Far side Near side -Z End +Z End 5m Wed Dec 7 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability.
Advertisements

Line Efficiency     Percentage Month Today’s Date
Barrel Maintenance Scenario for LS1 MUON-IB CMS week 11 December 2012 A. Benvenuti (INFN Bologna)
Endcap Integration Workshop: June 11-14, CSC Commissioning Andrey Korytov.
Notes After TIG 17/7/08 HF+ Move out of garage: Aug 15* Platform+table+collars+racks+BP support (jack up for platform) = 3 days Controls for motors = 1.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
Dubna Feb 2011 AB Baseline planning - from now to 2020 ~60 months of p-p running - 4 weeks of Heavy Ion Collisions every year (8 runs) - Annual year-end.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
Gantt Chart of Progress FY
LHeC Coordination Meeting, 9 June 2017
Jan 2016 Solar Lunar Data.
Instruction This template should be used Only for The Best Employee Engagement category. Template can be modified, subject to your company template or.
Project Major Activities Over Next Days (as of xx/xx/xx)

CMS Area Working Group Meeting
Thanks to all of you for this effort !
CRG activities for EYETS 2016
CMS RPC Endcap RE1 Status Report
Q1 Jan Feb Mar ENTER TEXT HERE Notes
Employee engagement The Best Contact Center Indonesia 2018.
Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun

Japan proposal on schedule
Project timeline # 3 Step # 3 is about x, y and z # 2
Average Monthly Temperature and Rainfall


2017 Jan Sun Mon Tue Wed Thu Fri Sat
Timeline PowerPoint Template

This Presentation Pack is brought to you by
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Gantt Chart of Progress FY


FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16

Step 3 Step 2 Step 1 Put your text here Put your text here
Calendar Year 2009 Insure Oklahoma Total & Projected Enrollment
MONTH CYCLE BEGINS CYCLE ENDS DUE TO FINANCE JUL /2/2015
Jan Sun Mon Tue Wed Thu Fri Sat

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec ITEM 1 ITEM 2 ITEM 3

Electricity Cost and Use – FY 2016 and FY 2017

Ciprian Plostinar Workshop on Testing and Commissioning
SC SC SC WS SC S HIS Background document Seminar document
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE


Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Project timeline # 3 Step # 3 is about x, y and z # 2

Accelerator Installation Schedule
Globus-M2 will be constructed by the end of 2015
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
CSC Electronics Installation and Commissioning CSCE I&C
Presentation transcript:

Technical Coordination Parallel Session November 2011, FNAL CMS Upgrade Week and Workshop Draft LS1 Schedule Technical Coordination Parallel Session November 2011, FNAL 09/11/2011 Martin.Gastal@cern.ch

Assumptions Working time Start Date Duration Key objectives 8h/day, 5 days a week No work during the CERN Xmas holidays Start Date Nov 17th 2012 Duration 20 to 24 months Key objectives Install TK seal to allow for cold operation Install and bake-out new Beam Pipe Install YE4, ME4/2, RE4 Perform maintenance/upgrade on DT/HO 09/11/2011 Martin.Gastal@cern.ch

Top Level Draft Schedule 09/11/2011 Martin.Gastal@cern.ch

09/11/2011 Martin.Gastal@cern.ch

Task #2 – Bring CMS to full open Config Start configuration End configuration A Time period: 19 Nov 12 – 12 Dec 12 Duration estimated from previous opening operations: 18d Bringing beam pipe to 1Bar included Could be interleaved with partial removal of Beam Pipe G 09/11/2011 Martin.Gastal@cern.ch

09/11/2011 Martin.Gastal@cern.ch

Task #3 Configuration on both ends G Time period: 13 Dec 12 – 14 Feb 13 Duration: 36d Includes: Remove of the whole CMS beam pipe Install Light Weight platform Install PIX table Remove BCM1 Remove PIX Maintain RPC/CSC on YE1s Remove PIX table Install Surkov Frame 09/11/2011 Martin.Gastal@cern.ch

09/11/2011 Martin.Gastal@cern.ch

Tasks #4 & 5 Configuration both ends G Time period: 15 Feb 13 – 11 Apr 13 Duration: 40d Includes: Install TK seal + partial commissioning Remove ME1/1 chambers Start refurbishing ME1/1 chambers in SX5 Fine tune End Cap position to allow for upgrade of YE3s cooling infrastructure (for ME4/2 and RE4) Remove Light Weight platform 09/11/2011 Martin.Gastal@cern.ch

