Container Freight Station, Utilities and Drainage at Bayport Container Terminal (RFQ-148) Brenda Trevino, P.E. Project Manager October 11, 2016.

Slides:



Advertisements
Similar presentations
PRE-QUALIFICATION/ SHORT LISTING OF CONSULTANTS PRE-QUALIFICATION/ SHORT LISTING OF CONSULTANTS.
Advertisements

Bexar County Infrastructure Services Flood Control Bexar County Infrastructure Services Flood Control Proposed 2007 Flood Control Projects BRWM Pre-Proposal.
1 Solicitations/Advertisements Solicitations/Advertisements
NEW YORK STATE DEPARTMENT OF TRANSPORTATION South Cascade Drive/Miller Road (Formerly Route 219)/ Cattaraugus Creek Design-Build Project (PIN ,
Alternative Project Delivery
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Procurement Methodology David Dale NLSL II Procurement Manager.
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
Using QBS A Qualifications-Based Selection Process Presenters: Ron Brenke, PE - QBS Manager.
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Catherine C. Dunn, P.E., N.PE, P.PE Deputy Director Port Development Prt of New Orleans Catherine C. Dunn, P.E., D.NE, D.PE Director,
Water Supply Planning Initiative State Water Commission November 22, 2004.
Developing and Issuing the RFP. Why should qualifications be your procurement focus? n Having the necessary range of capabilities is more important than.
ADOT Multimodal Planning Division Planning Assistance for Rural Areas (PARA) Program Overview December 4, 2013.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
Request for Qualifications: Design Consulting Services for Consolidated Rental Car Facility (“CONRAC”)- Airport Transit Center Presented by: Aviation Department.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
Catherine C. Dunn, P.E., N.PE, P.PE Deputy Director Port Development Prt of New Orleans Catherine C. Dunn, P.E., D.NE, D.PE Director,
Elk Run Interchange Design-Build Project S.P (TH 52) Elk Run Interchange Design-Build Project S.P (TH 52) PROJECT INFORMATIONAL MEETING.
Presented By: Jeffrey T. Folden, P.E. Assistant Chief, Innovative Contracting Division.
College of Engineering CIVE 4750 Using QBS A Qualifications-Based Selection Process Adapted from a presentation by QBS, Inc. 215 N. Walnut St. Lansing,
U.S. Army Corps of Engineers (USACE) AEC Utility Monitoring And Control Systems and Electronic Security Systems (UMCS)(ESS) Prepared for: Energy Huntsville.
WMATA Project Implementation Manual (PIM) Stage 3, Construction Chapter 200, Authority Representative, Responsibilities and Functions Presenters: David.
PLANNING, DESIGN & CONSTRUCTION RECITAL HALL PROJECT # DESIGN PROFESSIONAL SELECTION PRE-SUBMITTAL MEETING January 12, 2016.
Construction Management At Risk Process
Village of Naples and Hazlitt 1852 Vineyards Sewer Feasibility Study.
PORT OF TACOMA. Request authorization to expand the scope and increase the authorized amount of Contract No , for work associated with the WUT.
1 EASTERN MUNICIPAL WATER DISTRICT Cactus II Feeder Transmission Pipeline Joe Mouawad, PE Sr. Director of Engineering September 2, 2015.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
1 EASTERN MUNICIPAL WATER DISTRICT Quail Valley Sewer Improvements Sub-Area 9, Phase 1 Joe Mouawad, P.E. Sr. Director of Engineering October.
Designer selection procedures. Legal framework Article 3D. Procurement of Architectural, Engineering, Surveying Services, and Construction Manager at.
Southeast Rail Extension FasTracks Monitoring Committee July 14, 2015.
US Army Corps of Engineers BUILDING STRONG ® Building and Preserving Alaska’s Future Alaska District Design-Build Contracts Moolin Seminar November.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
Bi-Annual Pavement, Drainage & Dust Control Work at Industrial Park East Pre-Bid/Proposal Meeting Brenda C Trevino, PE, PMP October 18, 2016.
Director’s Progress Review Closeout Meeting
Minimum Set of Requirements for Suppliers
Pre-Bid/Proposal Meeting
Sanitary Sewer Lift Station Rehabilitation Design Services Pre-Submittal Meeting September 20, 2016.
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Case Road Sewer Joe Mouawad, P.E. October 27, 2016.
MULTI-PURPOSE DOCK GARY PAXTON INDUSTRIAL PARK | SITKA, ALASKA
Pre-Proposal Conference
Management of Placement Area at Bayport Container Terminal (RFQ-147)
Amendment to Anderson Penna Partners Contract for Contract Code Compliance Services City Council March 20, 2017.
Developing and Issuing the RFP
CAPITAL PROGRAM OVERVIEW
CSP – Remodel Gate Services Building for USDA at Bayport Terminal
Drainage Improvements at VW Yard (RFQ-101)
PRE-PROPOSAL MEETING, January 25, 2018 Contract No.:
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
Brenda C Trevino, P.E. PMP | Director, Technical & Business Analytics
Director’s Progress Review Closeout Meeting
Architectural Services RFQ
PROJECT DELIVERY METHODS
CSP # 938 REHABILITATION OF CONTAINER YARD 1 NORTH AND CONTAINER YARD 2 NORTH AT BARBOURS CUT TERMINAL Bill Aguirre, P.E. | Project Manager | Project.
OCPS CCNA SELECTION COMMITTEE TRAINING
Multi-discipline academic research science technology engineering & math (stem) building project phase 1 NAU Project No RFQ for Construction.
RFP-311 JDE Managed CNC Services
RFP – 1148 Disparity Study Services
Pre-Submittal Meeting As Needed Environmental Services RFQ
REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES TO CONDUCT A MARKET DEMAND STUDY AND BUSINESS CASE ANALYSIS FOR REDUCTION OF EMISSIONS THROUGH INTERMODAL.
PURCHASE OF MISCELLAEOUS PERSONAL SAFETY EQUIPMENT FOR BARBROURS CUT TERMINAL, BAYPORT CONTAINER TERMINAL, AND TURNING BASIN TERMINAL.
Design and Engineering Services
White Flint North Entrance Feasibility Study
Contract Award for the Colorado Street Bridge Suicide Mitigation Enhancements Project City Council May 20, 2019 Item # 7.
Brieana Reed-Harmel, Broadband Project Manager
Presentation transcript:

Container Freight Station, Utilities and Drainage at Bayport Container Terminal (RFQ-148) Brenda Trevino, P.E. Project Manager October 11, 2016

Container Freight Station, Utilities and Drainage at Bayport Container Terminal Agenda Introductions Procurement Services Selection Process Submittal Requirements Selection Criteria Tentative Procurement Schedule Scope of Services Questions

Container Freight Station, Utilities and Drainage at Bayport Container Terminal PHA Personnel: Jeff Davis – Chief of Operations Roger H. Hoh, P.E. – Director, Project & Construction Management Brenda Trevino, P.E. – Project Manager Yvette Camel-Smith – Director of Procurement Services Pedro Gonzalez – Small Business

Format and Delivery Requirements Container Freight Station, Utilities and Drainage at Bayport Container Terminal Format and Delivery Requirements RFQ Due Date: October 19, 2016 Before 11:00 A.M. Late Submittals Will Not Be Evaluated Eight (8) Hard Copies & 1 Electronic Copy

SELECTION PROCESS 1st 2nd 3rd Internal preliminary rank and evaluate meeting, short listing firms/teams 2nd Short listed firms/teams may personally present their qualifications to PHA 3rd PHA will select most highly qualified firm/team from short list based on demonstration competence and qualifications (Commission Award)

SUBMITTAL REQUIREMENTS Format & Delivery Example: Completeness of requested information; organization and ease of identifying content Corporate Expectation of Respondent Example: Proof of licensing and registration; required ownership information; list of similar projects completed by firm within the last 5 years Experience of Staff Example: Qualified individuals with backgrounds in similar projects; identification of current workload; Texas PE Project Manager A B C

SUBMITTAL REQUIREMENTS(Cont’d) Project Team Organization Example: Project organization chart; firm/team functions and responsibilities Performance Plan Example: Details of the methods of accomplish project requirements Other Benefits Example: Unique or special processes; special staff qualifications or capabilities; special technical utilization D E F

SELECTION CRITERIA RELATIVE WEIGHT 25% 40% 20% 15% 100% CRITERIA RESPONDENT’S REPUTATIONS AND QUALITY OF SERVICES PERSONNEL QUALIFICATIONS AND EXPERIENCE PERFORMANCE PLAN AND OTHER BENEFITS OVERALL COMPLIANCE WITH PORT AUTHORITY POLICIES TOTAL RELATIVE WEIGHT 25% 40% 20% 15% 100%

TENTATIVE PROCUREMENT SCHEDULE (SUBJECT TO CHANGE) October 19, 2016 RFQ Due Date October 20, 2016 to November 17, 2016 PHA Evaluation Period December 13, 2016 or January 24, 2017 Port Commission Meeting to Award Contract

Container Freight Station, Utilities and Drainage at Bayport Container Terminal Background: The Port of Houston Authority has developed a Master Plan that requires the development of engineering recommendations into preliminary and final design drawings, specifications and supporting documents for procurement of construction to install utilities related to future business opportunities along Freight Station Road and the Bayport Terminal south of Port Road. Engineering services will be required to incorporate the recommendations from the Master Plan, geotechnical, environmental, permitting, rail, communications, safety, security and operational considerations into the utilities project. Scope of Services: Utilize existing Master Plan reports and Special Studies as background to understand the requirements of the project Perform additional specific topographical and geotechnical investigations to determine the design requirements for the utilities for the PHA properties south of Port Road Perform a brief alternatives analysis for use of the information provided Provide a utility installation plan with phasing Coordinate with the appropriate agencies, where required, to approve the plan and provide a road map for any permitting required Provide preliminary design documents (30% level), if authorized separately Prepare construction documents of selected option(s), if authorized separately Provide construction phase services, if authorized separately

Container Freight Station, Utilities and Drainage at Bayport Container Terminal

Container Freight Station, Utilities and Drainage at Bayport Container Terminal

Container Freight Station, Utilities and Drainage at Bayport Container Terminal

Thank You & Questions