NA62 RICH ELECTRONICS LOGISTIC Part 2 R. Ciaranfi 25/05/2011.

Slides:



Advertisements
Similar presentations
Flavio Dal Corso - INFN Padova1 OPERA coll. meeting - Hamburg 3 July 2004 RPC & XPC Electronics Status Front End Boards (FEBs) Controllers HV system Crates.
Advertisements

AMS - ECAL Feb 17 th, 2003 Page 1 M. Incagli - INFN Pisa Part III cabling Part III cabling + weight S. Di Falco, M. Incagli, F. Pilo, F. Spinella, G. Venanzoni.
R.Ciaranfi 25/05/ NA62 CUSTOM PMT SOCKET FOR R7400 TUBE R. Ciaranfi.
July 10, 2008 PHENIX RPC review C.Y. Chi 1 RPC Front End Electronics On chamber discriminator  The strips  The CMS discriminator chips  The discriminator.
RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
Requirements to RICH FEE Serguei Sadovsky IHEP, Protvino CBM meeting GSI, 10 March 2005.
FT Integration Raffaella De Vita INFN – Genova Jefferson Lab 10/15/2013.
1 M. Bonesini - CM 25 RAL 5/11/09 PID status report M. Bonesini Sezione INFN Milano Bicocca.
E. Norbeck U. IowaFast Gas Detector APR 05 Tampa1 Small Fast Gas Detector for High-Energy Electrons E. Norbeck, J.E. Olson, and Y. Onel University of Iowa.
December 3, 20031Muon Integration Meeting B. Schmidt Introduction: The present architecture of the Muon System is based on the assumption that the maximal.
EDMS Nr /02/ tons, Platform – Q = daN, aprox. length to cover 4 m Cabling Groove – Q = 500 daN, aprox.
NA62 GigaTracKer Working Group meeting Integration and GTK-carrier PCB design April 9, 2013 Michel Morel.
Tray Factory Considerations Jean-Francois Genat UC LAPD Collaboration Meeting, June th 2010, Argonne. 1.
RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Gif++ CR tracker setup G. Aielli for the RPC collaboration.
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Muon System PMT Cable Routing Kirk McDonald Princeton University (July 28, 2007)
Itzhak Tserruya, BNL, Aug. 11, Itzhak Tserruya Weizmann Institute, Israel BNL, Upgrades Meeting, Aug. 11, 2004 HBD: Infrastructure and Integration.
The point is a square with a side length 1 yocto (the yocto is the smallest unit of measurement and it is equal to 10^-24 meter)
Doug, here are some slides. FGT Electrical Integration ethernet trig/clk DDL fiber Wiener MPOD controller ISEG 8 ch HV -4 2 mA ARC module (APV Readout.
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
Argontube Detector design Laffranchi Marco, Meregaglia Anselmo, Messina Marcello, Rubbia Andre’ Bern,
1/12/2010 R. CIARANFI 1 NEW NINO BOARD FOR RICH OLD AND NEW LOGISTIC NEW BOARD DESCRIPTION NEW MODULARITY 32 CH NEW FORM FACTOR FRONT END AREA AND DAQ.
Mensuration Objective Perimeter and area of shapes made from triangles and rectangles.
VLVnT11 - Erlangen 12-14/10/ Giorgio Cacopardo NEMO Phase2 mechanical design G. Cacopardo on behalf of NEMO collaboration.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
Services in GIF++ A pictorial record of the work HV Cables LV cables DCS cables Signal Cables Ian Crotty 17 Dec 2014.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
Circles Shape and Space. Formula for the area of a circle We can find the area of a circle using the formula radius Area of a circle = πr 2 Area of a.
V. Bobillier1 Cable installation status.
Area & Perimeter An Introduction. AREA The amount of space inside a 2-dimensional object. Measured in square units cm 2, m 2, mm 2 Example: 1 cm 2 cm.
≈450 mm 50 x 220 mm 2 ≈450 mm 50 x 220 mm 2 Electronics boards Size: 50 x 220 mm 8 VMM chips à 64 ch Total: 512 ch/board Zebra contact Arrangement of electronics.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
Year 7: Length and Area Perimeter The perimeter of a shape is the total distance around the edge of a shape. Perimeter is measured in cm A regular shape.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
Single Phase ProtoDUNE TPC CERN The SP TPC Team Jan. 13, 2016.
RICH Readout Plans F. Bucci, M. Piccini on behalf of the RICH WG.
LIDO Meeting - Catania 13/01/ Giorgio Cacopardo Arrangement of PCB in LIDO E-POd.
10 mm is the same as... 1 cm. 20 mm is the same as... 2 cm.
Miscellaneous MEC Topics Mainz, CM September 2016, MEC Session J
Beam Dump Hall Volume Beam Dump Meeting at SLAC May S.Ban
Update on ‘Real estate’ for Level-0
Perimeter.
PMT cabling Gian Luca Raselli INFN Pavia
Sphere Option for Helical spring CF16 Bellows Adjustment bolts (horizontal plane) CF38.
SHMS "pivot-patch" cable run Experiments: NPS, LAD(?), CGEN(?)
Radiation-safe area for electronics, or laser or
Front-end electronic system for large area photomultipliers readout
Pierluigi Paolucci - I.N.F.N. Naples
Pierluigi Paolucci - I.N.F.N. Naples
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
Area of a Composite Calculate the area of this shape Total Area =
Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE.
Dr. Pierluigi Paolucci - INFN di Napoli
and their missing lengths
UXC55 ME Muon Endcap On Detector Layout
Area of a rectangle Tuesday, 05 February 2019 Definition:
RPC Front End Electronics
RPC FEE The discriminator boards TDC boards Cost schedule.
RPC Electronics Overall system diagram Current status At detector
Digitally subtracted pulse between
Area Of Composite Shapes
Dr. Pierluigi Paolucci - INFN di Napoli
Beam Beam electronics Block diagram disc gated disc gate disc gated
Perimeters of Polygons
Similar triangles: Missing sides with other triangles
Presentation transcript:

NA62 RICH ELECTRONICS LOGISTIC Part 2 R. Ciaranfi 25/05/2011

OUTLINE RACK COMPOSITION JURA SIDE MOCKUP CABLE LENGTH (SIG+HV) OPERATING SPACE SLOW CONTROL 25/05/2011

RACK COMPOSITION 43U rack 21 POSITIONS H=213 cm 9U BIN HV SIG 16 X 32 CH HV FILTER SIG 16 X 32 CH FE_DAQ SLOW CNTRL GATEWAY 11U crate 3U AIR gap SIG 16 X 32 CH FE_DAQ SLOW CNTRL GATEWAY 11U crate HV 16 X 32 CH HV FILTER 9U BIN 43U TOTAL HEIGTH 25/05/2011

JURA MOCKUP 25/05/2011 VESSEL TANGENT PLANE 50 CM FROM FLOOR DSCN6517.JPG Na62_td.pdf PIPE_LAYOUT_POSITIONS.PDF VESSEL TANGENT PLANE 50 CM FROM FLOOR 25/05/2011

CABLE SUPPORT 2M OF RG174 = 32g 1000 CABLES = 32kg 2m COAX 3m HV MOBILE VERTICAL SUPPORT 10U shaped support each contains 96 cable 10 cm 7 cm diameter S=38 cm2 100 cm 2m COAX 3m HV RG174 + HV Cable diameter=(1.23+2.8) mm Scable=0.13 cm2 Stot=96*0.13= 13cm2 S/Stot= 2.9 25/05/2011

OPERATING SPACE WE NEED A PLATFORM TO OPERATE NEAR THE PMT FLANGE AND CRATE 50 cm DSCN6524.JPG 180 cm FROM CONCRETE FLOOR DSCN6527.JPG 130 cm FROM CONCRETE FLOOR 25/05/2011

PMT FLANGE MOVING OVERHEAD CRANE 25/05/2011 PMT Flange Flange cap DSCN6530.JPG DSCN6533.JPG DSCN6534.JPG PMT Flange Flange cap PMT Flange CABLE SUPPORT 25/05/2011

SLOW CONTROL INFN Fi HV SIG CAN DEVELOPMENT BOARD DSCN6540.JPG JURA AND SALEEVE RACK COMPOSITION CAN/TCPIP GATEWAY TO INTERNAL I2C NETWORK HV SIG I2C DAC AND ADC TO CONTROLL NINO PARAMETERS CANking_00.bmp INFN Fi WRITE AND READ ON CAN BUS 25/05/2011