CMS Area Working Group Meeting

Slides:



Advertisements
Similar presentations
1 S. Lusin, LV Cabling, CERN 06 Apr 06 LV Cabling 06 Apr 06 S. Lusin Fermilab / CERN Cabling from USC to UXC, Power Distribution.
Advertisements

T1 status and plans INFN Genova November 2014 Collaboration Meeting.
Far side Near side -Z End +Z End 5m Wed Dec 7 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability.
Walls crates cables gas chambers electronics CERN adb.
Saverio MINUTOLITIG meeting, 10 February Report on T1 installation activities and achievements made during this shutdown.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
LHCb Upgrade Optical Fibers from Cavern to the Surface - what has been done ? - prototypes status and next coming steps - what is missing for final installation.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
Construction and Installation of the CLIC Experimental Area
19/10/2010 GS-SEM J Osborne N Baddams A Kosmicki EN-CV M Nonis EN-MEF M Gastal PH-CMX A Gaddi H Gerwig A Herve N Siegrist DGS-SC.
Electrical and Optical Cables Installation at P5 What When How H. Breuker
Notes After TIG 17/7/08 HF+ Move out of garage: Aug 15* Platform+table+collars+racks+BP support (jack up for platform) = 3 days Controls for motors = 1.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 12/10/2005 LHCb - Install Meeting 12/10/05 TS/CV/DC Installations STATUS Ongoing works 1.chilled / mixed.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
Experimental Areas Studies Lessons learnt at CMS M Gastal & CMS Technical Coordination (A Ball, W Zeuner)
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Contributions from BE -ABP -ASR -BI -CO DG -RP EN -CV -EL -MEF -STI GS -SEM -ASE IT -CSPH -CMXTE -CRG -EPC -MPE Follow.
March 12 th 2013 Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
MDI Meeting 13 th MDI: Latest news on civil engineering and services First draft concept for the ventilation system in the CLIC experimental area 11/06/2010.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
CALO News Pascal Perret LPC Clermont 22 January 2012.
August 2007Andrea Gaddi, CERN Physics Dept. Detectors Infrastructures & Services Baseline to design detectors infrastructures. Tentative arrangement of.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
ELENA installation progress F. Butin / ELENA collaboration.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
S A Griffiths CM42 June 2015 Electrical & Control.
Demineralised water cooling system
TOTEM Electronics Status
Integration and Services RE3/1 and RE4/1
Cabling for LHCb Upgrade
TC activities.
Technical Coordination Parallel Session November 2011, FNAL
VENTILATION OF AD TARGET Kick off meeting
Integration and Services RE3/1 and RE4/1
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
ELENA installation and commissioning status
Introduction Status before the 2009 run Results from the 2009 run
Helium spill in LHC tunnel
LHC Experimental Vacuum Systems Status October ‘07
Mini-drawers, FE-ASIC , Integrator
EMU Slice Test Run Plan a working document.
Electrical and electronic systems projects
Chamber Design and Integration RE3/1 and RE4/1
A very first look at siting issues
Pierluigi Paolucci - I.N.F.N. Naples
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
CSC Electronics Installation and Commissioning CSCE I&C
OT Survey & Adjustment Outline: Survey technique at present
UK CMS Oversight Committee Mtg
UXC55 ME Muon Endcap On Detector Layout
Prototype cryomodule development
Teleconference ACS – FREIA 19th June 2017
Polarized 3He target installation
CSC Electronics Installation and Commissioning Oct ‘06
CSC Electronics Installation and Commissioning CSCE I&C
19-April-05 CSC ME1/1 Meeting
Needed for Team A on -End
ME I&C -- PC Electronics
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

CMS Area Working Group Meeting CEMESTE/101 : November 1st 2006 Agenda: Key milestones Installation sequence of the cable chains Implication on the starting date of the heavy lowering Installation schedule for the UXC55 racks Installation of TX54 shielding Installation strategy for CMS electronics in USC55 Gas system commissioning schedule 13/12/2006 martin.gastal@cern.ch

