BA6 – crab cavity activities in EYETS

Slides:



Advertisements
Similar presentations
Backwards Compatibility L4 – L2 W. Weterings LBCC - 14.
Advertisements

MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
A. Perin, CERN, TE-CRG, 26 May Review of the cryogenic by-pass for the LHC DS collimators 26 May 2011 Modifications to the DFBs, DSLC and cryogenic.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
FP 420 Connection Cryostat Design and Integration Keith Potter, Jaak Lippmaa, Guido Ryckwaert, Benoit Florin, Thierry Renaglia, Thierry Colombet, Shrikant.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
TE-CRG Activities D. Delikaris, TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 30/08/2013LSC - S. Baird, M. Bernardini1.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
ACS news RF cabling campaign: DONE Final tests cavity tuning motor (ctrl): in progress recabling software upgrade Water cooling: ADT static pressure test:
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
BA6 newsRF power Cable list being worked out. BA6 newsLLRF Cable list done, pending check and confirmation.
Crab cavity test installation in SPS
Bruno Vullierme Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 1 CRAB CAVITY INTEGRATION CRYOGENICS INSTALLATION.
Workshop on cryogenic & vacuum sectorisation of the SPL Vacuum Sectorisation Paul Cruikshank, CERN Technology Department (TE) Vacuum Surfaces & Coatings.
Work in the Tevatron A0 D0 B0 C0 E0 F0 Separators A49 Separator B48 TEL 2 installation A0 Xtal Collimator 1.5 m collimator A48 Shimming 6 magnets/day At.
Cryogenics and cryolines – Crab Cavities for HiLumi LHC Crab Cavity review November 2015 CERN – Geneva, Switzerland K. Brodzinski, L. Delprat and.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Neutrino Platform Proximity Cryogenics 59th EHN1 Cryogenics Integration Redouan Abdennour, Johan Bremer, Michel Chalifour, Joaquim Creus, Aurelien Diaz,
Report Technical Director Storage-Ring-Installation Completed
TE-CRG Activities A. Perin, on behalf on the Cryogenics Group.
Teleconf ACS – FREIA 28th March 2017
Teleconference ACS – FREIA 31th May 2017
CC LLRF SM18 test plan and BA6 infrastructure
Linac4-PSB 160 MeV connection readiness review
Cryogenics storage and distribution
Cryomodule test stand at ESS site
He Plant, LN2 Systems and Commissioing
SM18 RF M7 Bunker Project Status 14th July 2017
Crab cavities Cryogenics progress for the SPS
SPS Crab Cavity Test Stand: Safety review summary
Schedule CM SPS G.Vandoni.
IT-4189 Supply and installation of a cryogenic distribution system
EYETS LHC 2016/2017 Works EN/EL/CF
Activités SPS pour BE/ICS Systèmes d’Alarmes YETS
K. Foraz on behalf of OSS members
SPS - EYETS 2016/17 Vacuum systems planning
EN-EL-FC Activity Jeremy Blanc, EN-EL-FC.
on behalf of the RF group
SPS cryogenic proximity equipment and SM18 validation
Long Shutdown for the LHC: Vacuum Beam Pipes
FCC Tunnel and Shaft Cross Sections
Coordination of Hardware Commissioning
Crab Cavities Activities
Keeping LHC cold during LS periods Preliminary proposal
Hollow e- lens, Cryogenic aspects
EN-HE SPS works during EYETS
SPS EN-CV Planning LS (initial draft)
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
SPS CC: Final plan for interlocking of crab cavities in SPS
XFEL Vacuum System Commissioning
Status of the cryogenic system for B180
UK RFD Pre-Series cryomodule
K. Foraz on behalf of OSS members
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
ACS news Circulator TCU: control tests in progress All cavity racks
Coldex disinstallation
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 23/01/2019.
EN-HE SPS during LS2 J-L GRENARD on behalf of EN-HE 23/1/2019.
Summary post TCC#54_02Aug’18
SPS Planning meeting for LS2 #25 Vacuum sectors status
Presentation transcript:

BA6 – crab cavity activities in EYETS G.Vandoni

System architecture in SPS BA6 – surface area RF power amplifiers IOT Warm Cryogenics Racks, utilities PA6 - shaft RF power coaxials Warm Cryo pipework Cables TA6 – alcove & access tunnel Cryo distribution line CC SPS test stand See next slide Cold-box & Valve box New handling equipment

Crab cavity SPS test stand Helium pumps Valve-box2 Service module RF power, loads & circulators Vacuum sectorization valve Vacuum sectorization valve Y-chamber Transfer table Transport lane Cryo-module All this, after YETS2018. Y-chamber

Objectives of EYETS BA6 – surface area PA6 - shaft Supports for heavy stuff Warm Cryo pipework Cables RF power coaxials PA6 - shaft RF power coaxials Warm Cryo pipework Cables TA6 – alcove & access tunnel Cryo distribution line CC SPS test stand Cables New vacuum sector RF power coaxials Cryo distribution line Cables New handling equipment Floor preparation RF power coaxials New handling equipment

Co-activity

Co-activity – Dec / Jan

Co-activity – Feb / Mar

Main activities What Start Finish Duration Comments Magnet campaign 9/1 13/1 1 wk No obstruction of transport lane Scaffolding, crab zone 5/1 6/1 2 days Removal 28/2 Scaffolding, LSS6 16/1 20/1 Removal 1/3 Cabling 17/1 13/3 8 weeks BA6, shaft, TA6, tunnel. Not compatible with welding (shaft) Cryo line installation 23/1 28/2 5 weeks Pressure test at night, 27/2 Handling equipment, TA6 alcove 20/12 5 days Handling equipment, crab zone 7/3 15/3 10 days Zone free from anything, only EN/HE Cryo warm pipework, BA6 27/1 3 weeks Pipe segments installation, welding Cryo warm pipework, shaft 15/12 “

Zones Crab zone LSS6 tunnel TA6 tunnel TA6 alcove

Scaffolding Scaffold 2 Scaffold 1 Scaffold 2 Scaffold 2 Platform

Cryogenic distribution line (“the QRL”)

Open issues I will define better the sequence in each zone (for example in BA6 surface bdg.) with your help. Can EN/EL deal with removal of the cable tray and yellow support from the crab cavity zone and all along the tunnel? Are INSTALLATION of scaffold in the tunnel and cabling campaign in the tunnel compatible, can they be done at the same time? Can TE/CRG work (a bit more) in parallel on the warm cryogenic pipework in BA6 and shaft? This activity determines the start of the cabling campaign.