Augean North Sea Services NORM & Hazardous Waste Management

Slides:



Advertisements
Similar presentations
ISO EMS OVERVIEW FOR CONTRACTORS
Advertisements

Best Available Techniques (BAT)
Managing Hazardous Waste India-EU Environment Forum Waste Management in the 21 st Century 12 November 2005 Sarah Paul Senior Policy Adviser Hazardous Waste.
Environmentally sound management of ship recycling- simple or complex? Roy Watkinson Department for Environment, Food and Rural Affairs UK Promoting Sustainable.
Regulation of Low Level Waste Management
International Atomic Energy Agency IX.4.3. Waste management.
Plant Operations. Throughput & Waste Types 2 Process Trains equating to 40,000 tonnes pa Expansion to 3 Trains will give 60,000 tonnes pa Hazardous and.
Total Reclaim Systems The Practical Application of Microemulsions (ME) Technology for Waste Minimisation.
Waste Management (Food Waste) Regulations 2009
LLWR CUSTOMER FORUM VLLW & LA-LLW SERVICE 25 th MAY 2012 The Gateway to Augean & Provider of Tailored Services.
WASTE MANAGEMENT I WASTE HIERARCHY EUROPEAN UNION FRAMEWORK WASTE DIRECTIVE DEFINITION OF WASTE + ASSOCIATED PROBLEMS 1 Environmental Law.
1 REFINERY OILY RESIDUALS COST MINIMIZATION STRATEGY DSM ENVIRONMENTAL SERVICES, INC. P.O. Box Houston, TX (281)
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
Environmental Permitting Regulations Tom Fowler – Environment Officer
TRP Chapter Chapter 4.2 Waste minimisation.
MODULE “STRATEGY DEVELOPMENT”
Bapetco NORM Control Case Study IDENTIFY ASSESS CONTROL & RECOVERY.
We are the Environment Agency. It’s our job to look after your environment and make it a better place – for you, and for future generations. The Environment.
SAFESPUR FORUM - Challenges in reducing the burden on the UK’s national Low Level Waste Repository 29 April 2009, Birchwood.
9.1 General HSE 1.Goal: zero harm to people and environment in regard of the assets and operation 2.HSE performance measured based on internal and external.
Authorization and Inspection of Cyclotron Facilities Authorization for the Decommissioning of the Facility.
1 Augean plc Hazardous waste management services.
Monitoring of Radiologically Contaminated Scrap Material in the Czech Republic Zuzana Pašková State Office for Nuclear Safety Prague, Czech Republic International.
S outh W essex W aste M inimisation G roup Wednesday 24th September 2008 Michael Hughes Technical Director Wendy Carmichael Technical Specialist Tel:
TEAM 1 NONAMECOUNTRY 1SU RUI (LEADER)CHINA 2TENG IYU LIN (PRESENTER)MALAYSIA 3MUHAMMAD TARIQ AZIZ (RAPPORTEUR)PAKISTAN 4NORAISHAH PUNGUTMALAYSIA 5MOHAMMAD.
Rank the picture below the Core on the template slide Slide title 36pt Slide subtitle 18pt Safespur Presentation Johan Langham, Project Engineer, Studsvik.
Group New Projects Related to Decommissioning. 29 th May 2008 KNPP Richard Benbow – Head of Kozloduy PMU.
Current and future challenges in disposing of LLW – the LLWR perspective SAFESPUR WORKSHOP 29 April 2009 Presented By: Chuck Conway, Head of Consignor.
NDA PhD Bursary Waste Packaging and Storage Theme Richard Guppy, RWM Ltd Sean Morgan, Sellafield Ltd 17 th September
1 Exotic Disease Response Training Introduction to Organism Management.
MODULE “COST ESTIMATION, CALCULATION AND COST CONTROL” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da.
Jim Shiach 3 rd June. My Norwegian Journey Company Background Privately Owned Company Established 2002 Employees Contractors Provide Mechanical.
Waste Management Issues for Hospitals/Healthcare Facilities.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
© 2012 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
1 A Consultancy on management of large amounts of radioactive waste after an emergency situation ~ Experience on aftermath of Fukushima Daiichi NPS accident.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
4rd Meeting of the Steering Committee on Competence of Human Resources for Regulatory Bodies Vienna, 4-7 December 2012 Current Status of the Human Resources.
Demonstrating and Promoting Best Techniques and Practices for Reducing Health Care Waste to Avoid Environmental Releases of Dioxins and Mercury Project.
Health & Safety in Construction 4A7 Design & the Built Environment John O’Connor.
FAS Training 2016 SMR 4 Food and Feed Hygiene Carrick on Shannon, Charleville, Kilkenny Integrated Controls Division 1.
DECOMMISSIONING OF NUCLEAR POWER PLANTS IN THE CZECH REPUBLIC Peter Lietava Division of Radioactive Waste and Spent Fuel Management State Office for Nuclear.
International Atomic Energy Agency V. Nys Definition and practical application of demonstration of operational and long-term safety for predisposal RWM.
Paul Fernee - Technical Advisor Industry and Waste Tech Services National Operations Technical Services Management of Air Pollution Control Residues from.
INTER TERMINALS LTD Liquid Waste Solutions for the Shale Gas Industry 18 March 2015.
Case Study Pizza GOGO Limited Rainham Essex U.K. BY-CHANDRESH TRIPATHI.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
Nuclear decommissioning: Turning waste into Wealth Disposal of low-level radiation Tzany Kokalova University of Birmingham.
Environmental Sustainability Towards Transforming Tanzania to a Middle Income Economy by 2025: The Challenges of Industrialization Eng. Prof. Rubhera RAM.
Decommissioning Opportunity for City of Dundee
SPE Introduction to Exploration and Production :
The operations challenge
ISO 14001: 2004 Environmental Management Review Presentation
Strategy for conformity of non-standard cryogenic equipment
Greater Manchester Waste Disposal Authority Our Aim is Zero Waste
Lecture : Tasks and Responsibilities in the Management of Healthcare Wastes Which one do you want ? by Dr Mohammed Ali Al Zahrani.
TENORM Study Update Presented by Rich Janati on behalf of Dave Allard
Quality Standards Security Skills Staffing.
Regional Workshop on e-waste
Average person produces 1700 lbs of MSW per year
Experience in the UK in implementing E-PRTR and Data Validation
AFPC Policy Protect its personnel, contractors,3rd parties and the environment against the hazards of exposure to ionizing radiation due to AFPC activities.
RCF Plenary Session 21 September 2018
Dealing with Waste Ad Qual Castech Ltd..
National Radioactive Waste Management Agency Bill
Infinium Energy Services
Update on TCEQ’s Role in Oil & Gas Waste Management
Industrial Emissions Directive Targeted stakeholder survey
Presentation transcript:

