The Campus 2.06 Acres or 89,734 sq ft of Land 25,058 sq ft Church Building 4,239 sq ft Sanctuary 497 sq ft Balcony 20,322 sq ft Multipurpose.

Slides:



Advertisements
Similar presentations
St Andrews School A Tour Of The School By Daniella.
Advertisements

Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Welcome To The New Ebenezer Baptist Church Located at 1200 & 1236 Gregg Street & 1921 Lady Street.
Park School Modernization Summer New paint, new glass, new landscape, new flagpole, and new paving Before After Entry.
Welcome to Gladstone Primary School. We are a large school set over two sites… Juniors Infants & Nursery.
How to get from the Nebraska Parking lot to the Mary Graydon Center.
N EXISTING FACILITIES BUILDING “A” -Principal’s Office -Workroom -(9) 3 RD Grade Classrooms - (4) 4 TH Grade Classrooms -Life Skills Classroom -Title.
Upper Level Copy Room Office Sanctuary Pastor’s Study To Epworth House Kitchen-Acolyte Lobby Courtyard Wesley Room Prayer Room Janitor Storage Nursery.
Congregation Survey Summary & Program Statement KATY first united methodist church August 30, 2009.
HADDON TOWNSHIP SCHOOLS ELEVATORADDITION FENCE REPLACEMENT REPLACEMENT REPAIR AND RECOAT ASPHALT PLAGROUND SURFACE REPLACE CONCRETE CURBING AROUND THE.
NEW MERCY CENTER. Dramatic 35 foot tall Bright Silver Building entrance cross. Recognition by custom engraved plaque. This Cross will be up lit at night.
The Kingdom Center Healing Streams Church & PAC Multi-Service Center.
Church Renovation/ Expansion Proposals Willowdale.
OFFICE SPACE | RETAIL AREA | RESTAURANT | FOOD COURT | BANQUET HALL.
3/22 Business English. Go up Turn left/right In front of Above/Below under Near/close to Opposite Next to Upper left/upper right Lower left/lower right.
4900 S ROUTE 31 CRYSTAL LAKE 1. AERIAL 2 PROPERTY HISTORY 3 Constructed by Sherman Hospital in 1978 Now Owned by Advocate Group.
WISH LISTS. GHS Install building wide phone system w/voic Remodel Office area w/AC Enlarge parking lot near LC Replace asbestos floor tile Pave gravel.
Proposed Alternative to the Curved Wall Concept Friends of the Orange Depot By J David Derosier 1.
Kitchen: fridge resting on debris blocking entrance to utility room.
UC Santa Cruz Engineering Building 2 69,000 ASF ~$47M.
A LL D ULLES A REA M USLIM S OCIETY. ADAMS CORE VALUES.
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
Property: Block of Norzagaray-San Justo-San Sebastian Exact address: #251 Calle San Sebastian Viejo San Juan, PR.
Shady Acres Dallas Township Zoning. The Concept The following project will be displayed as a proposed development in the Dallas Township. It will be composed.
Houston TranStar Building Expansion 2009 Status. Aerial of Existing Building.
Layout as at 1 st July 2007 Public Rooms Offices/Reception Museum Cafe Friends of Museum Shop Physiotherapist Art Exhibition Staff Room Library.
BRANDON BAPTIST CHURCH MASTER PLAN 8/31/2015 BRANDON BAPTIST MASTER PLAN BRANDON BAPTIST CHURCH MASTER PLAN 1.
Schematic Lighting Design Natty Boh Building Baltimore, Maryland Eric Singley Penn State University Architectural Engineering.
BUILDING ANALYSIS Established in PG5 is a diverse building, consisting of the following:  Parking garage  Classrooms  food court (seats 300) 
October 15, 2012 Oakwood Presbyterian Church Feasibility Study Design Meeting 2 Copyright Hoffman Architecture /02/20121.
Greater Mt. Zion Baptist Church 26 January 2014 Jackson Galloway Associates, PLLC.
Family Life Center / Youth Center 201 Music Office 216 – 217 Children’s Classroom 202 – 203 future use 218 Kid’s Klub 204 old sanctuary 219 – 220 Storage.
Learning, Health, and Safety Capital Project Alternates and Change Order
Coastal Commission Staff Presentation Item W11a, August 10, 2011 Hearing Applicants: Cheryl Pitt + Jeanne Harris Location: 614 Avenida Victoria, San Clemente.
Library Renovation Projects Capital Improvement Plan 2009 – 2014.
Birds Eye view of the Vidyalaya. Entrance of the Vidyalaya.
Sauriol Bohde Wagner architects and associates, inc Garfield Road Macomb, Michigan ph fx.
St. Luke Lutheran Church
Holy Family Tour “As it Pertains to X-ray”
KENDRIYA VIDYALAYA DUNGARPUR (RAJASTHAN)
Fire Drill Fire Warden Training.
H A L L x x X = IN CASE OF FIRE DO NOT ENTER ROOMS x x x x x x x
Penn Medicine Chester County Hospital
Columbus State Community College
From Lobby Entrance: Circulation Desk with proposed café area to left
Fire Department Truth or Consequences Fire Department built a new complex in 2001 at 310 East 9th Street. This complex was setup to house an EOC/Dispatch.
Erma Ora Byrd Hall – 1st (Ground) Floor
M3 Zoned  Enterprise Zone Benefits  Located in Federal Hub Zone
1 Semester Project Design A Multi Story Office Building
Erma Ora Byrd Hall – 1st (Ground) Floor
Advisory at Altadeña The purpose of Advisory is to strengthen connections on our campus. Each Advisory teacher has a small group of students they will.
Advisory at Altadeña The purpose of Advisory is to strengthen connections on our campus. Each Advisory teacher has a small group of students they will.
*Warm up/Practice Area**
WELCOME TO WYALUSING PRESBYTERIAN CHURCH.
Welcome to Harold C. Urey Middle School
Cafeteria Entrance to media center
Cafeteria exit exit Entrance to media lobby 12
WELCOME TO WYALUSING PRESBYTERIAN CHURCH.
Recent Bond Accomplishments
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
WES Renovation Update Photo Gallery
Erma Ora Byrd Hall – 1st (Ground) Floor
Park Place Wesleyan Gala 2019
WELCOME TO WYALUSING PRESBYTERIAN CHURCH.
Comparative Market Analysis - Commercial
WELCOME TO WYALUSING PRESBYTERIAN CHURCH.
WELCOME TO WYALUSING PRESBYTERIAN CHURCH.
LEE ACRES CHURCH OF CHRIST TUPELO, MISSISSIPPI
A. Write the correct numbers !
Motherhouse Renovations
Presentation transcript:

