 6. 4 light indicators (ON and OFF) for:  Bending Magnets  Pulsed magnet 7. Fire detector Equipments inside the tunnel connected to PSS

9 Morteza Mansouri, SESAME TAC 2012, Nov.10th,2012 9 Procedures defined for PSS 1.Search the tunnel 2.Accessing the tunnel in restricted mode 3.Emergency stop of the machine 4.Intrusion to the tunnel 5.Open the tunnel 6.Safety fault 7.Interlocks from radiation monitors 8.Beam ON 9.RF system, pulsed and bending magnets enabling(interlocks) 10.An example (next page)

10 Morteza Mansouri, SESAME TAC 2012, Nov.10th,2012 10 Emergency Stop procedure Booster TunnelTunnel CabinetControl RoomDetails 1Any STATESuitable Tunnel Cabinet lightAny STATE 2 Push Emergency Stop button or One channel signal fail Diagnostic shows buttonEmergency buttons in Tunnel or on cabinets 3 Trip permits (Microtron Trigger, RF, Pulsed power supplies, Bending magnet power supplies) Diagnostic shows Booster tunnel Interlocks 4Unlock doors Diagnostic shows door position 5 Reset button light off 6 Four Tunnel Cabinet STATUS start blinking 7 DIAGNOSTICS Identify device, show status 8 Unlock emergency button(After solving the problem) Diagnostic shows button 9 Booster tunnel Reset button blinking 10 DIGNOSTICSRecord all incidence 11 Push reset button 12 DIGNOSTICS reset 13 Reset button light on 14State OPENOpen light onState OPEN

11 Morteza Mansouri, SESAME TAC 2012, Nov.10th,2012 11 Monitoring system for PSS

12 Acknowledgments: 1- Adli Hamad (SESAME) 2- David Fernandez (Alba) Morteza Mansouri, SESAME TAC 2012, Nov.10th,2012 12

13 THANK YOU FOR YOUR ATTENTION Morteza Mansouri, SESAME TAC 2012, Nov.10th,2012 13


Download ppt "SESAME PSS Phase I : Microtron + Booster Morteza Mansouri SESAME PSS engineer on behalf of Safety group TAC 2012 1 Morteza Mansouri, SESAME TAC 2012, Nov.10th,2012."

Similar presentations


Ads by Google