Augean North Sea Services NORM & Hazardous Waste Management Presented to Tayside Engineering Network June 2017

Agenda About Augean plc About Augean North Sea Services Regulation Safety & Compliance NORM Overview Waste Acceptance Decom Services Summary Dundee Overview Process Overview

Augean plc £76M Market Cap AIM Listed +300 employees Key Technical Assets: > 50% of UK Permitted Hazardous Landfill Void One of 4 High Temperature Incinerators in the UK One of 3 Permitted Radioactive Waste Landfills Leading Technologies in Waste Treatment

Augean plc Oil & Gas Waste Management Services (inc. NORM and Decommissioning) Drilling Waste Management Industrial Services High Value Manufacturing Life Sciences Clinical Refinery & Chemical Wastes Ports Waste management operators Energy from Waste Construction & Demolition Nuclear Industry NORM Treatment & Disposal Healthcare

Treatment Processes Oil & Gas Specific OBM Slops Treatment OBM Emulsion Treatment Oily Sludge Treatment NORM Treatment & Disposal Oil/Water Separation Solvent Recycling Fuels & Oil Recovery EfW High Temperature Incineration

Service Provision ANSS Waste Services Hazardous Wastes General Waste and Recyclables NORM and Radioactive Wastes Decommissioning Wastes Container Rental Technical Support Industrial Services PSV and Platform Deep Tank Cleaning HP and UHP Jetting NORM Decontamination Specialised Cleaning Oily Water Treatment Emergency Response Drilling Waste Management Offshore and Onshore Cuttings Containment Equipment and Specialised Labour Solids and Swarf Control Rena Slops Treatment Cuttings Processing Fracking Water Requirements Value Added Services

Drilling & Well Abandonment Waste Management Delivering drilling and well abandonment waste services since 1998 Services include:- Cuttings containment (pneumatic and mechanical) Cuttings processing Solids control Reduced man entry pit cleaning Swarf control Mud cooling systems Filtration services Advanced water treatment technologies with RENA RPA Services Tubular Decontamination