Welcome To The New Ebenezer Baptist Church Located at 1200 & 1236 Gregg Street & 1921 Lady Street

The Campus 2.06 Acres or 89,734 sq ft of Land 25,058 sq ft Church Building 4,239 sq ft Sanctuary 497 sq ft Balcony 20,322 sq ft Multipurpose Building

Access 135.65 ft of frontage on Gregg St Two Entrances - left side parallel to Lady St - right side next to building

Mezzanine Ladies / Men’s Restrooms 497 sq ft Balcony 6 Admin offices behind Sanctuary Ladies / Men’s Restroom in the hallway behind the Sanctuary

Easy flow from Mezzanine to Sanctuary to Multipurpose Hall Ladies’ lounge between Sanctuary and Multipurpose Hall Large reception area outside the Multipurpose Hall

Multipurpose Hall Lower Level 608 person capacity Adequate Storage Two small day care / nursery rooms Full Commercial kitchen Ladies / men’s restrooms Access to elevator and stairs Drop off area access with overhang

Multipurpose Hall Upper Level Large lobby / waiting area Conference room Library Ladies / men’s restroom 10 classrooms Elevator equipment room 1 office

Outside Area 2 Asphalt parking lots Bridge connecting the parking lots 521 sq ft storage building Playground Brick retaining wall Concrete sidewalks

Front View of the Church

Front View of the Church

Sanctuary

Sanctuary / Balcony

Office Area

Office Area

Work Room

Work Room

Multipurpose Hall Lower Level

Multipurpose Video

Commercial Kitchen

Front View Of Nursery 1

Rear View Of Nursery 1

Front View Of Nursery 2

Rear View Of Nursery 2

Elevator To Upper Level

Upper Level Waiting Area

Upper Level Waiting Area

Upper Level Hallway to Classrooms

Upper Level Multipurpose Hall Computer Room Hallway Leading to Classrooms Inside Classroom

Upper Level Conference Room

Upper Level Library

Left Side Rear To Gregg Street

Rear Drop Off Area

Bridge and Storage Shed

Gervais Side Parking Lot

Bridge Connecting Parking Lots

View from Gervais Street 2

Parking Lot View From Gervais Street