CENF – Personnel Protection System Preliminary Study

Slides:



Advertisements
Similar presentations
Radiation Protection aspects of the Switch-Yard operation V. Donate, G. Dumont, Joachim Vollaire on behalf of DGS-RP.
Advertisements

Commissioning the access system M. Gruwé Machine checkout workshop November 8 th 2007.
13 Oct 2005 ICALEPCS RAMSES: The LHC RAdiation Monitoring System for the Environment and Safety G. Segura CERN on behalf of the RAMSES team.
MEF - Machines & Experimental Facilities Technical Stop #4 29 th August - 2 nd September 2011 Summary Julie Coupard Schedule and Coordination LHC-TS4 -
T. Bajd, M. Mihelj, J. Lenarčič, A. Stanovnik, M. Munih, Robotics, Springer, 2010 SAFETY IN INDUSTRIAL ROBOTICS R. Kamnik, T. Bajd and M. Mihelj.
Tomasz Ladzinski GS/ASE. LASS Annual Maintenance & Tests General Principles Each winter shutdown preventive maintenance of EIS takes place. It is followed.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
GIF++ ACCESS SYSTEM Dorothea Pfeiffer GIF++ Project Meeting Thanks to: V. Martins De Sousa Dos Rios, D. Vaxelaire, D. Haasler.
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
SESAME PSS Phase I : Microtron + Booster Morteza Mansouri SESAME PSS engineer on behalf of Safety group TAC Morteza Mansouri, SESAME TAC 2012, Nov.10th,2012.
REPORT VISIT SAPHYMO Dorothea Pfeiffer GIF++ Project Meeting
CLIC CES Webex 12 Nov Summary: – Set of fire safety measures defined in CERN Safety Report – Proposed Structure for CLIC/ILC Fire Safety Report Fabio.
Asher Etkin DOE Accelerator Safety Workshop August , 2009 DRAFT DOE STANDARD APPLICATION OF SAFETY INSTRUMENTED SYSTEMS USED AT DOE NON-REACTOR.
Radiation Protection LS1 - Collaboration with CERN Technical Groups - Lessons learnt Stephane Bally (CERN), Sandro Di Vincenzo (CERN) Indico
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Joint ILC/CLIC Safety document ► Incentive for this document:  Share effort to define a coherent safety protocol for future linear colliders.  Insure.
128 May 2013 CENF Near Far Integration For the Safety Folder + Environmental impact Study Simple process: Identify Safety issues >> description >> risk.
LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.
How to achieve satisfactory performance of the access system: stability, efficiency, operation, fluidity Timo Hakulinen (GS/ASE) Thanks: LHC access team.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
TS Workshop, Archamps, May 24 – May 26, 2005 The LHC Access System Status report – May 2005 P. Ninin & the Access project team TS/CSE.
LHC ACCESS SYSTEM 1 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: Access Control and Safety System for the LHC Experiments P. Ninin L. Scibile.
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
LHC ACCESS SYSTEM 1 Authors: P, Ninin, L. Scibile T, Ladzinski EDMS: The LHC Access System Where do we stand ? P. Ninin, T. Ladzinski, L. Scibile,
TS Workshop, Archamps 4 May 2004 SAFETY AND ACCESS CONTROL Where do we stand ? P. Ninin & the Access project team TS/CSE,
Purpose NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects LIU-SPS external beam dump meeting - C. Colloca DGS/SEE LSA conventional.
Access System – LASS/LACS L. Ponce On behalf of the OP team.
James C. Liu 1 and Lawrence S. Walker 2 1. SLAC National Accelerator Laboratory, CA, USA 2. Brookhaven National Laboratory, NY, USA 1. Introduction ANSI.
LHC ACCESS SYSTEM 1 EDMS: January 2008 Global Tests of the LHC Access system Outcome P. Ninin, T. Petterson, S Grau, T. Ladzinski 18 th January.
Horst Breuker ADUC Jan Safety and Radio Protection, Consequences for the Experiments ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive,
Access system global tests M. Gruwé LHCCWG January 15 th 2007.
Radiation Protection computing tools Gérald Dumont HSE/RP.
External Data and DIP Oliver Holme 18 th January 2008.
Status of GIF++ Adrian Fabich, Dorothea Pfeiffer, EN-MEF-LE EATM, 27th August 2013.
H I R AD M AT SAFETY PREPARATION Follow-up meeting 14/07/2011.
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
GIF completion status Adrian Fabich, EN-MEF-LE on behalf of the GIF project team GIF users meeting, 14 th January 2015.
1 Interfaces, Engineering and Standards. 2 Interfaces LoKI Interface document description for deliverables Elements: PBS number, Deliverable description,
GIF++ implementation Adrian Fabich, Sylvain Girod, EN-MEF-LE Technical meeting with Supplier of Irradiator, 3 rd October 2013.
SuperB Experimental hall General considerations on the Babar experimental area Preliminary space requirements hall proposal. A floor plan. Specification.
A summary of the SPES Safety Technical Advisory Committee SSTAC Richard Catherall ISOLDE Technical Coordinator 5 th December 2014 INFN, Legnaro.
Linac4-PSB 160 MeV connection readiness review Tuesday 30 August August 2016 Linac4-PSB 160 MeV connection readiness review 2.
(Access system for HWC)
SPS Personnel Protection System Renovation Project
Software Specification and Software Reuse - BELLA LPA experiment
Safety and Prevention of Typical Fire Plan
MEDICIS Safety Alarms Systems
PERSONAL SAFETY INTERLOCKS External EHS Expert Panel Workshop
Software Specification and Configuration Management
CENF – Personnel Protection System Preliminary Study
HEL – Safety aspects Christelle Gaignant
LAAWG Status Report – 15th May 2007
BE-ICS activities for LIU Project
Julie Coupard Schedule and Coordination
Quality Assurance applied to Accelerator Safety
Safety and Radiation Protection for ThomX
EYETS 2016/2017 Activities SPS Access system Maintenance and Evolutions Access system EYETS 2016/2017 EDMS:
Workshop on Accelerator Operations
Assumption for a given sector
Provide Job Coverage for Radiography RP03.09
Personnel Safety Systems
TS2 PSS Architecture, Concepts of Operations and Interfaces
PSS0 Design & Concept of Operations
PSS verification and validation
Safety Analysis and Safety Functions
Radiation Protection Handbook
TS2 PSS; update on concepts of operation and system's architecture
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Access Control for CERN Experimental Areas
Presentation transcript:

CENF – Personnel Protection System Preliminary Study 01/August/2013 CENF - SBWG Meeting. F. Valentini (GS/ASE) edms xxxxxx

Topics CENF Important Safety Elements Presentation. CENF Sectorization Proposal. PPS - Next Development Tasks. Conclusions. edms xxxxxx edms 1208027

CENF - Important Safety Elements Presentation Access Point Concept edms xxxxxx

CENF - Important Safety Elements Presentation Personnel Access Device (PAD) Main Features: Rigid Mono-block frame. Exclusive door opening control. Unique human presence detection. Low maintenance required. External Badge Reader Internal Biometric Eye Scan Safety Key Distributor Video Surveillance Antifraud Detection System Emergency Unlock Key HMI – Zone Access Conditions Mini – Material Access Device edms xxxxxx

CENF - Important Safety Elements Presentation Material Access Device (MAD) Main Features: Easy dismounting/transportation. Exclusive door opening control. Human presence recognition. Low maintenance required. External Emergency Handle Intern Emergency Exit Internal Video Surveillance Emergency Unlock Key Human Presence Recognition System edms xxxxxx

CENF - Important Safety Elements Presentation Sector Door Escape Door edms xxxxxx

CENF - Important Safety Elements Presentation EMERGENCY STOP BUTTON Stop Beam Mode Prevent Activation of Beam Mode RADIATION MONITORS Stop Beam Mode Prevent Activation of Beam Mode EVACUATION SIRENS Alert for imminent activation of Beam Mode Alert for Evacuation is any danger appears PATROL BOXES Set the Safety conditions for Beam operations edms xxxxxx

CENF – Sectorization Proposal POINT 1 – Surface Building Access Point: PAD Mini-MAD MAD Escape Door Material Door: Not Controlled Material Door: Not Controlled Shielding Block: Interlocked ZONE CLASSIFICATION: Controlled Area Shielding Block: Interlocked Access Point: PAD Mini-MAD Key Distributor Escape Door Shielding Block: Interlocked Escape Door: Controlled S1

CENF – Sectorization Proposal POINT 1 – Underground Building Sector Door: Interlocked S3 ZONE CLASSIFICATION: Interlocked Area Sector Door: Interlocked S2 S1

CENF – Sectorization Proposal POINT 2 – Surface / Underground Building Sector Door: Interlocked S3 Sector Door: Interlocked Shielding Block: Interlocked ZONE CLASSIFICATION: Interlocked Area S2 S1 S3 Access Point: PAD Mini-MAD Key Distributor Escape Door

PPS - Next Development Tasks Risk Analysis Documentation Definition of all PPS protection barriers. Definition of risks other than radiological. Safety Integrity Level (SIL) Allocation. Definition of all Important Safety Elements (EIS_f/m) to interlock. Finalization of the CENF Sectorization. Formalization of all Instrumented Safety Functions of the System Clearly define the PPS functionalities / scope. Definition of the final Safety Validation Plan. PPS Final Technical Specification Definition of system architecture. Choose of all HW/SW components. edms xxxxxx

Conclusions MAIN OPENED POINTS: Confirmation of the role of the Ventilation System (CV). Confirmation of the radiological classification of the different areas (RP). Listing of all CENF areas accessible by the personnel (ex. Tunnel areas). Operation of the Access/Safety System (Local Control Room / SPS) edms xxxxxx