Specialised Industrial Services Highly Experienced Multi-Skilled Engineers Our staff cover several Skill sets Reduced Costs and POB Specialised Industrial services include:- Tanker Services Quayside vessel cleaning Deep Tank Cleaning NORM decontamination Oil & Gas Terminal full coverage cleaning and disposal Separator cleaning Augean In-house treatment & disposal Surface preparation, de-scaling, coating removal Concrete and cold cutting Sand washing services Sludge removal

Specialised Waste Services All oilfield wastes handled including; Hazardous Wastes General Waste & Recyclables NORM and NORM-contaminated wastes Wastes from decommissioning activities (e.g. Scrap Metals, sludges, piece small, front- runner, subsea, fluids etc.) 6 PPC permitted waste management centres; Aberdeen – 3 sites Dundee) Lerwick – Greenhead Base Great Yarmouth 9 x Augean Group PPC sites

NORM & RPS Services Offshore and Onshore NORM Specialists Cross Trained Multi-Skilled Engineers One man covers several services Reduced Costs Reduced POB requirement Increased understanding of wastes Our NORM-related services include:- Radiation Protection Supervisors Augean In-house treatment & disposal Casing Pulling (Bag & Tag) Produced Water Management

NORM Descaling HP / UHP Water Jetting and Descaling Advantages Use of ISO Containerised Mobile Decontamination System Carried out under RSA Authorisation Deployed on as-required basis Advantages Residues disposed on site wherever possible Disposal of both hazardous and non-hazardous NORM scales via Augeans own facilities Access to local engineering resources and metals recycling routes Can be deployed on 3rd party installations Limitations Dependent upon Concrete Pad Load Rating Permitting

Safety and Compliance 11 Years LTI Free offshore Positive and progressive HSEQ culture Senior leadership accountability - ownership at all levels Active performance monitoring ANSS is accredited as follows:- OHSAS 18001 ISO 9001 (2015) ISO 14001 (2015) PAS 99 Extensive internal and external audit program Safety & protection of the environment are our core values All our sites have “A” ratings with SEPA

Safety and Compliance Augean expects all sites to work profitably, but not by compromising health safety or compliance HSE compliance are the responsibility of every individual HSEQ Team monitor and to support the business in the achievement of high standards of health & safety and environmental compliance Site inspection: monthly, scoring system Audits to ensure compliance with IMS Non-conformances identified & actioned EA/SEPA inspections: support and preparation provided BSI audits: hosting & management

Technical Team Compliance management (H&S, Permit and IMS) Maintenance and development of licence to operate (Permitting and planning) Environmental monitoring (Coordination and interpretation) Technical and regulatory advice Training and competency testing Project support, contribution and management External affairs

Regulation & Legislation EC Waste Directives Landfill Directive Hazardous Waste DIrective Special & Hazardous Waste Regulations EU Waste Laws – where next with Brexit? Drivers in UK Waste Policy Waste Treatment and Disposal options National Waste Management Plans for England, Wales, Scotland and Northern Ireland – differences in approach

Regulation & Legislation - NORM Drive UK Waste Policy Waste Strategy for England and Wales Similar Plans for Wales, Scotland and Northern Ireland Ionising Radiation Regulations (IRR), Radiological Substances Act (RSA) UK LLW Policy – 2007 UK Strategy for the Management of Solid LLW from the Nuclear Industry – 2009 Strategy for the Management of Solid Low Level Radioactive Waste from the Non-Nuclear Industry: Anthropogenic Radionuclides – 2012 Strategy for the Management of Waste from (NORM) in the UK- 2014

Regulatory Concerns Supply Chain need to be kept Interested Urgently Need Volumes and Timeline for Generation Waste Characterisation Current Data Indicates majority of NORM is Hazardous But most would categorise as within LALLW (upto 200Bq/g) Treatment Options Limited Treatment Options – Incineration & Stabilisation Limited Radiological Capacity at Treatment Sites Disposal Options Landfill – Limited Options LLWR – Limited Radiological Capacity / Ra226 Undesired

Supply Chain Concerns SEPA Strategy for NORM Uncertain Volumes Waste Declarations Forecasts not forthcoming Uncertain Decommissioning Timelines Offshore Decommissioning Timelines not Declared Fragility of Supply Chain Enough to sustain Commercial Viability? Hazardous Content Heavy Metals (especially Mercury) Availability of Treatment and Disposal Options Incineration Landfill Engineered Vault – LLWR at Drigg

NORM Disposal & Decontamination Lerwick (quayside) Aberdeen Dundee (quayside) Port Clarence ENRMF Great Yarmouth East Kent

NORM Disposal & Decontamination Sector leader in modernising hazardous waste management practices Formed in 2004, the Group is strategically positioned to provide strong commercial and compliance-led solutions in a complex and legislative driven market. We have developed through a cycle of staged acquisitions, planning and development Established a specialist waste business in the hazardous radioactive waste markets within the UK Nuclear and Non-Nuclear Industries We actively engage with our regulators Promoting (with the ESA) the need for higher standards and the application of the waste hierarchy. Operating to modern standards and responding to regulatory change.

