Grid Code What is the Standard Modification Process? Panel

Slides:



Advertisements
Similar presentations
Paulo Manso CDM EB September, 2011 Proceeder for Submission & Approval Standardized Baselines.
Advertisements

Review of industry code governance 26 March 2010.
Environmental Impact Assessment Prepared by: Miss Syazwani Mahmad Puzi School of Bioprocess Engineering UniMAP.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Code Governance Review Initial Proposals Industry Codes and Licensing Ofgem.
Code Governance Review UNC Modification Proposals Chris Shanley - National Grid NTS.
Proposer: insert Panel Date: insert 0XXX: Mod Title: insert title Guidance: These slides are meant to provide a brief overview for the UNC Panel, to introduce.
IRTP Part D PDP WG Items for Review. Items for Review Policy Development Process WG Charter GNSO WG Guidelines.
1 Project Nexus Market Differentiation Workplan Version 0.2 Draft.
Overview of Balancing & Settlement Code Change Process By Gareth Evans on Behalf of Gazprom Marketing & Trading –Retail.
Code Governance Review Major Policy reform Proposals Gas Customer Forum 26 January 2009.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Standing Committee on Improvement Implementation Anne Aikman-Scalese, SCI Chair | ICANN-52 | February 2015.
Code Administrators Working Group (CAWG) Meeting 3, 29th October 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Managing the Costs of New Developments Initial Proposals on Transmission System Operator Internal Costs from 1 st April 2007 Update from National Grid.
1 CCSAS Governance An Overview 2007 Annual Child Support Training Conference and Expo September 18, :30 – 12:00.
#ICANN50 Standing Committee on Improvements Implementation (SCI) Activities Update to the GNSO Council ICANN-50 London Meeting 21 June 2014.
Community Governance Consensus Based Governance RECOMMENDATIONS.
Gemserv1 Release Management Enduring Releases. Release Management  SEC defines Release Management as the process adopted for planning, scheduling and.
DSC Change Committee UK Link Future Releases Proposed Approach
process and procedures for assessments
EIA approval process, Management plan and Monitoring
ccNSO PDP(s) on retirement of ccTLDs and Review mechanism
Presentation to the BSC Panel
DSC Change Governance Review Group
Presentation to the BSC Panel
EU Implementation Programme
Manifest Errors for Entry Capacity Overruns Workgroup 364
Grid Code Development Forum – 6 September 2017
Code Governance Review UNC Modification Proposals
Grid Code Review Panel 16th August 2017
Agenda 5.11 General Regulations
Global Aggregation Mod raised by ESB CS at Mods Meeting 24 ( )
Visual Guide to Governance & Strategy Motions Process
CAP190: Workgroup Report CUSC Modifications Panel, 26th August 2011
Authority decision on CAP086 –Implementation Dates
UNC Trader User – Licence obligations
Electricity Governance Comparison
Code Governance Review UNC Modification Proposals
NTS Entry Charging Review Update
Assignment Workshop 2 16th September 09, Solihull.
Development Modification Proposal 0337: Introduction of a Inter-day Linepack Product – OPEN LETTER Review Group August th November 2010.
CSS Update for CoMC 19th September 2018
Exit Capacity Substitution and Revision
DSC ChMC CSS update 6th July 2018
Code Administration Code of Practice
UNC 0XXX: Mod Title: insert title
The Necessary Criteria for a UNC Modification Proposal
Proposer: Malcolm Montgomery Panel Date: 20/10/16
Rebecca Hailes For 15 March 2018
Proposer: Colette Baldwin – E.ON Panel Date: 21st August 2014
Change Proposals Capture to Delivery
DSC Governance Sub Group Recommendations
Transmission Planning Code Review
Proposer: Transporter /
Richard Fairholme Transmission Workstream 4th September 2008
Modification 0448 – European Driven Change Process Flow Diagram
CUSC “Alternate” Proposal process
Options for the Development of a Demand Side Response Mechanism
CUSC Amendment Panel Recommendation
Proposer: Debbie Brace Panel Date: 20th March 2014
Proposer: Colette Baldwin – E.ON Energy Solutions Ltd
Urgent Modification Process Flow Diagram
DSC ChMC CSS update 12th September 2018
DCUSA PARTY PANEL SECRETARIAT OFGEM CHANGE PROPOSAL SUBMITTED
Project Nexus Workgroup
DSG Governance Group Recommendations.
Validation procedure Nat. Secretariat and MSG
Presentation transcript:

Grid Code What is the Standard Modification Process? Panel (approve timeline and Terms of Reference) Workgroup Phase Workgroup Consultation (at Panel’s discretion) Alternatives to formally be raised at or before this point Workgroup Vote Code Admin Consultation (following Panel approval) Panel Vote Submission to Authority The standard Workgroup Phase timeline is 6 months but there is aan option to request an extension subject to Panel/Ofgem approval. This was an important discussion of the GC0086 Workgroup and the outcome of which was to agree a process and timeline.

Grid Code Standard Modification Key Points A Grid Code Modification Proposal that does not fall within the scope of a Significant Code Review subject to any direction by the Authority, nor meets the Self-Governance Criteria subject to any direction by the Authority. The Panel in conjunction with the Code Administrator will determine the timeline, number of Consultations required and agree terms of reference. At the Workgroup stage parties can raise an alternative modification proposal which has the support of the majority of Workgroup members or the Workgroup Chairperson as better meeting the Grid Code objectives. The Workgroup vote is an informal recommendation for the Panel and will be an element incorporated within the Report submitted to the Panel. If an alternative is suggested, it has to be better than the baseline or better than the proposed solution.

Progression of a Modification Modification Raised Timescales Urgent Modification Initial Written Assessment <1 Month Fast Track Self-Gov. Modification Straight to Report Assessment Procedure 3-4 Months Send Back Report Phase 1-2 Months Self-Gov. Modification With Authority 1-2 Months Decision BSC Change Processes

Assessment Procedure Consultation Used to develop the proposed solution and any alternative (either before or after the Assessment Procedure Consultation) All impacts are identified on: The BSC and CSDs BSC Systems (via Service Provider IAs) Other Industry Codes Participants (via industry consultations and/or IAs) Assessment Report will be produced with Workgroup’s final recommendations and presented to the Panel on behalf of the Workgroup When considering the Assessment Report, the Panel will: Provide its initial views on the Applicable BSC Objectives Make an initial recommendation on whether the Modification should be approved Impact Assessment Assessment Procedure Consultation Assessment Report Workgroup meeting(s) BSC Change Processes

Initial Written Assessment Report Phase Panel’s initial views are consulted on via the Report Phase consultation Panel will consider the responses and make its final recommendation to the Authority Final recommendations are captured in the Final Modification Report and issued for Authority determination Initial Written Assessment Assessment Procedure Report Phase With Authority Normally the final report is checked by Douglas and/or internal expert BSC Change Processes

Modification Procedure without system change BSC Modification Procedure Grid Code Modification Procedure Workgroup meeting(s) Draft Consultation – WG comment Draft WG Report – WG Comment Assessment Procedure Consultation Workgroup Consultation WG Consider Consultation responses Alternate Solutions may no longer be submitted or considered Submit report to Panel Report Phase Consultation Code Admin Consultation Submit Final Report to Panel Final Report submitted to Ofgem for approval by The Authority BSC Change Processes