TITLE PAGE: Project Title

Slides:



Advertisements
Similar presentations
February 6, 2008 Phase 2: Achieving our Visions of 2050 In cooperation with:
Advertisements

From – A Report of the Connecticut Regional Institute for the 21 st Century by Michael Gallis & Associates, 1999 (known as the “Gallis Report”) Knowledge.
Important Notes for Sustainable Streets Power Point users: (1) Copyright permission for many of the images included in this file has been granted to Ellen.
1 How to Succeed in Statewide and MPO Transportation Planning.
Public Transit Division Discretionary Grant Programs.
Transportation Alternatives. MAP-21 & TAP MAP-21 requires the following with respect to the allocation & selection of projects: ◦TAP funds sub-allocated.
Austin Strategic Mobility Plan Apr 19, 2010 Program Overview.
Forest Plan Revision Using the 2012 Planning Rule Process Overview Steps and Expectations (I don’t know….but I’ve been told…if the horse don’t pull….you.
1 ACCESS to QUALITY CULTURAL, RECREATIONAL, EDUCATIONAL and LEISURE OPPORTUNITIES Collaboratively encourages and supports opportunities to focus on the.
2030 Long-Range Transportation Plan Ithaca-Tompkins County Transportation Council Public MeetingFernando de Aragón TCPL October 15, 2008Staff Director.
Funding Levels Similar funding levels to the Transportation Enhancement Activities under SAFETEA-LU: FY 2013: $808,760,000 FY 2014: $819,900,000 Total.
Multimodal Corridor Plan BCC Discussion Item Transportation Planning Division August 19, 2014.
RECREATIONAL TRAILS PROGRAM MAUREEN NEIGHBORS, COMMUNITY SERVICES UNIT CHIEF CRYSTAL DAVIS, RECREATION AND CONSERVATION PROGRAMS MANAGER.
Trail Funding Sources & General Information
Quality Region Principles The New Visions Plan addresses the region’s quality of life in a number of important ways and provides a framework for improving.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Land Use Study for the Community of Winchester July 9, 2012.
Effective Transportation Planning City of Seattle, WA.
ADOT Multimodal Planning Division Planning Assistance for Rural Areas (PARA) Program Overview December 4, 2013.
Comprehensive Plan Update Kevin O’Neill Seattle Bicycle Advisory Board September 2, 2015.
Identifying Community Assets and Resources
RESOURCE ALLOCATION IN THE HOUSTON-GALVESTON AREA NATIONAL FORUM ON PERFORMANCE- BASED PLANNING AND PROGRAMMING.
PRESENTED BY PRISCILLA MARTINEZ-VELEZ CALIFORNIA DEPARTMENT OF TRANSPORTATION DIVISION OF TRANSPORTATION PLANNING SACRAMENTO, CA (916)
Planning and Sustainability Paul Farmer American Planning Association M6: Protecting the Urban Environment and Historical and Cultural Heritage.
Environmental Justice: Context Sensitive Planning Grant Program California Department of Transportation Division of Transportation Planning Office of Community.
200/768_K 0 Sustainable Growth & Development Subcommittee Report Committee for a Sustainable Emerald Coast May 17, 2007.
TRANSPORTATION PLANNING PERFORMANCE MEASUREMENT USING GIS TYLER MEYER, AICP 2015 AMPO Conference Clark County, NV October 2015.
Presentation title | Date. Who We Are Building a Healthier Heartland (BHH)  Super-coalition of local and national partners that promotes policy, systems.
PennDOT’s Transportation Alternatives Program November 16, 2015.
BLACKWATER HERITAGE STATE TRAIL By Vernon Compton November 13, 2015 Emerald Coast Transportation Symposium.
Urban Bicycle Networks Throughout Virginia I. Introduction This multimodal investment network is the incorporation of four urban bicycle studies and plans.
The Kern Regional Transportation Plan A Vision and Guidebook for Kern County in 2025.
Active Transportation Program California Transportation Commission Mitch Weiss 01/14/141.
Livingston County Transportation Connectivity Plan Final Report December 2013.
2015 CLARENDON TOWN PLAN Barbara Noyes Pulling Rutland Regional Planning Commission.
Department of Transportation and the Corporation for National and Community Service: Engaging Corps.
Buena Park General Plan Update Overview Presentation.
Environmental Sustainability Program Overview Report
Carlsbad Policies, Strategies & Projects
FAST Act Overview $305 billion 5 year bill – FY ‘16 – FY ’20
Finance Committee & City Council October 10, 2016
Office of Greenways & Trails
Zoning and Neighborhood Design
Regional Roads Committee
What is the Regional Transportation Plan?
Transit Development Design Guidelines Update May 2016
Overview of Changing the Physical Structure of the Community
Nolanville Main Street Sidewalk & Bicycle Connectivity
U.S. Department of Housing and Urban Development
Draft Transportation Element September 6, 2017
TITLE PAGE: Project Title
Texas Department of Transportation
September 2011 Public Open Houses
FHWA Bicycle and Pedestrian Program
Transportation Alternatives (TA) Set-aside
Creating a P.L Plan.
Dana Heiberg, Senior Planner February 5, 2018
Chris Metka 2017 Statewide Conference on Heritage ???
September 2011 Public Open Houses
Chapter 5. The Transportation-Planning Process
Transportation Task Force Mission and Vision
Status Report on Rochester’s DMC Transportation Plan
Meadow Lake Boulevard Street Extension Project
Recreational Trails Program (RTP)
The relation between Human behavior and the built environment.
MPO Board Presentation
Members’ Workshop Wednesday 17th April 2019 Woodhill House Aberdeen
Safe Routes to School John Schaefer State Coordinator.
What follows after approval of Active Transportation
Focused General Plan Update Status Report & Visioning Overview
Presentation transcript:

TITLE PAGE: Project Title Member Entity Presenter Name Type of Project (TAP or RTP) Northwest New Mexico Regional Transportation Planning Organization NWRTPO December 14, 2016

Project Location Insert Location Maps Insert Project Maps Pictures If you need assistance with Maps, please contact Carrie House at (505) 722-42327 or chouse@nwnmcog.org

Problem, Need, and Supporting Data Succinctly state the problem and need Use data where possible If you need assistance with Data, please contact Carrie House at (505) 722-42327 or chouse@nwnmcog.org

1.1 Project Action Plan & Phasing Please describe your action plan and timeline and/or phasing approach to this project List other planning documents that this project is consistent with. Examples in Active Transportation and Recreational Programs Guide.

1.2 Public Support Please list your documented public support could include but not limited to: resolutions, petitions, public meeting documentation, support letters, news articles, etc.

1.3 Matching Funds Please list your available and documented matching funds or in-kind commitments Please indicate if proposed, approved, or pending

1.4 Readiness Documents, Clearances, and/or Certifications (Page 2 of 4 on PIF) Project Readiness (List as many that apply) Date of Completion, Started, or Anticipation of Completion PER Design (%) Environmental ROW Utility Railroad ITS Cost Estimate Engineering Contract Bid Documents

1.5 Operations, Maintenace, and Replacement Plan Please describe your OM&R Plan and documented commitment for O&M for this project

2.1 Economic Vitality (explanation in RTP/TAP Application Form) Please highlight key bullet points from narrative. In addition to achieving transportation and/or recreational goals, TAP and RTP projects may provide positive economic impacts to a community. The economic vitality of an eligible project is measured through economic impact to local, regional, or statewide economic development efforts. Consider how the project interacts with activity centers, employment generators, or other economic development activities. For example, a potential project, such as a regional trail, could provide economic benefits to nearby local businesses by attracting tourists. Application Question: Provide detailed information on how your eligible project will benefit local, regional, and/or state economic development efforts. Please cite and provide supporting documents or studies as necessary

2.2 Safety and Security (explanation in RTP/TAP Application Form) Please highlight key bullet points from narrative. The livability of a community is related to safety and security. A community where it is safe to walk, bicycle, use transit, and access and enjoy recreational trails will have more people on the streets interacting with neighbors, visiting businesses, walking to school, and enjoying local amenities like parks and natural areas. For example, installing solar lighting along a sidewalk or path to a park or school could increase the safety and security of children walking to the facility. Application Question: Please explain any safety issues you are trying to address and provide any available data. Describe how your eligible project will increase the safety and security of different user groups by making it safer for them to walk, bicycle, access public transit, and/or access and enjoy recreational trails. Please cite and provide supporting documents or studies as necessary.

