FPix DCS Subgroup Report

Slides:



Advertisements
Similar presentations
Sezione di Bari September 16, 2002D. Elia - DCS workshop / ALICE week 1 SPD PS system and Controls Domenico Elia, INFN-Bari.
Advertisements

Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
Experiment Control Systems at the LHC An Overview of the System Architecture An Overview of the System Architecture JCOP Framework Overview JCOP Framework.
CMS Tracker Week – Module Test Meeting – July 2003 – Patrick Gartung 1 Long term rod testing software Patrick Gartung University of California, Riverside.
CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 1 Status of US long term module testing Patrick Gartung University of California,
8/11/2006 FPIX TB meeting L. Perera 1 Pixel Power Supply Response Measurement Lalith Perera - Univ. of Iowa Carlos Florez, Simon Kwan, Charles Newsom,
The CMS Pixel PLC Code1 Christian Veelken UC Davis last updated 03/05/08.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
MDT PS DCS for ATLAS Eleni Mountricha
S.Sergeev (JINR). Tracker consists of  4 chambers of 4 views each In total ~7200 drift tubes (~450 per view) To be controlled/monitored  HV system.
TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU Chambers, detector ELMB
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status Sam Burke UCSB HEP Group.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
ECAL Prototype DCS system using PVSS Günther Dissertori (for Alison Lister) ETHZ
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
XXVI workshop on resent developments in High Energy Physics and Cosmology Ancient Olympia,16-19 April 2008 Tsarouchas Charilaos NTUA Detector Control System.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
CMS ECAL DCS 10.Oct S.Zelepoukine ICALEPCS CMS ECAL DCS 1 The Detector Control System for the Electromagnetic Calorimeter of the CMS Experiment.
NA62 straw tracker DCS Straw tracker overview Bulk power supply Power supply distribution and monitoring LV + monitoring HV Temperature monitoring Gas.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
G. Dissertori ETHZ CMS Electronics ECAL DCS Software Planning G. Dissertori ETHZ
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
Mitglied der Helmholtz-Gemeinschaft PANDA MVD Slow Control Issues Harald Kleines, Forschungszentrum Jülich, ZEA-2.
Pixel Action Matrix C. Newsom July 15, Overview Critical Parameters Initial Discussion – Top 6 critical failures Discussion - Detailed Documentation.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO RCS Review Meeting ― September 2 nd, 2003.
The Maraton LV system Michela Lenzi INFN Firenze Thanks to V. Bocci, P. Ciambrone, A. Sciubba LV Power Supply RCM AC/DC converter.
Detector Control System
Tracker Control System – TCS & Tracker Safety System – TSS of CMS
Tracker Control System – TCS & Tracker Safety System – TSS of CMS
TOF Low Voltage and High Voltage Systems Vahe Ghazikhanian UCLA Department of Physics and Astronomy V. Ghazikhanian July 21, 2005.
LKr status R. Fantechi.
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
ProtoDUNE SP – Slow control Status
Institute of Nuclear Physics Polish Academy of Sciences
DCS WG report 9/09/11 FV.
Christian Veelken last updated 11/09/06
ATLAS MDT HV – LV Detector Control System (DCS)
CMS-ECAL DCS Prototype
Electrical and electronic systems projects
HAPS Controls Glen White ATF2 Software Review Workshop, LAL, June 2008
DCS WG report 9/09/11 FV.
Robert Gomez-Reino Garrido
A Study of the Tracker DCS
RPC Detector Control System
TPC Detector Control System
HV-LV-DCS Status NEWS DCS Endcap Integration
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System: towards the final system
RPC Detector Control System
ACOE347 – Data Acquisition and Automation Systems
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Tools for the Automation of large distributed control systems
Pierluigi Paolucci & Giovanni Polese
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
Needed for Team A on -End
Presentation transcript:

FPix DCS Subgroup Report Charles Newsom/JC Yun 10/12/05 Introduction Current status Plan

CMSTracker System

CMS RCMS/DCS Layout CMS RCMS PVSS Oracle Dbase U. Joshi PVSS SOAP Interface Oracle Dbase PVSS SOAP Interface FwdPixel Supervisor BarPixel Supervisor Tracker Supervisor BarPixel PVSS FwdPixel PVSS Tracker PVSS Node (CAEN) Node (PLC) Node FwdPixFEC SupVsr FwdPixFED SupVsr FwdPixTTC SupVsr SOAP I2O FEC DB FED DB TTC PVSS TCP/IP U. Joshi