Key milestones Ready for crates with cooling in UXC55 X2 level Nov2006 Dec2006 Ready for crates with cooling in UXC55 X2 level 12/12/2006 27/02/2007 HF+1 installed in its garage 14/11/2006 08/12/2006 HF-1 installed in its garage 21/11/2006 08/01/2007 Lower End Cap YE+3 23/11/2006 30/11/2006 Lower YB+2 20/12/2006 19/01/2007 Lower YB0 05/02/2007 23/02/2007 Start pre-cabling of TK 15/03/2007 27/03/2007 Lower cold box 12/01/2007 27/02/2007 13/12/2006 martin.gastal@cern.ch

Cable chains installation schedule 13/12/2006 martin.gastal@cern.ch

Connectors installation TS-EL + TS-LEA 13/12/2006 martin.gastal@cern.ch

YE+1 will be connected as soon As forward vacuum pipe is installed 13/12/2006 martin.gastal@cern.ch

Coordination needed for installation of: Cables, fibres, cooling & gas pipes  Close collaboration PH TS  WPA meeting  Feedback mechanism 13/12/2006 martin.gastal@cern.ch

Cable installation scheme WP definition Database management : S Bally Cables definition Delivery status WP insertion in Schedule: M Gastal WPA meeting Safety OK Start date Work supervision: M. Wensveen CC coordination meeting + TECOPA for reporting Reporting Progress monitoring And TS support: N Dos Santos WPs have to be defined so that they follow the work sequence: to be done by Wolfram and Stephane Database update 13/12/2006 martin.gastal@cern.ch

HF-1: A warm up Complexity: 13 actors WP identification and assignment of responsible is crucial 13/12/2006 martin.gastal@cern.ch

Fibre optics and water mist To be done in // with mini cable chain 13/12/2006 martin.gastal@cern.ch

Should services installation in cable chains Only resume once YB0 lowered? 13/12/2006 martin.gastal@cern.ch

UXC55: Racks installation 2 more electrical hoists have to be purchased R Marie contacted 13/12/2006 martin.gastal@cern.ch

UXC55: Racks installation – Near side TS-CV-DC: Connect TK C6F14 units to BRINE Start 27/11 for 2 weeks DATE 9 weeks of commissioning 13/12/2006 martin.gastal@cern.ch

UXC55: Racks installation – Near side PH-CMI: Install racks side panels Start 11/12 for 1 week Status? 13/12/2006 martin.gastal@cern.ch

UXC55: Racks installation – Near side TS-CV: Install ECAL cooling plant 11/01 COSMI Position of YEs+ in UXC55 has to be compatible 13/12/2006 martin.gastal@cern.ch

Will the ECAL cooling plant be delivered? Thursday 11 January 2006 VSL: Prepare lifting tools for YB+2 Open Plug PM Will the ECAL cooling plant be delivered? CMS YE+1 Far side Near side YB+2 TS-CV ECAL cooling plant TS-LEA TS-IC TS-EL TS-CE HF+1 HF-1 Russian crew Pre-align support YE+3 YE+2 Move YE+1 Move YE+1 Fibres ECAL cooling plant Nacelle YB+1 YB-1 YB-2 YE-1 13/12/2006 martin.gastal@cern.ch

With YE+1 already in cavern All other racks have been installed UXC55 Racks: X2 Near Side To be installed on ~11/01 With YE+1 already in cavern All other racks have been installed 13/12/2006 martin.gastal@cern.ch

CMS installation schedule until LHC start-up +Z YB0 Start of installation sequence for cables in YB0 +Z side 13/12/2006 martin.gastal@cern.ch

CMS installation schedule until LHC start-up Major scheduling efforts to consolidate plans from TK, ECAL and HCAL On going activity 13/12/2006 martin.gastal@cern.ch

Install access platforms and scaffold +Z HB+ (ECAL) will be completed after TK cabling is complete 13/12/2006 martin.gastal@cern.ch Design by CMS Integration group, April 2005.

