Chapin Town Hall Meeting

Slides:



Advertisements
Similar presentations
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Advertisements

 Provide a safe crossing and maintain mobility › The bridge is identified as structurally deficient.  Meet regional traffic demands and improve mobility.
DDI Traffic Informational Session Town of Cornelius Lake Norman Chamber of Commerce June 11, 2014.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Titusville to Edgewater Bike Loop PD&E Study
District 2 System Preservation Projects for FY 15 and FY 16 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
November 14, 2014 District Construction Season.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
Congressional District Projects New CD-1 Central Park Blvd/I-70 — $47.2 million project funded through the American Recovery and Reinvestment Act (ARRA).
S.R. 144 Intersection Improvement and Road Reconstruction Project Tuesday, October 11, :30pm Presentation Neil A. Armstrong Elementary School 1000.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Current Construction Projects Major Projects Pinellas County.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues.
Presenter: Dewayne Johnson, P.E. SE Region Director/Bureau of Traffic Operations Director.
Comprehensive Update on Indian Trail Infrastructure Plan September 8, 2015.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
East State Street (USH 12) Hanover Street to Pine Street Juneau County November 14, 2013 Public Information Meeting.
I-70 Second Tier Environmental Studies SIU #7 Presentation to TEAM September 16, 2004.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
STA Safety Project PID #76439 December 12, 2006.
SAFETY FUNDING APPLICATION SUM CANTON ROAD CORRIDOR SUM Canton Road Corridor Project Safety Improvements.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
Engineering Study Griffin View Drive & Harbor Hills Blvd. Prepared for Lake County Public Works Engineering 437 Ardice Avenue Eustis, Florida Purchase.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
MED SR 18 Corridor Project MED PID October 13, 2015.
Asphalt Pavement Association of Indiana Annual Winter Conference Michael B. Cline Commissioner, INDOT December 14, 2010.
TYPE OF WORK FY 2014 SUMMARYMILEAGE LONG TERM FINANCING FEDERAL / STATE AIDS COUNTY LEVY LOCAL SOURCES OTHER SOURCES TOTAL COST ADT PE CTH II -- Winnebago.
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
PUBLIC INFORMATION MEETING Ridgewood Avenue Safety Improvement Project From North of Falcon Avenue / Riverside Drive to North of Lamont Street in Volusia.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
Planning and Environmental Linkages MPO/COG Conference February 24, 2016.
Visit Our Website at: Click to edit Master title style.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Preliminary Estimated Cost
I-66 OUTSIDE THE BELTWAY Shrevecrest HOA JUNE 21, Susan Shaw, P. E
2017 AGC Summer Conference July 28, 2017
Improvements to Stockton Street
All About the County Road 22 Roundabout
The Gainesville Area Chamber Infrastructure Investment Initiative
Pensacola Bay Bridge Replacement Design Build
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Project Management Team Meeting #3
The Oakton Condominium Association September 12, 2017
River to Sea TPO Meeting US 92/International Speedway Boulevard
Kerr Tar Project Update – June 2016
IA 122 RECONSTRUCTION PRE-BID MEETING
Citrus Park Drive Extension
Transportation Projects
Highway 169 Bridge Replacement & Pavement Resurfacing
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Issaquah-Fall City Road
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Coffee & Construction Developer Meeting
Paris & DALLAS DISTRICT corridor PROJECTs update
Contract 60X10 Informational Meeting Weber I-55
S.R. 26 Road Rehabilitation in Clinton County
S.R. 261 Intersection Improvement at Fruitwood Lane in Newburgh
Metropolitan District | mndot.gov
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
Proposed I-710 Early Action Project City of Huntington Park Slauson Avenue Capacity Enhancement Improvements I-710 TAC Meeting August 2018.
Presentation transcript:

Chapin Town Hall Meeting Project Updates September 29, 2016 Jennifer Necker, PE Midlands Program Manager Robert Dickinson, PE Acting District 1 Engineering Administrator John Boylston, PE Midlands Regional Production Engineer

Agenda Safety Improvement Projects I-26 Widening Carolina Crossroads Projects Under Construction Resurfacing Projects

