Presentation is loading. Please wait.

Presentation is loading. Please wait.

Est. Begin Construction

Similar presentations


Presentation on theme: "Est. Begin Construction"— Presentation transcript:

1 Est. Begin Construction
Performance Report May 2017 Capital Improvement Projects All Projects Under Construction On Target Under Review Pending Funding At Risk Project Funding Source Estimated Completion Total Cost (in Million) Health A-01 Windy Hill / I-75 Interchange DDI CID/SPLOST/ARC/SRTA 2017 $19.4 Bridge is active and open to traffic under new DDI configuration. Bridge construction continues on decorative fencing, arches, and lighting. Anticipate full completion June 2017. A-02 Windy Hill East & West Side Road Improvement CID/SPLOST/SRTA $26.9 WH – E, construction is complete. WH – W, construction is complete. B-23 US 41 Cobb Pkwy Enhancement CID/SPLOST/GDOT $36.7 Landscape installation – Middle section complete. Sections at Galleria area & the River – Near completion. I-285 at Cobb Pkwy Interchange – Project is underway. B-02 US 41 / Cobb Pkwy Central Streetscape CID/ARC $3.8 - Lighting relocation. Coordinating design and GDOT approval. B-14 Riverwood Parkway Streetscape CID $0.65 - Coordinating with the County on the CFA. B-19 Cumberland Boulevard Bridgescape CID/GDOT $2.2 Finalizing fence fabrication, bridge construction/fence installation will begin in June 2017. Interstate North Parkway Ped Improvements 2018 $8.6 - Interstate N. Pkwy – frm the Marriott to Windy Ridge Pkwy is complete, frm Windy Ridge Pkwy to Cumberland Blvd - construction work continues including a 10 ft. multi-use trail, curb/gutter, walls, and decorative lighting. A-13 I-285 Pedestrian Bridge CID/CCDOT 2017 $9.8 Open to pedestrians on game days. Construction work continues on wall and fencing, and bus ramp along east side of ped bridge. Anticipate full completion Aug 2017. C-01 Bob Callan Trunk Trail Ph. II Segment A CID/FHWA/ARC 2019 $8.81 Construction work continues. Bob Callan Trailhead has been closed due to construction work. Anticipate completion 2019. Windy Ridge Bridge Ped Enhancement CCDOT 2017 $10.0 Open to pedestrians and motorist. Project is near completion, installing decorative fencing and lighting. Anticipate full completion June 2017. A-08 Cumberland Blvd West Intersection Improvement & Ph III Streetscape CID/CCDOT/GDOT 2018 $6.3 Contractor has completed clearing work, and will begin erosion control. Select Projects In Design/ROW On Target Under Review Pending Funding At Risk 0 Project Funding Source Est. Begin Construction Est. Total Cost (in Million) Health A-12 Akers Mill Ramp CID 2017 $48.9 Phase 1 - GDOT is advancing construction on this phase. Phase 2 - Received official approval from FHWA. C-12 Palisades/Paces Mill NRA Unit Rehabilitation CID/TBD TBD Undetermined - Short listed firms are scheduled to interview end of May A-03 Terrell Mill Connector SPLOST/GDOT 2019 $30.0 County is conducting design and is anticipated to be complete June 2017. Beginning ROW phase Summer 2017.


Download ppt "Est. Begin Construction"

Similar presentations


Ads by Google