CMS installation schedule until LHC start-up Kick off of services installation on YB0 -Z 13/12/2006 martin.gastal@cern.ch

Move HB- inside vacuum tank 13/12/2006 martin.gastal@cern.ch Design by CMS Integration group, April 2005.

USC55 : TX54 shielding 13/12/2006 martin.gastal@cern.ch

USC55 : TX54 shielding Delivery from Pakistan: 05/03/2007 13/12/2006 martin.gastal@cern.ch

USC55 : Control Area – CMS Electronics S2 (-1) 13/12/2006 martin.gastal@cern.ch

Priority for turbines Follow-up on Friday 10 November meeting : List of racks to be connected with UPS supported power has been released by A Gaddi TS-EL to install new switchboard once TC agreed 13/12/2006 martin.gastal@cern.ch

USC55 : Control Area – CMS Electronics S1 (-2) 13/12/2006 martin.gastal@cern.ch

Rows B,C,F and G to be equipped with turbines this week Priority rows Rows B,C,F and G to be equipped with turbines this week 13/12/2006 martin.gastal@cern.ch

USC55 : CMS Electronics –Temporary Ctrl room Partition walls erected from 14/12 onwards – TS-IC 13/12/2006 martin.gastal@cern.ch

Safety barriers around head shaft Designed. Call for tender to be organised. Cost not included in the original budget for metallic structures PM54 13/12/2006 martin.gastal@cern.ch

First steps towards commissioning Initial goals: Back end commissioning: Install and commission FED crates Sub detectors: HCAL, HF, CSC on YEs+Z Triggers: DSS, DCS ready in ctrl area FED crates installed and commissioned Target date for kick off: end January Perform back end connection to DAQ FED crates installed and locally commissioned Target date: February 13/12/2006 martin.gastal@cern.ch

First steps towards commissioning Initial goals: Back end commissioning: Perform back end connection to Level 1 trigger Sub detectors: HCAL, HF Triggers: FED and VME crates installed and commissioned HCAL cables available Target date for kick off: February Front end Commission HFs All HF cables connected to HF (last meter) All TS cables connected to HF(LV + Turbines + Gas) 13/12/2006 martin.gastal@cern.ch

First steps towards commissioning Initial goals: Front end Commission YEs+Z Triggers: Cooling pipes connected Gas pipes connected Mini cable chains connected LV on top of bypass operational (TS-EL:~Mars) DSS/DCS operational for detectors (in UXC55) Wiener LV power supply delivered Beginning of scheduling exercise, will be an iterative process 13/12/2006 martin.gastal@cern.ch

Review of Installation Sequence in the Forward Region 3 Activities will take place in the same area Beam pipe installation RS completion Motorized opening system for RS Possibly repairs on Low-Beta magnets 13/12/2006 martin.gastal@cern.ch

Beam Pipe installation Phase 1 – Forward +Z 13/12/2006 martin.gastal@cern.ch

Ideal configuration of the cavern to perform this operation 13/12/2006 martin.gastal@cern.ch Design by CMS Integration group, April 2005.

Thursday 14 December 2006 Position of YE+3 critical for survey AM PM CMS YE+1 Far side Near side YB+2 TS-CV Racks infra S2 TS-LEA TS-IC Connectors TS-EL TS-CE HF+1 Move HF Out of Garage HF-1 Russian crew Move YE+3 Move YE+3 TAS config Move YE+3 Move YE+2 Move YE+2 Fibres Connectors Could we install the rails? Racks infra S2 YB+1 YB-1 YB-2 YE-1 13/12/2006 martin.gastal@cern.ch

Complete RS 54 13/12/2006 martin.gastal@cern.ch

Install motorised opening system for RS54 Could it be done in // with “install platform on top of blockhouse”? What is the impact of “Repair Low-Beta magnets”? 13/12/2006 martin.gastal@cern.ch