Dubna Feb 2011 AB Baseline planning - from now to 2020 ~60 months of p-p running - 4 weeks of Heavy Ion Collisions every year (8 runs) - Annual year-end.

Similar presentations


Presentation on theme: "Dubna Feb 2011 AB Baseline planning - from now to 2020 ~60 months of p-p running - 4 weeks of Heavy Ion Collisions every year (8 runs) - Annual year-end."— Presentation transcript:

1 Dubna Feb 2011 AB Baseline planning - from now to 2020 ~60 months of p-p running - 4 weeks of Heavy Ion Collisions every year (8 runs) - Annual year-end shutdown for ~10 weeks - 15 mo shutdown in 2012/2013  LHC to nominal energy - 15 mo shutdown in 2016  Phase 1 upgrade - 19+ mo shutdown in 2020(+x)  HL-LHC upgrade - from now to 2020 ~60 months of p-p running - 4 weeks of Heavy Ion Collisions every year (8 runs) - Annual year-end shutdown for ~10 weeks - 15 mo shutdown in 2012/2013  LHC to nominal energy - 15 mo shutdown in 2016  Phase 1 upgrade - 19+ mo shutdown in 2020(+x)  HL-LHC upgrade LS 1LS 2 LS 3

2 Dubna Feb 2011 AB AB guess at most probable outcome 2024 Extended maintenance LS 1 LS 2LS 3

3 Mark Gallilee TE-VSC/EIV January 21, 2011 IBL Inner Support Tube (IST) Beam Pipe 45mm ID IBL Staves Current IST support 3 Insertable B-Layer (IBL)

4 Dubna Feb 2011 AB New Pixel detector overview 21 February 2011J. Nash CMS Upgrades TP4

5 New beam pipe for pixel upgrade CMS Technical Coordination requested in Nov 2010 a CAD design study for a beam pipe diameter that still would be compatible in installation and required clearances with 12 face innermost barrel layer. BPIX design study finished in Jan. 2011 Considered: cabling clearances inner shield imperfections beam displacements < 2 mm minimal overlaps of sensor areas Conclusion: mean 1 st layer Si- radius = 29.8 mm need 2 mm clearance to beam pipe need adjustable closing mechanism Beam pipe diameter (outer) = 45 mm !

6 Dubna Feb 2011 AB Improved B tagging 21 February 2011J. Nash CMS Upgrades TP6

7 Baseline: Long Shutdown 1 Timeframe Est IntegTasks lumi /fb -1 Items carried over from year-end stop 2011-12 (if no opening) 2012-141-10Yoke Endcap disk 4 construction at +z and –z ends in situ. 4’th muon endcap stations +z and –z (CSC & RPC) (-z only if 2012) 1’st endcap muon station readout granularity restoration +z and -z Beampipe region shielding + forward region opening under vacuum -forward systems CASTOR, ZDC, reinstallable for p-p HO, HF & CASTOR calorimeters phototransducer change Beampipe : bakeout if required based on NEG tests ( ~2 mo more)  possible installation of 45mm central beampipe  option to remove all pipe at start of shutdown (time vs logistic simplification) Beam Scintillation Counter upgrade/replacement. Barrel – endcap seal revision for colder Tracker operations + very many infra & common systems consolidations. After which CMS should be ready for 13-14 TeV, 100fb -1 and 1-2 x 10 34 cm -2 s -1

8 Dubna Feb 2011 AB What about the 2’nd Long Shutdown? Programme likely to be strongly affected by the decision to postpone 1’st Long Shutdown Recall 2016 was a good compromise between different interests requesting 2015 & 2017. LS 2 start date and duration to be re-considered based on: - Physics: achieved pre LS 1, and targeted between LS1 and LS2 - Actual start/duration of LS 1: eg Nov 2012-Feb 2014 or Dec 2012-June 2014? (Presumably not sensible to have < 2 full running years between LS1 and LS 2) - Status/capabilities of LHC & Experiments on completion of LS1 & pre LS2 - Credible ready-date of various upgrades wrt shutdown timing. - Performance consolidation/improvement/risk reduction expected from LS 2. Change brings stress but also provokes the imagination! Considering ways to avoid delays to (already delayed) work on: - HCAL consolidation (HPD replacement & depth segmentation), ready 2015. - Installing low-mass 4-layer pixel tracker, (also ready 2015) on 45mm beampipe.  possible installation and bakeout of new 45mm beampipe in 2013-14  pixel in year-end technical stop 2015-16 or 2016-17 (3mo min)

9 CMS Technical Organisation: Overview for Operation, Maintenance & Upgrade Projects Technical Coordination A.H.Ball (TC), W.Zeuner (DTC) P5 expt area management M.Gastal D. Hay Magnet, Infrastructure & Common Systems Teams B. Cure A. Gaddi, Engineering & Electronics Teams H.Gerwig, M.Hansen CERN-CMS Detector Technical Teams D. Abbaneo Run Coordination A. Ryd M.L. Chamizo PH-DT support teams & facilities Upgrade Coordinator J. Nash FSUsContractors TK N. Bacchetta DT A. Benvenuti ECAL A.Singowski W.Funk RPC S. Buontempo CSC A. Lanaro HCAL P. de Barbaro Alignment T. Rodrigo CMX Group leader P. Siegrist PH-liaison P.Petagna CMS Subdetector Coordinators TC office D. Hudson Engineering and Electronic Integration, Gaddi/Hansen CMS Infra Task Groups Safety in CMS facilities C.Schaefer(GLIMOS) S.Bally (RSO) LHC s/d coord TIOC SC, BFSP PH-Dept Hd. Machine Interface Beam/Lumi monitors N. Bacchetta R. Hall-Wilton BE, EN,GS,PH,TE technical groups LHC technical operation [M. Arnaud (SafCo)] CMS management, CERN management Field Coord Tech Coord

10 Inner tracking upgrade Mar11 AB Upgrade Project Tech Coord Forward muon Project coord Pix/BP/PLT Project coord HCAL photodt/ront end Project Coord  > 3 region Project Coord YE4 BpixFpixPLTInfra CSCInfra HOHB/ HE CASTHF 904RPC CALTRAKBRMTAS/ SHIELD BPVFWDInfra BP TC


Download ppt "Dubna Feb 2011 AB Baseline planning - from now to 2020 ~60 months of p-p running - 4 weeks of Heavy Ion Collisions every year (8 runs) - Annual year-end."