Task Group API 19SS Sand Screens

Slides:



Advertisements
Similar presentations
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Robert Urbanowski Vice-Chair: Mark Trevithick.
Advertisements

2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
Kent Grebing, API SC 16 Chair
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
API 19 CI Chemical Injection Devices for Downhole Applications
API 19 CI Chemical Injection Devices for Downhole Applications
TG Chair: Darren Bane (BHI)
API SC19 HPHT Template (Proposed as SC19TR1)
Sept 2002 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
TG Chair: Mark Brinsden Shell
IEEE TGw March Agenda Date: Authors: May 2008
Task Group 19LH Liner Hanger Equipment
Updates from SC18 Summer Meeting
API 14L Specification for Lock Mandrels and Landing Nipples
Task Group API 19SS Sand Screens
TG Chair: Darrin Willauer Baker Hughes
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
March, 2003 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [WG-TG4 Opening Report Mar03] Date Submitted:
Sub-1 GHz Study Group Closing Report Sept 2018
IEEE 802 status report for ISO/IEC JTC1/SC6 meeting on 30 Oct 2017
API RP 17A - Discussion Points
Submission Title: TG4m 4TV Closing Report for May 2013
API 16F June 2017 Specification for Marine Drilling Riser Equipment
API S64 Summer Conference Update.
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
Submission Title: [WG-TG3 Opening Report May03]
doc.: IEEE <doc#>
MAWG’s deliverables status and proposed milestone
Yearly Maintenance Process (for existing messages)
Specification on float equipment
RAISING PERFORMANCE. TOGETHERTM
doc.: IEEE <doc#>
WG Technical Editor’s Report
doc.: IEEE <doc#>
API 17P TASK GROUP January, 2015.
API 17H TASK GROUP January 15, 2013.
doc.: IEEE <doc#>
Task Group G Report March 10, 2003
WG Technical Editor’s Report
November 2010 doc.: IEEE < > November 2010
API 17P SUBSEA STRUCTURES & MANIFOLDS
API 17P SUBSEA STRUCTURES & MANIFOLDS
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
<month year> doc.: IEEE < e> <September 2018>
Submission Title: ULP TG Closing Report Dallas Texas
IEEE 802 JTC1 Standing Committee Nov 2015 opening report for EC
doc.: IEEE <doc#>
doc.: IEEE <doc#>
IEEE Working Group for Wireless Personal Area Networks (WPAN™)
Specification on float equipment
Task Group 4 Low Rate WPANS Opening Report
Submission Title: [REVCOM Submission Information]
API 10 F.
IEEE IMT-Advanced Review Process
Discussion Points API RP 17A Task Group Members
doc.: IEEE <doc#>
WG Technical Editor’s Report
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
Submission Title: TG4m 4TV Closing Report for September 2013
TGaj Editor Report for LB226
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Task Group Status January 2013
API 17H TASK GROUP June 26, 2013.
API 16A January 24, 2019 Winter Conference – San Antonio
TGaj editor report for Sponsor Ballot
Presentation transcript:

Task Group API 19SS Sand Screens Mike Foster BP No company logos allowed on slide pack! January 17, 2017 Subcommittee 19

API 19SS Sand Screens Group Name: 19SS Sand Screens Chair: Mike Foster Number of Standards and RPs: 1 (ISO 17824) Meetings in last 12 months: Date Vendors Consultants End users Total number Aug 17, 2016 2 4 Aug 24, 2016 8 7 15 Sep 7, 2016 1 5 13 Sep 20, 2016 9 6 16 Oct 12, 2016 10 19 Oct 27, 2016 Nov 14, 2016 17 Dec 1, 2016 3 14 January 17, 2017 Subcommittee 19

API 19SS Sand Screens Scope: Revise ISO 17824 Modify API pill for WWS testing, add other test methods, modify Q1 WWS 100% slot inspection, Update MMS maximum aperture inspection. Ballot date on SRRR: October 2014 Anticipated ballot date: Ballot – May 2016 Re-ballot - March 2017 Status: Re-ballot - Partial Ballot on only changes last ballot Chair: Mike Foster SC Liaison: Jorge Cuesta January 17, 2017 Subcommittee 19

TG Balloting Plans Challenges to meeting the ballot date from Chair/ SC-19 Liaison perspective: Proposal to publish as API 19SS. API legal to review the document for any copy right issues Document Open Ballot Date Closed Ballot Date Comments API 19SS 5/23/16 7/5/16 83% Affirmative vote – 12 responses (10 yes / 2 no) 649 Comments: 57 General 390 Editorial 202 Technical 3/1/17 Anticipated Re-ballot – comments only on changes June 11, 2015 Subcommittee 19

Questions or Comments? June 11, 2015 Subcommittee 19