09/11/2011 Martin.Gastal@cern.ch

Tasks # 6,7,8 and 9 Configuration +Z end Configuration -Z end E G Time period: 12 Apr 13 – 18 Jul 13 Includes: Install ME42: 30d Move to EC open config. Reinstall ME1/1 Install RE4 services Maintain EC systems Access to Vac Tank through ladder like access Includes: Install YE-4: 6 weeks Work on YB0 for HO, DT, RPC: 54d Modify YBs configuration Work on YB1/2 for HO, DT, RPC Access to Vac Tank through ladder like system 09/11/2011 Martin.Gastal@cern.ch

Task # 7 Once sequence is agreed upon, each task will be broken down in finer details 09/11/2011 Martin.Gastal@cern.ch

09/11/2011 Martin.Gastal@cern.ch

Tasks # 10,11 and 12 Configuration +Z end Configuration -Z end F Includes: Install YE-4: 6 weeks Work on YB0 for HO, DT, RPC: 54d Modify YBs configuration Work on YB1/2 for HO, DT, RPC Access to Vac Tank through ladder like system Install fwd part of BP Restore full open config. Time period: 19 Jul 13 – 24 Oct 13 Includes: Install RE4 services Maintain EC systems (change EC configuration as needed) Access to Vac Tank through ladder like access Install fwd part of BP Restore full open config. 09/11/2011 Martin.Gastal@cern.ch

09/11/2011 Martin.Gastal@cern.ch

Tasks #13,14 & 15 Configuration on both ends G Time period: 25 Oct 13 – 20 Dec 13 Includes: Remove Surkov frame (end of TK seal activity) Install Light Weight platform Complete installation of new Beam Pipe: 5d Bake-out new beam pipe: 31d (continuous) Install PIX table Perform trial insertion of new PIX mockup Install PIX, PLT, BCM, PIX seal Delivery date for the new Beam Pipe is critical 09/11/2011 Martin.Gastal@cern.ch

09/11/2011 Martin.Gastal@cern.ch

Task #16 Configuration on both ends H Time period: 06 Jan 14 – 14 Feb 14 Duration: 6w per end. Work in YB1/2 gap Includes: Open YB2 to access IP side Reinstall YB2/1 HO RBXs (HPDs qualified at Princeton) Close & lock YB2s 09/11/2011 Martin.Gastal@cern.ch

09/11/2011 Martin.Gastal@cern.ch

Task #17 Start configuration End configuration G A Time period: 17 Feb 14 – 12 Mar 14 Duration estimated from previous opening operations: 18d Includes: Close and lock End Caps Put HFs on 2 risers Install Totem T1s Put HFs on 4 risers A 09/11/2011 Martin.Gastal@cern.ch

CMS closed 5months Before end of LS1 09/11/2011 Martin.Gastal@cern.ch

09/11/2011 Martin.Gastal@cern.ch

Task #19 – Master Magnet Test Configuration on both ends A Time period: 13 Mar 14 – 19 Mar 14 Duration: 5d Final opportunity to test the TK seal Check magnetic behavior of YE4s 5 months before the end of LS120 to fix a major Magnet/TK problems 09/11/2011 Martin.Gastal@cern.ch

09/11/2011 Martin.Gastal@cern.ch

Tasks #21 to 26 Configuration on both ends C Time period: 20 Mar 14 – 30 Jun 14 Includes Lower HFs to garages Pull back YE4s Install RE+4 Install ME-4/2 Install RE-4 Move HFs to beam level Cosmic Challenge at 0T on-going 09/11/2011 Martin.Gastal@cern.ch

09/11/2011 Martin.Gastal@cern.ch

Tasks # 27 Configuration on both ends A Time period: 01 Jul 14 – 04 Jul 14 Duration: 4d Re-install CASTOR 09/11/2011 Martin.Gastal@cern.ch

09/11/2011 Martin.Gastal@cern.ch

Tasks # 28 – Magnet Re-commissioning Configuration on both ends ` A Time period: 07 Jul 14 – 11 Jul 14 Duration: 1w 09/11/2011 Martin.Gastal@cern.ch

09/11/2011 Martin.Gastal@cern.ch

Tasks # 29 – CRAFT Configuration on both ends A Time period: 14 Jul 14 – 22 Aug 14 Duration: 6w Can take place during LHC re-commissioning 09/11/2011 Martin.Gastal@cern.ch

09/11/2011 Martin.Gastal@cern.ch

Tasks # 30 – LS1 contingency Contingency management 6 weeks on the critical path: ~7.5% Saturdays held as slack Xmas breaks not counted 09/11/2011 Martin.Gastal@cern.ch

09/11/2011 Martin.Gastal@cern.ch

Tasks # 31 – Beam Pipe pump down Configuration on both ends A Time period: 04 Oct 14 – 24 Oct 14 Duration: 21 continuous days 09/11/2011 Martin.Gastal@cern.ch

With current scope, 20 month shutdown would be too short 24 month shutdown would be appropriate 09/11/2011 Martin.Gastal@cern.ch