Please highlight key bullet points from narrative. 2.3 Accessibility and Mobility through Integration and Connectivity (explanation in RTP/TAP Application Form) Please highlight key bullet points from narrative. Access to destinations and people’s mobility are defined by the integration and connectivity of a community’s transportation system (including recreational trail facilities). Gaps exist in our transportation systems, creating congestion and making it difficult for people to access necessary services, such as a grocery store, hospital, or job centers. Integrating alternative transportation networks into a community or fixing gaps in existing systems can increase people’s mobility and access to necessary services and recreational opportunities. This factor also considers intermodal connectivity between pedestrian, bicycle, public transit, and park-and-ride infrastructure. For example, completion of a sidewalk between a transit stop and a nearby employment center would address an existing gap in the system, making the employment center more accessible and increasing mobility of transit-users. In addition, this would address intermodal connectivity. Note: all Federally-funded transportation projects must comply with the Americans with Disabilities Act (ADA) and Public Rights of Way Accessibility Guidelines (PROWAG). Application Question: Please describe how your eligible project will increase accessibility and mobility through integration and connectivity of transportation and recreation networks. Please cite and provide supporting documents or studies as necessary

Please highlight key bullet points from narrative. 2.4 Protection and Enhancement of the Environment (explanation in RTP/TAP Application Form) Please highlight key bullet points from narrative. This factor emphasizes how eligible projects can protect and enhance the environment, whether through the promotion of energy or water conservation, quality-of-life improvements, or the funding of improvements that are consistent with land management plans or local land-use plans. Projects may promote environmental conservation in diverse ways, from reducing motorized vehicle usage, to erosion control along transportation rights-of-way or wilderness trails. Projects can also provide a broad array of quality-of-life improvements, such as access to culturally or historically significant sites, or improved community health due to increased opportunities for bicycling and walking. Through local planning processes, governments and community members articulate land-use visions and goals to improve or enhance community quality of life. These are incorporated into local planning documents. TAP and RTP projects may help communities achieve desired land-use patterns and goals as described in local planning documents. Examples of such projects could include a paved, multi-use path that increases multimodal access to a school, thus reducing motor vehicle congestion, improving air quality, and providing opportunities for daily physical activity—all of which helps improve quality of life and overall community health. Application Question: Please provide information as to how your eligible project will: a) promote environmental conservation; b) improve the quality-of-life for community residents; and c) help achieve the community’s desired land-use goals, as described in local planning documents. Please cite and provide supporting documents or studies as necessary.

Please highlight key bullet points from narrative. 2.5 Efficient System Management and Operations(explanation in RTP/TAP Application Form) Please highlight key bullet points from narrative. TAP and RTP funds are FAHP funds. Project sponsors are required by Federal law to maintain projects constructed using FAHP funds. The project sponsor must acknowledge in the Resolution of Sponsorship, or official letter (see Appendix IX), both the short-term and long-term maintenance of the TAP or RTP project. The community may also have processes and maintenance plans in place that would benefit the maintenance and overall efficient system management and operation of the project. For example, your community may have a maintenance plan for inspect-ing and re-painting crosswalks on an annual basis and a new crosswalk built with TAP funds would be integrated into this maintenance plan. Application Question: Please describe how your eligible project will promote efficient system management and operation, particularly with regard to the maintenance of the TAP- or RTP-funded improvement. Please cite and provide supporting documents or studies as necessary.

2.6 System Preservation (explanation in RTP/TAP Application Form) Please highlight key bullet points from narrative. The costs of maintaining existing infrastructure can be burdensome to communities. As such, building new infrastructure in certain communities is not always the most appropriate course of action. Certain projects may preserve or enhance existing infrastructure, thus eliminating additional costs to local communities. Potential projects may include safety improvements to existing infrastructure or adaptive reuse of existing infrastructure. For example, your community has a closed bridge that is no longer safe for motor vehicles, but the community wants to convert the use of the bridge to a pedestrian and bicycle facility. Application Question: Please explain how your eligible project will enhance, preserve, or offer an adaptive reuse of existing infrastructure. Please cite and provide supporting documents or studies as necessary.

Funding Information (Page 2 in PIF) Activity Federal Local Tribal Other Total Preliminary Engineering Right-of-Way Construction Management Construction

Questions “When we all work together, it is easier to get out of the mud”