FPix DCS system hardware Control CAEN HV, LV Monitor Siemens PLC -> temperature of port cards -> humidity Interlock -> when temp, humidity out of bound (hardwired)

FPix DCS software + monitor and control CAEN, Siemens PLC etc. + communication with CMS DCS through PVSS + communication with RCMS XDaq + update DCS info into Oracle Database + design run conditions and HV, LV control scheme + FPix main control panel design --- follow CERN system as much as we can …. + software interlock system + software trigger inhibit ( out of bound etc. ) + heartbeat checking mechanism (DCS supervisor) + ..

PVSS course at FNAL (7/25 - 8/5 : 2 weeks) The first PVSS class offered at Fermilab 3 sections ( PVSS, JCOP framework, Finite State Machine) About 10 people took the class taught by Sascha Schmeling from CERN. During the class, Christian succeed in controlling a Chiller with PVSS through RS232 communication. Also we could control CAEN system later.

FPix DCS/PVSS group Lucien Cremaldi, Mike Eads, Dongwook Kim, Sergey Los, Sudhir Malik, Charles Newsom, David Sanders, Ping Tan, Christian Veelken, JC Yun ( UC Davis, FNAL, Johns Hopkins, Iowa, Mississippi, Nebraska, Northwestern ) Contact person: Charles Newsom, JC Yun(software) Biweekly FPix DCS/PVSS meeting: Tuesday 11:00 – 12:30 at WH11SE

FPix DCS/PVSS work plan 1) Testbeam setup -> to gain experience -> upgrade testbeam slow control system 2) SiDet setup -> for integrated system setup: XDaq – PVSS – Database - DSS 3) FPix setup -> commissioning FPix system

Testbeam setup Work done: Work to be done: PVSS setup in MTest testbeam area: * PVSS installed on a dedicated PC * CAEN system: through PVSS we can control and monitor HV and LV channels * Chiller: we can turn on an off running PVSS code --- this is through serial communication * Siemens S7 PLC: * Initialized the PLC through serial pc adaptor. * through ethernet OPC, PVSS can talk to the PLC Work to be done: * Siemens S7 PLC: * humidity, temp, step motor control, simple interlock system * Alarms (sounds, automated e-mail (??) etc.)

Hardware Siemens S7/300 Programable Logic Controller (Interlock Logic) Ethernet Interface Module 8x16 Bit RTD Analog Input Module (Temperature Sensors) 8x13 Bit general Purpose Analog Input/Output Module (Humidity Sensor, Peltier Element) 16x Digital Input/Output Module (Booster Pump) three Function Modules for Step Motor Control 24V Power Supply Module CAEN SY 2527 Crate with HV/LV Boards Other NESLAB RTE-140 Chiller with RS-232 Interface

Current Test Installation Programable Logic Controller Ethernet Interface Module 16x Digital Input/Output Module 24V Power Supply Module Christian Veelken

Testbeam PVSS work assignment CAEN --- Ping Serial Chiller --- Christian Siemens Peltier Humidity --- Mike, Sudhir Temp Motor control --- Dongwook Alarms, Intertask communications --- jc Main panel design --- Christian

SiDet setup Will clone testbeam setup * Control CAEN HV, LV * monitor temp, humidity (Siemens) * A simple interlock system + communication to XDaq + Oracle database Charge: DCS supervisor: Christian Veelken XDaq supervisor: Ping Tan / Dongwook Kim DCS – XDaq interface: Dongwook Kim Schedule: first try out in 06/2005

Lucien Cremaldi

XDAQ2PVSS operation XDAQ DCS From Peter Rosinsky Dongwook Kim PVSS REQ client XDAQ2PVSS RESP asynchronous single client/single request From Peter Rosinsky Dongwook Kim

Discussion Finish up testbeam setup and move on to SiDet system ASAP. Need more interaction with other CMS DCS groups - to conform to CERN, CMS standards as much as we can. We are making a good progress but there are a lot to learn.