Chapin Rd @ Murray Lindler Rd / East Boundary Street Traffic Study Underway Chapin Rd Murray Lindler Rd Intersection Improvement at US 76 (Chapin Rd.) & S-82 (Murray Lindler Rd/E. Boundary St.), located 0.8 miles SE of the Town of Chapin, Lexington County. Consultant preparing traffic study Once traffic study is complete the improvements will be determined and a schedule will be set

Murray Lindler Road @ Old Lexington Highway Roundabout Construction Anticipated Spring 2017 S-82 (Murray Lindler Road) @ S-83 (Old Lexington Highway) & S-940 (Murray Lindler Road) Tentatively scheduled in the November 2016 Letting Old Lexington Highway

Dutch Fork Rd and Johnson Marina Rd Improvements to increase safety and sight distance Construction Anticipated Winter 2016 Dutch Fork Rd Intersection Improvement at US 76 (Dutch Fork Rd) and S-618 (Johnson Marina Rd) Slight realignment to Johnson Marina and left turn lanes on US 76 with sight distance improvements Project was let this month Johnson Marina Rd

I-26 Widening Project Location Map Widen I-26 from MM 101 heading west on I-26 with western termini to be determined US 176, Exit 101 – Irmo Widen I-26 from 4 to 6 lanes. Currently Inspecting and Analyzing Bridges Once Bridges are inspected and analyzed determination will be made on which ones will be replaced and which ones jacked. Design-Build Currently anticipate Bid Opening in Fall 2018 Public Information Meetings Chapin High School October 11th, 5:00-7:00 PM Chapin Middle School October 13th, 5:00-7:00 PM

Carolina Crossroads Study Corridor Halfway through Environmental Impact Statement development. Expect completion in summer 2018. Project goals are to reduce congestion, increase mobility, and improve safety Preliminary alternatives will be available for review The I-20/26/126 Corridor is generally defined as I-20 from the Saluda River to the Broad River, I-26 from US 378 to Broad River Road, and I-126 from Colonial Life Boulevard to I-26. While this corridor is where traffic improvements appear to be most needed, alternative solutions could exist beyond this corridor that would improve traffic conditions within the corridor. Construction contractor procurement scheduled for 2019 Alternatives Public Information Meeting October 4, 5-7 PM; Presentation at 5:30 PM Seven Oaks Elementary School Check www.SCDOTCarolinaCrossroads.com and FB, Twitter, Instagram.

I-26 Pavement Preservation Widen I-26 from MM 101 heading west on I-26 with western termini to be determined US 176, Exit 101 – Irmo Widen I-26 from 4 to 6 lanes. Currently Inspecting and Analyzing Bridges Once Bridges are inspected and analyzed determination will be made on which ones will be replaced and which ones jacked. Design-Build Currently anticipate Bid Opening in Fall 2018 Start Spring of 2017 Complete by November 30, 2018 Project Engineer Jim Cravens 803 822-0333.

I-126 Pavement Preservation Widen I-26 from MM 101 heading west on I-26 with western termini to be determined US 176, Exit 101 – Irmo Widen I-26 from 4 to 6 lanes. Currently Inspecting and Analyzing Bridges Once Bridges are inspected and analyzed determination will be made on which ones will be replaced and which ones jacked. Design-Build Start Spring of 2017 Complete by November 30, 2018 Project Engineer Jim Cravens 803 822-0333.

Sidewalk Installation on Lexington Avenue Town of Chapin Enhancement Project. Along Lexington Avenue (S-83). Located From Columbia Avenue (S-48) to Just North of Chapin Road (US 76)

Projects Under Construction Trillie Lane and Silver Point Road – RCE Chris Kelly 786-0706. Peak Street – RCE Robert Power 796-9540. Amicks Ferry Road – RCE Joey McIntyre 359-4672. Bush River Road – RCE Joey McIntyre 359-4672.

Resurfacing Projects

QUESTIONS? Contact Information: Jennifer Necker, Midlands Program Manager neckerjl@scdot.org 803-737-7829 Robert Dickinson, Acting District 1 Engineering Administrator dickinsorc@scdot.org 803-737-6660 John Boylston, Midlands Regional Production Engineer boylstonjd@scdot.org 803-737-1527