Presentation is loading. Please wait.

Presentation is loading. Please wait.

Modification 0448 – European Driven Change Process Flow Diagram

Similar presentations


Presentation on theme: "Modification 0448 – European Driven Change Process Flow Diagram"— Presentation transcript:

1 Modification 0448 – European Driven Change Process Flow Diagram
Seán McGoldrick August 15th, 2013.

2 Proposer: Transporter /
Defined as an EU Mod? Note: Modification Proposal Template change required to capture Proposer’s view on EU designation and justification Provide rationale for designation as EU Mod New Modification Proposal raised. Yes Proposer: Transporter / Shipper / Ofgem No Note: EU modification Proposals cannot be subject to the existing Urgent or Self Governance Procedures. Could be considered as related to an SCR and / or a User Pays Modification. Mod considered by Panel UNC Panel Draft Initiate normal Modification Rules Notify Parties of EU / Non-EU designation Mod continues through normal or Ofgem–notified Modification Rules Joint Office Note: EU Mod requirements: 1. Authority may designate Modification as EU 2. Authority may set timetable 3. Authority may designate which Modification Procedure steps are to be followed. 4. EU modifications may not be withdrawn without the Authority’s written permission 5. Authority may revise their position at any time up to Mod being sent to them for decision. Confirm EU Mod to Panel. Specify timetable and procedure to be followed Authority designates as EU Mod? Yes Ofgem Reject EU definition & notify Panel. Normal Modification rules continue to apply No


Download ppt "Modification 0448 – European Driven Change Process Flow Diagram"

Similar presentations


Ads by Google