Four Winds Condominium Association August 2, 2017

Slides:



Advertisements
Similar presentations
County of Fairfax, Virginia Department of Transportation Transportation Funding Alternatives and Outreach Board Transportation Committee June 12, 2012.
Advertisements

I-66 Corridor Improvements Outside the Beltway CTB Briefing
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
August 18, 2011 State Route 99 Auxiliary Lanes Project Route 32 to East 1st Avenue.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
US 101 Corridor Mobility Master Plan Agenda Item B-1 San Luis Obispo Council of Governments Board Meeting August 6, 2014 – B-1.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
August 7, 2013 Luke Lortie, EIT Jerry Auge, PE
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
TRANSPORTATION POLICY COMMITTEE FINAL REPORT AND RECOMMENDATIONS PROFESSIONAL AND TECHNICAL STAFF COUNCIL ALUMNI CENTER APRIL 2, 2003.
Presentation to the Subcommittee on Highways and Transit and the House Committee on Transportation and Infrastructure Peggy Catlin, Deputy Executive Director.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
PWC Quarterly Transportation Report DATA Roundtable June 17, 2015 Rick Canizales – Chief Department of Transportation.
Project Briefing Metropolitan Washington Council of Governments Transportation Policy Board Project Briefing Metropolitan Washington Council of Governments.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
May 1, 2014 East Gude Drive Pedestrian Road Safety Audit Stakeholder Pedestrian Safety Meeting.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Public Hearing PROPOSED HIGHWAY IMPROVEMENTS I-95 DEFENSE ACCESS ROADS RAMPS TO THE ENGINEER PROVING GROUND Fort Belvoir, Virginia AUGUST 20, 2008.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
Freeway Congestion In The Washington Region Presentation to National Capital Region Transportation Planning Board February 15, 2006 Item # 9.
County of Fairfax, Virginia Department of Transportation 1 Requirements for Pedestrian Improvements on Road Projects in the Board’s Six Year Priority Plan.
I-15 Express Lanes Project January 2012 I-15 Express Lanes Project January 2012.
Solar Power Project at the Sacramento Regional Wastewater Treatment Plant August 26, 2015.
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
Multnomah County Central Courthouse Site Due Diligence Update April 9, 2015 JD Deschamps Mike Pullen Mike Day.
County of Fairfax, Virginia Department of Transportation Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation.
I-66 OUTSIDE THE BELTWAY Shrevecrest HOA JUNE 21, Susan Shaw, P. E
Englewood Mews HOA May 23, 2017 Michelle Holland, Megaprojects Communication Manager Virginia Department of Transportation John Morse, I-66 Project.
Using Public-Private Partnerships to Move More People The Story of HOT Lanes in Northern Virginia January 30, 2017 Morteza Farajian, Ph.D.
Integrating Transit and Highway Solutions In High Volume Corridors
Update of Transportation Priorities Plan
The Central Avenue Connector Trail
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Hazel Avenue Widening Project Presentation To CGSA April 25, 2017
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
Project Status & Right-of-Way Acquisition
Col. Pike Multimodal: About the Project
I-280 Corridor Study and I-280/Winchester Blvd Project
U.S. 98 (State RoaD 30) Project Development & Environment (PD&E) Study
Facebook Campus Expansion Project EIR
Project Status Update I-680 Southbound HOV Gap Closure Project Environmental Phase September 2011 PARSONS.
Project Overview Multimodal improvements to 22.5 miles of I-66
The Oakton Condominium Association September 12, 2017
Draft Transportation Element September 6, 2017
I-66 Outside the Beltway Design Public Hearing Meetings November 13, 14 & Susan Shaw, P.E., Megaprojects Director Virginia Department of.
SR 60/Kennedy Boulevard and Jackson Street Resurfacing Projects
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Transportation Management Plan Modernization Project
Update on Route 1 Efforts Transportation Advisory Committee October 20, 2015 Leonard Wolfenstein, FCDOT Jane Rosenbaum, FCDOT Doug Miller, FCDOT Department.
Florida Transportation Commission FY 2009
Slugging in the I-395 Corridor
Board Transportation Committee October 13, 2015
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Quarterly Transportation Report 4th Quarter 2011 October 11, 2011
Issaquah-Fall City Road
Responsibilities and FUNDING
Lower Makefield Township Community Meeting
SR 400 Express Lanes: Market Sounding
2040 Long Range Transportation Plan Update
Endorsement of the Recommended Design Concept (Preferred Alternative) for Transforming I-66 Outside the Beltway Board Transportation Committee October.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Meadow Lake Boulevard Street Extension Project
Harbour Island Force Main Replacement
Preparing for Our Future
Presentation transcript:

Four Winds Condominium Association August 2, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Steve Hankins, P.E., Chief Infrastructure Officer I-66 Express Mobility Partners

Update on Project Design Timeline and Process Going Forward Q&A Tonight’s Agenda Project Overview Update on Project Design Timeline and Process Going Forward Q&A 2

Project Overview Multimodal improvements to 22.5 miles of I-66 Median space reserved for future transit 2 express lanes in each direction from I-495 (Capital Beltway) to Gainesville (University Boulevard) Improved park and ride options with access to express lanes Shared use bike and pedestrian trails – integrated with existing trails 3 general purpose lanes in each direction HOV and transit access to express lanes 3

Where We Are In Design Process July 2016 VDOT Design Concepts and RFP Summer 2017 Concept Adjustments Late 2017 Construction Start-up Activities November 2016 Partner Selected (I-66 Express Mobility Partners) TODAY October 2016 Technical Proposals Submitted from Two Teams Including Alternative Technical Concepts (ATC’s) June 2017 Public Information Meetings Fall 2017 Public Information Meeting Summer 2017 Environmental and Traffic analyses of concepts Early 2018 Design Public Hearings 4

Right of Way ACTIVITY To Date and Beyond 2018 Outreach and letters to impacted landowners – January through June 2018 Appraisals and interviews with property owners Estimated 75-90 days between appraisals and offers for properties Acquisition negotiations Key objective to minimize right of way impact on communities 200 property owners (commercial and residential) notified of access needs and surveys – March 2017 Initiated one-on-one contact with residential relocation owners – spring 2017 Survey work -- April through September 2017 Design Public Hearing – late fall 2017 5

NEPA and Preliminary Design Noise Analysis Process Identify noise receptors Perform noise measurements at representative receptors along the corridor Perform noise modeling Identify impacts (is noise mitigation warranted?) Design and assess mitigation (typically noise walls) Is the wall feasible? Is the wall reasonable? Noise walls were shown in preliminary concept plans in 2015 Confirm noise study results and perform updated noise analyses based upon updated concept plans and traffic analyses Present noise study results and noise wall locations at design public hearings in fall 2017 Solicit public input from benefited property owners and renters (voting process) Incorporate approved noise walls into the final road design construction plans NEPA and Preliminary Design FINAL DESIGN 6

Noise Walls in Your Community If your community has a noise wall today, you will have one in the future Replacement walls will be at same height or higher than existing walls and when a wall is removed work must be continuous until replacement (240 day goal) Benefitted property owners (or tenants) will be consulted prior to any new walls being installed (voting process) 7

Noise Walls Sample Noise Barriers Under Construction Sample Completed Noise Barriers 8

Bicycle and Pedestrian Trails Shared use trails along I-66 that integrate with County and Park trails Near homes, the path will be on the I-66 side of the noise wall Along I-66, concrete barrier with fence will separate the trail from the roadway 9

Addressing Visual Aesthetics Comprehensive Agreement calls for a sensitive approach to address aesthetic considerations and address construction impacts FAM and I-66 EMP will work closely with any affected neighborhoods As part of the aesthetic plan, FAM and I-66 EMP will engage communities in each of the three project segments and solicit public input 10

What to Expect During Construction Construction start-up late 2017 within existing right of way Construction ramp-up spring 2018 Construction to take place throughout the 22.5 mile corridor for duration of project No lane closures on I-66 during peak periods Public will be kept informed through Transform66.org, social media, TV, radio, print media, roadway signage Provide advance construction information to adjacent communities and address issues of concern – Good Neighbor policy 11

I-66 Inside the Beltway Program Tolling during weekdays, peak hours, peak directions beginning December 2017 Eastbound: 5:30 – 9:30 a.m. and Westbound: 3:00 – 7:00 p.m. E-ZPass required for all users; E-ZPass Flex if HOV HOV2 toll-free in 2017, HOV3 toll-free when express lanes open outside Beltway in 2022 Multimodal projects benefitting I-66 users funded by toll revenue Widening I-66 eastbound between Dulles Connector Road and Fairfax Drive-Exit 71 (approximately 4 miles) – construction begins in 2018 and open in Mid-2020 Clean Special Fuel License Plate drivers traveling alone will need to pay toll unless meeting HOV requirements 12

Current Concept Plans 13 13