Installation Global System

Slides:



Advertisements
Similar presentations
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
Advertisements

Bentley Systems, Incorporated
Nov. 19, 2008 ILC08 Global Design Effort 1 Status Report Alternative Siting and Tunnel Design Tom Lackowski.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
Palletizing the Easy Way
Phone / Fax: (O) CHCADDOUTSOURCING CONCEPT TO COMMISIONING, NESTING FUTURE …………………
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Effective Methods for Software and Systems Integration
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Positron Source Relocation 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
SLA – Oct. 07 BDS-KOM1 Installation Overview Acknowledgment: F. Peters, M. Munro, J. Kim G. Aarons, C. Corvin, P. Rodriguez Fred Asiri/SLAC.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update November.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Interpreting and Using Engineering Information. Overview This unit aims to give learners the knowledge and skills needed to use engineering information.
Drawings ACT Objective Realize the organization and intent of construction drawings 2.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
- Overview about Malaysia oil and gas - level of realism to traditional drawing (2D dwg) - Be able to store huge amount of data referring. - Single source.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
VLCW July Global Design Effort1 Installation Global System Review F. Asiri W. Bialowons, T. Shidara Acknowledgment: C. Hauviller, R. Sugahara C.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
DESY_ILCW07 Global Design Effort-CF&S 1 Beam Delivery System & Interaction Region Fred Asiri CF&S Point of Contact.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
EPT 221 CONFIGURATION DESIGN. Objective of This Lecture Describe the configuration design phase Describe ways to generate product and parts configurations.
Fred Asiri1 Conventional Facilities SLAC April 9, 2006 Acknowledgment: Clay Corvin, Jerry Aarons, and Jonghoon Kim.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
CLIC/ILC Collaboration: 17/05/ 08Cost/Schedule Working Group1 CLIC-ILC Collaboration - #2 Cost and Schedule working group John Carwardine, Katy Foraz,
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
1 PDS MC Requirements Process March 29, 2007 (v2).
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
Fundamentals of Project Management and Schedule Development.
Fred Asiri1 Conventional Facilities SLAC Match 5, 2006 Acknowledgment: Clay Corvin, Jerry Aarons, and Jonghoon Kim.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
E- source kick-off meeting e- Source RDR- Conventional Facility & Siting Overview Fred Asiri/SLAC.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Pipe Shop Consulting Planning and Execution of an Automated Pipe Shop
Conventional Facilities and Siting Global Group (ARCFS)
Preparation for DESY Meeting
Software Specification and Configuration Management
CLIC Civil Engineering Update
Conventional Facility & Siting (CF&S) Overview for the Positron Source
PLM, Document and Workflow Management
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Americas KlyCluster Cost Analysis Overview
IEEE Std 1074: Standard for Software Lifecycle
Copyright Scott Bloss, All rights reserved.
CLIC Civil Engineering Update
Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon Fred Asiri.
The DBD: Outline and Scope
BIM - Building Information Modeling A well-structured BIM is a key to achieve success in the Building Design and Construction process. Qatar Green Leaders.
Pipe Shop Consulting Planning and Execution of an Automated Pipe Shop
Undulator System Installation
Overview of Day One – 29 Feb 2016
Piping and Instrumentation for Process Industries
Installation Binder / IRR – an example
Electron Beam Systems ETC and Methodology
CF Scope, Management & Organization
T-FLEX DOCs PLM, Document and Workflow Management.
Presentation transcript:

Installation Global System PROGRESS OVERVIEW Fred Asiri, Wilhelm Bialowons, Tetsuo Shidara Fred Asiri LCWS 2006- Bangalore, India 1

Charge: Installation: Responsible for developing the installation schedule for the ILC installation. Work with the system managers and the engineering groups to develop a model for component fabrication, receiving, warehousing, and installation. Needs the scope of work details Fred Asiri LCWS 2006- Bangalore, India 2

STRATEGY: Define Installation System Reach agreement about the Installation System Establish subsystem interfaces/Boundaries Obtain all pertinent material on similar installation Obtain components list from Area System managers Prepare and maintain an up-to-date Configuration drawing for the Baseline Machine Establish an integrated installation process for the ILC Baseline in full cooperation with other regions Fred Asiri LCWS 2006- Bangalore, India 3

