Interstate 15 North Phase 4

Slides:



Advertisements
Similar presentations
Click to edit Master title style »Click to edit Master text styles –Second level Third level –Fourth level Fifth level Construction Update 11/13/2012 Larry.
Advertisements

Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Meridian Road Interchange Rebuild ITD Board Meeting June 18, 2009.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Congressional District Projects New CD-2 SH 392 Interchange at I-25: — Bridge replacement and widening, will also improve on/off ramps and frontage roads.
WELCOME! October 28, 2013 ODOT District 1 & District 2.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
10 miles on I-80 from Robb Dr. to Vista Blvd. Reconstruction through congested downtown Installation of new 10-mile ITS system Preserved Operational Capacity.
January 31 st, 2012 North Coast Corridor A Better Environment for the Future.
Transportation Infrastructure Bond Corridor Mobility Improvement Account.
Narcoossee Roadway Corridor Analysis Osceola County Board of County Commissioners Meeting December 4, 2006
Proposition 1B and the Strategic Growth Plan Randell Iwasaki California Department of Transportation.
Federal Aid Project No. STP 2603 (501) Environmental Assessment
NTTA Expansion Program ASCE January Luncheon Meeting Delivering Mobility Gerry Carrigan Assistant Executive Director of Project Delivery North Texas Tollway.
Florida Department of Transportation District One Interstate Planning for I-4 and I-75 October 30, 2012.
DRAFT 2009 Long Range Transportation Plan Highway Projects August 11, 2009.
I-65 Added Travel Lanes Project in Tippecanoe County
Congressional District Projects New CD-1 Central Park Blvd/I-70 — $47.2 million project funded through the American Recovery and Reinvestment Act (ARRA).
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Road To Success US 41 WIS 441 Tri-County. Road To Success DBE Workshop and Secretary’s Golden Shovel Awards February 18, 2015.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Current Construction Projects Major Projects Pinellas County.
Congressional District Projects New CD-7 North I-25 Record of Decision (ROD): — Recently signed the Environmental Impact Statement (EIS), for the corridor.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
DRAFT 1 Significant Changes for the 2006 Constrained Long-Range Plan March 3, 2006.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
AWARD OF CONTRACT FOR CONSTRUCTION OF CALIFORNIA OAKS ROAD AT I-15 INTERCHANGE CIP NO City Council Meeting January 18, 2011.
Design Criteria CTC 440. Objectives Know what “design criteria” means Determine design criteria for various types of facilities.
SAFETY FUNDING APPLICATION SUM CANTON ROAD CORRIDOR SUM Canton Road Corridor Project Safety Improvements.
Design Manager: Chris Thomas CEAL July 17, Interstate 8 (I-8) to Interstate 5 (I-5) Connector Widening and Auxiliary Lane Project.
I-15 Express Lanes Project January 2012 I-15 Express Lanes Project January 2012.
Interstate 15 North Phase 4 9/01/2015 VE Class. Background: I-15 North Environmental Document, Purpose & Project Elements I-15 North Environmental Assessment.
Metro Highway Program Presentation to CMAA Abdollah Ansari
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
MED SR 18 Corridor Project MED PID October 13, 2015.
2009 Sales Tax Extension Project Status Update. 2 Background Sales Tax was extended via August 26, 2008 referendum. Sales Tax was extended for an additional.
Integrity - Competence - Service Hogan Road/Exit 187 Proposed Improvements Public Informational Meeting June 9, 2016.
Interstate 15 North Phase 4 9/01/2015 VE Class
Project Overview and Stakeholder Outreach
Englewood Mews HOA May 23, 2017 Michelle Holland, Megaprojects Communication Manager Virginia Department of Transportation John Morse, I-66 Project.
Interstate 15 North Phase 4 Cost Risk Assessment 9/03/2015
Existing Interchange CC 215 Single bridge I 15
I-15 North Phase 4 Project Scoping Overview January 28, 2016
Orange County Transportation Authority
Est. Begin Construction
Interstate 15 North 8/17/2015 Update
I-15 North Phase 4 Scoping & Project Management Assistance
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Interstate 15 North 4/09/2015 Update
TVTC Impact Fee Update Nexus Study January 30, 2008
I-15 North Phase 4 Scoping & Project Management Assistance
Project Status Update I-680 Southbound HOV Gap Closure Project Environmental Phase September 2011 PARSONS.
River to Sea TPO Meeting US 92/International Speedway Boulevard
Kerr Tar Project Update – June 2016
From North of River Road to North of State Road 681
Construction Management & Inspection
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Upcoming Major Projects Nevada Transportation Conference April 9, 2013
Victor Valley Subarea Expenditure Plan
US 75 Improvement Study Thanks for attending the Texas Department of Transportation’s first Grayson County open house for the US 75 Project from FM 1417.
Using CMFs in Planning for Virginia’s Project Funding Prioritization
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Volusia TPO Board Meeting January 22, 2013
projects update ATLANTA district
Design Criteria CTC 440.
Major Initiatives in Hampton Roads
Presentation transcript:

Interstate 15 North Phase 4 This is an introduction to the I 15 Phase 4 Project, that consists of the improvements of the System-to-System Interchange between the CC 215 Beltway and the I 15 North corridor.

I-15 North Environmental Document Study Purpose and Project Elements from US 95 (Spaghetti Bowl) to Apex interchange I-15 North Environmental Assessment –FONSI issued May 2007 Purpose: Accommodate Projected Traffic Decrease Congestion Reduce Travel Times Improve Access, Operations & Safety Elements Increase Capacity Improve Interchange and ramps Enhance Freeway Management System Length : 15 miles The Study consider the 15 miles stretch of I 15 from the US 95 (Spaghetti Bowl) to the Apex Interchange.

I-15 North Phasing Plan: 3 segments and one Interchange Phase 1 – US 95 (Spaghetti Bowl) to Craig Rd Phase 2 –Craig to Speedway Phase 3 – Speedway Blvd to Apex Interchange Phase 4 – I-15 N / CC 215 Beltway Interchange This 15 miles stretch was phased to meet schedule and funding availability into 4 Phases. These Phases consist of 3 segments and an interchange.

I – 15 North Phase 1 5 miles segment, US 95 to Craig Rd Widened I-15 to ten lanes from US 95 (Spaghetti Bowl) to Lake Mead Widened I-15 to eight lanes from Lake Mead Boulevard to Craig Road Reconfigured Lake Mead Interchange – realignment of the on-ramps and off-ramps Added Auxiliary Lanes Completed 2010 Cost $250 M Phase 1 consisted of the $250 Million Design-Build project completed in 2010

I-15 North Phase 2 Craig Rd to Speedway Blvd Widen I-15 from 4 to 6 lanes for 4.8 miles Add Aux. Lanes Restore pavement condition Add ITS (Complete 2013) Widen 4 Bridges over the UPRR Seismic Retrofit 6 Bridges Replace R/W Fence

I-15 North Phase 2 Five Construction Packages Package A - Remove & replace PCCP with PBS (Craig to Lamb), PBS (Lamb to Speedway), ROW fence replacement, and widen & seismic retrofit G-958 N & G-958 S. Projected AD date July 2015. Package B - Construct ITS elements (Craig Rd to Speedway) and a DMS @ Garnet. Construction completed in the 4th quarter of 2013. Package C - Bridges - widen & seismic retrofit for, G-961 N & G-961 S, seismic retrofit only for I-956 & I-965. Projected AD date 2016.

I-15 North Phase 2 Five Construction Packages Package D - Capacity Improvements (4 to 6 lanes), auxiliary lane additions, widen RCB’s and landscaping improvements. Projected AD date 2016. Package E – Construct remaining ITS elements (Speedway to Apex Interchange). (To be included in FAST Package H??). Projected AD date 2016.

I-15 North Phase 3 Speedway Blvd to Apex Interchange Widen I-15 from 4 to 6 lanes Design to resume 2018 or later Project on “Hold” Construction Funding has not been identified

I-15 North Phase 4 System-to-System Interchange Improve I-15 and CC 215 Beltway System to System Interchange Project AD 2016 Timing of Construction Funding Uncertain (2018-2022)

I-15 North Phase 4

I-15 North Phase 4 2014 - 2018 2016 - 2022

I-15 North Phase 4

I-15 North Phase 4 Project will be divided into $40-$60 M packages for construction delivery

I-15 North Phase 4

I-15 North Phase 4 At This time we are processing an RFP for: 30% Design Phasing Plan Value Analysis/ Value Engineering Initial Financial Plan Benefit/Cost Analysis

Questions?