NORM Disposal & Facilities 3 active RSR or RSA permits at ENRMF, Port Clarence and East Kent for Disposal, Treatment and Incineration respectively. The ENRMF permit allows for disposal of up to 200Bq/g. Lifetime radiological capacity limits also apply but only a small %age has been utilised to date and >10,000Tes of Radioactive Waste has been disposed since granting of EPR Permit in May 2011. Port Clarence WRP and Soil Treatment – no specific activity limit applies under the permit however waste must be safe to process with only limited additional controls. May only receive O&G NORM and in the form of solid, sludge or relevant liquid. The conditions of the non rad permits also apply and >600 te of NORM has been processed since 2012. Port Clarence Landfill – Exempt Hazardous NORM disposal up to 10Bq/g. East Kent – Similar restrictions to Port Clarence but may also receive anthropogenic NORM.

NORM Disposal & Decontamination Facilities Dundee – Major MORM Decontamination and Decommissioning Facility Lerwick – NORM Decontamination and Waste Management Aberdeeen – NORM Waste and Contaminated Equipment Transfer Port Clarence – Ad hoc Decontamination facility

NORM Treatment Processes Stabilisation with Waste APCR Use of APCR with residual lime content Cement type Pozzolanic reaction used to bind contaminants Advantages Existing waste and landfill leachate utilised for treatment No overall increase in total waste volume Output residue suitable for disposal as WAC compliant Hazardous Waste Minimal energy usage for waste treatment – plant runs on electricity generated from landfill gas capture No offsite transport of secondary waste to final disposal Limitations Not suitable for high oil contents >20% Not suitable for high solubility or volatile organics

Waste Acceptance Processes Enquiries received by ANSS Account Manager Passed to Specialists for Feasibility & Technical Assessment Minimum information requirements must be met Waste Classification and Treatment Process recorded on SWOPS System Cost Determination Customer Quotation

Waste Acceptance Processes Customer quotation received and accepted Collection or delivery schedule agreed between Customer and ANSS Booking Confirmed Waste received and registered at Weighbridge Paperwork and monitoring checks completed Waste offloaded into Secure Storage Area Scanned copy of accepted paperwork issued to ANSS and Customer Waste mass and activity entered onto Inventory System

NORM Acceptance Processes Provision of the following information will allow for efficient enquiry turnaround; Chemical and Radiochemical analysis of scale or sludge Including Speciated TPH, PAH and Heavy Metals HRGS Alpha Spectrometry if arising from gas production Number of containers or items of equipment Container type or mass and dimensions of equipment Photographs where available Mass of waste or estimated mass of NORM Scale

NORM Acceptance Processes Waste treated via designated process Emptied containers and decontaminated equipment monitored to confirm clean Monitoring results recorded and Clearance Certificate issued Mass and activity of secondary waste recorded Secondary waste disposed to designated route Clean containers returned with Certification Decontaminated equipment returned / recycled Radioactive Waste Inventory System updated Invoices raised at appropriate Milestones Final invoice and treatment report raised

NORM Waste Treatment and Disposal Decision Tree NORM Contaminated Equipment or Tank E&C Descale / Clean Tank / Equipment I&I Oil Energy Recovery AIS Liquid Pre-Treat NORM Waste Batch WWTW Water Other Solid or Sludge Solids Wash?? Yes Repackage to suitable container At WRP if necessary ANSS Flash Point >60◦c No Incinerate High Metals Content Bio?? Yes No Yes Landfill Non-Hazardous or meeting Haz WAC Total Activity < 75MBq No No Yes No Low Soluble Hydrocarbon Content, TOC <20% Hg Content Manageable Yes Carry out Treatability Trial Fail Yes Pass No No Acceptable under Specific RA? Otherwise suitable For EK NORM Content <50Bq/g Yes Yes No Treat by Stabilisation with APCR Output Free Liquid Layer ≤10Bq/g Yes Yes Yes No Remove Liquids PC KC East Kent Tradebe Fawley

Questions?