Definition of Terms: Components are defined to be elements of the ILC machine and may be anything from complex subassemblies to single items, which are at the highest stage of pre-subassembly possible prior to installation in the beam tunnel or support tunnel. Components are to be bundled into installation kits ready for subassembly or if possible for installation in their operational location. Fred Asiri LCWS 2006- Bangalore, India 4

Assumptions: Installation begins when conventional facilities turn over facility ready for beneficial occupancy and installation is complete system checkout and conditioning are finished and commissioning begins. Point of contact with CF&S has been established - Vic Kuchler Questions: Where should the component subassembly take place, on-site or off-site What should the overall schedule for construction and installation be based on? According to the first pass DCB schedule; All components must be delivered to the ILC site for completion of installation within 7 years of the start of construction Fred Asiri LCWS 2006- Bangalore, India 5

Subsystem Interfaces: At Beneficial Occupancy Conventional Facilities will provide the following: Housing (surface and tunnel) ready for beneficial occupancy Surveying monuments for the civil construction AC power distribution Water system for hose attachments Ambient temperature control and ventilation system Lighting system Compressed air Telephone system backbone - Installation will then begin ………… Fred Asiri LCWS 2006- Bangalore, India 6

Obtain all pertinent material on similar installation : Gathered relevant material on area installation for LEP, NLC, and LHC Fred Asiri LCWS 2006- Bangalore, India 7

Obtain components list from Area System managers: Point of contacts has been established Draft need list has been prepared and distributed Schematic and graphic concept sketches of the system components, or subassemblies, revealing Function, size, volume and weight, and their Point of connection or interface with other area systems. Largest maintenance units for replacement, with volume, weight, dimensions, and transport fixtures. Area utility needs at point of connection described in standard engineering units for: Pressure, flow, temperature, fluid velocity, power, voltage, current, power factor, etc. Fred Asiri LCWS 2006- Bangalore, India 8

Prepare and maintain an up-to-date Configuration drawing for the Baseline Machine: First cut version of the configuration drawing has been prepared This drawing is set in different layers to match each Area System This drawing will serve to define the interfaces and boundaries of each A.S. Fred Asiri LCWS 2006- Bangalore, India 9

Established 3DVisualization and Integration tools to facilitate the installation process: Visualization Tasks Goal Status Tools and software Information Required 3D modeling Developing 3D model with real dimensions Supporting interference check Beam delivery system (20 mrad and 2 mrad) Positron bypass options Main Linac 5 km main linac RF service tunnel layout AutoCAD 2006 Pipes, cables (geometry information) Movement path Material (optional) Walk Through Animation Implementing real-time walk through animation from operator’s perspective Supporting visual analysis Autodesk 3DS Max ($3,500) Integration Tool Supporting option study Automatic generation of 3D view, cost estimation AutoCAD 2006, VBA, Excel Fred Asiri LCWS 2006- Bangalore, India 10

Establish an integrated installation process for the ILC Baseline in full cooperation with other regions: Installation Tasks Goal Status Tools and software Information Required Fabrication and delivery management Real-time tracking on fabrication and delivery status Managing and optimizing the delivery process Set-up of the Data Base Software First phase (~$100K) Size and weight of components Fabrication sequence and time Functional compatibility study Checking functional compatibility between sub-systems ? Searching Estimating $50K ~ $100K Interconnections requirements  On-site installation process management Visualizing on-site assembly and installation process Supporting analysis on assembly and installation process Supporting analysis on site logistics Common Point Project4D Storage area available Installation sequence and time Fred Asiri LCWS 2006- Bangalore, India 11

Fred Asiri LCWS 2006- Bangalore, India 1

Fred Asiri LCWS 2006- Bangalore, India 1

Back-up Material for Discussion Purposes Fred Asiri LCWS 2006- Bangalore, India 1

Installation Systems Concept Development Step Installation Phases & Sequencing

Installation Systems Concept Development Step Installation Phases & Sequencing

Installation Systems Concept Development Step Installation Phases & Sequencing

Installation Systems Concept Development Step Installation Phases & Sequencing

Installation Systems Concept Development Step Installation Phases & Sequencing

Installation Systems Concept Development Step Installation Phases & Sequencing

Installation Systems Concept Development Step Installation Phases & Sequencing

Installation Systems Concept Development Step Installation Phases & Sequencing

Installation Systems Concept Development Step Installation Phases & Sequencing

Installation Systems Concept Development Step Installation Phases & Sequencing