Building 107 Update Introduction Project team Location Design status

Slides:



Advertisements
Similar presentations
July 2003 Structure of Electricity Distribution Charges Update and Proposals Martin Crouch Director, Distribution.
Advertisements

Generation Business Line
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
Status Report on the TSR building (and Infrastructure) Isolde workshop CERN, 27/28 April 2015 Isolde Erwin Siesling.
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
DO-29161/EN Provision of Engineering Services in Heating, Ventilation and Air Conditioning for Building 107 Project R. Bozzi, M. Nonis / EN-CV.
MPE Workshop 14/12/2010 Building 107- project Raphaël Berberat
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Lamma Power Station Solar Power System. 2 Content Project Background Site Selection Amorphous Silicon Thin Film Photovoltaic System Environmental Benefits.
1 Broken Hill Solar Plant Community Information Session 1 July 2015.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
112/09/2013. Summary  Events on the network  Incidents  Network reconfigurations  Network operation  Update on activities  Tests  Projects and.
SOLAR PARK – ROMANIA Photovoltaic Project Stage : Ready to Build 6,174 MWp November 2013 EXPERT GROUP CONSULTING.
Bulding 245 schedule update LIU Booster Meeting Fulvio Boattini & Michel Obrecht TE-EPC / EN-CV TEEPC.
1 29 June 2011EDMS CERN Greenhouse Gas Inventory – Detector Cooling 1.Background; 2.Status on regulatory requirements; 3.Inventory carried out.
6th ST workshop, Thoiry, 1-3 April ST-HM Design Section Strategy and working methods 3rd April 2003 C. Bertone ST-HM.
Budget specification EHN1 Extension: Infrastructure (WG2) Mats Wilhelmsson 17 September 2015.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
TECHNICAL INSTALLATION RADWG - 2 APRIL /03/20091J.Lendaro EN/STI/ECE.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Building 867 Project TE/MPE workshop status and schedule Presented by Tony Fowler, TE-ABT on behalf of the Project Team 28/09/2010Building 867 Project:
Engineering Department ENEN ENEN IT4070/EN/LHC Design, Supply, Installation, Testing and Commissioning of an HVAC Systems the for SR8 Facility Bidder’s.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
Update on the Laser Beam Line
The Building 180 Cryogenic infrastructure water cooling system Stefano Moccia, EN-CV Coordination meeting 26/09/14.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
J. Pedersen, ST/EL Consolidation of the CERN technical infrastructure and civil engineering. J. Pedersen ST 6 th ST workshop, Thoiry, 1 – 3 April 2003.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
CENF CIVIL ENGINEERING : - DESIGN TENDER AND ESTIMATED COSTS John Osborne GS/SE 19 July 2013.
ISOLDE: Status report building th ISCC meeting CERN, 24 June 2014 Erwin Siesling, Magda Kowalska.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
CENF CIVIL ENGINEERING UPDATE : - SITE INVESTIGATION - CALL FOR TENDER FOR DESIGN & CONTRACT ADMINISTRATION SERVICES - 3D VISUALS FOR SURFACE STRUCTURES.
CENF CIVIL ENGINEERING UPDATE : - SITE INVESTIGATION - CALL FOR TENDER FOR DESIGN & CONTRACT ADMINISTRATION SERVICES John Osborne GS/SE 16 May 2013.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
IT-4135/EN Supply of Air Handling Units for Industrial HVAC Projects at CERN Technical Specification Paul Pepinster / EN-CV.
Introduction. Apple and Environment Climate Change. Materials Efficiency. Energy Efficiency. Packaging Main factors that affect the environment Recycling.
The Next Generation of a Gamma Irradiation Facility GIF++
Demineralised water cooling system
Minimum Set of Requirements for Suppliers
POWERSYSTEMS 1977: Powersystems UK started up to provide services that only the local electricity board could provide at the time. We became the first.
Installation of the T600 at Fermilab
The Design Team Carl James.
Minimum Set of Requirements for Suppliers
Renewables: Moy Wind Farm
CERN Mobile network migration
SMB Service Status 117th ACCU Meeting
Architecture, Interior and Project management consultant
CERN Data Centre ‘Building 513 on the Meyrin Site’
A few ideas about detector grounding and shielding D. Breton
CE Status: Activities executed until 03/08 and ongoing
East Area Renovation Project team #6 Launch safety agreement
RWTCS Steering Commitee
Photovoltaic Systems Engineering Session 19
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
Bidder’s conference – 21st May 2013
Mauro Morandin & Antoine Daël
Pre-Contract Cost Control
Business opportunities related to CERN electrical network
CMS Goal of the experiment
Pierluigi Paolucci - I.N.F.N. Naples
Conformity Assessment in the Public Procurement of Accessible ICT
Photovoltaic Systems Engineering Session 12
Infor EAM in the Handling Engineering Group at CERN
Mostafa El-Asiry Nuclear Power Plants Authority (NPPA), Cairo, Egypt
East Hall under construction
ILO Industrial Opportunities Days, 6-7 June 2019
Presentation transcript:

Building 107 Update Introduction Project team Location Design status N. KOS for the 107 project team Introduction Project team Location Design status Planning

CERN team for building 107 Betty Magnin TE/MPE Future user Rui de Oliveira TE/MPE Future user Leonel Ferreira TE/VSC Future user Marina Malabaila TE/VSC Future user Cristiana Colloca DGS/SEE Safety link person Juan Gomez EN/EL Electrical expert Michel Obrecht EN/CV HVAC expert (Heating, Ventilation, Air-Cond.) James Vernal GS/SE Civil eng. expert, deputy project leader Pierre Strubin TE/HDO Project leader (until September 2011) Nico Kos TE/VSC Project leader (from September 2011)

Location on the Meyrin site Existing building 174 will be demolished during the first months of 2012

Aerial view of 107 TE-MPE (printed circuit boards, electronic modules) TE-VSC (surface finishing) >> further detail from Leonel

Design Status Design started in April 2011 and is carried out in 3 phases by an external consultant (Royal Haskoning) on contract S147/TE: Phase 1 - Preliminary design, indicating the main design choices, has been completed. Phase 2 - Tender design, with sufficient detail to tender for the construction contract, is ongoing and should be finished by February 2012. Phase 3 – Construction design, with all required detail for the construction, will be finished by early April 2012. Royal Haskoning will subsequently supervise the construction of the building from July 2012 until November 2013.

Design novelties Parking on the roof to partially compensate the loss of parking places. Electrical transformer on the roof to reduce the footprint of the building (and for aesthetic reasons). Not a novelty at CERN but worth mentioning: Part of the roof surface is pre-equipped with anchoring points for solar panels (on the request of CERN’s Mr. Energy, H. Burckhart).

Design issues As a general rule, CERN applies the most stringent of Swiss and French legislation. (e.g. emissions to conform to a mix of French and Swiss values) Consultant has difficulty with the large amount of rules and regulations CERN supplies and installs certain items

CERN supplied items Supplied and installed by contractor (following negotiation with the concerned CERN services): Lift IT cabling Supplied and installed by CERN: Electrical transformers and HV connection to 15 kV sub-station Overhead cranes Fire detectors Fiberoptic cable and star points Programming of HVAC PLC’s

HVAC impression Separate extraction systems: - acid/alkaline/chrome - cyanide - solvents - ozone

Planning Based on discussions with all potential general contracting firms (6) and sub-contractors for the surface finishing equipment (2), the completion on 30 November 2013 seems feasible.

Construction site July 2012 until November 2013

Conclusion Design is subject to very stringent legislation (CERN+CH+FR). Invitation to tender for construction in February 2012. A number of general contractors (6) and sub-contractors for the surface finishing equipment (2) have been qualified for the invitation to tender. Construction is scheduled to start in July 2012. Completion on 30 November 2013 appears feasible.