Proposed Utility Line and Pavement Replacement Process Proposed Utility Line and Pavement Replacement Process Pre-Council June 28, 2016 Presented by: Transportation.

Slides:



Advertisements
Similar presentations
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
Advertisements

11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
ALLEGAN COUNTY PRIMARY ROAD MILLAGE AREA 2 JANUARY 21, 2014.
2009 Wyoming Street and Utility Improvements Neighborhood Informational Meeting December 18, :00 P.M. – 8:00 P.M. 6:00 P.M. – 8:00 P.M. Mark A. Erichson,
Welcome Learn more about upcoming construction activities on Cedarvale Avenue and Oak Park Avenue View display boards and speak one-on-one with staff Building.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
The Pit Crew: Strengthening the M&O and Facilities Parthership APRIL 3-6, 2013, LONG BEACH, CA.
Utah’s Use of CMGC & Project Delivery
Concrete Paving: Opportunities for Virginia Robert R. Long, Jr. Executive Director American Concrete Pavement Association Mid-Atlantic Chapter October.
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
1 CDBG Procurement Requirements For Local Officials.
Fiscal Year 2009 Rate Adjustments Presentation to FPUA Board 1 March 3, 2009.
2014 Budget Department Presentations Infrastructure Funding Options.
Design–Build Contracts G. Hardy Acree Director of Airports Sacramento County Airport System Advantages of of During Turbulent Times.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Council Policy Forum Feb. 23, 2015 CAPITAL PLANNING & INFRASTRUCTURE.
1 st Quarter 2015 Financial Report City Council Meeting June 11, 2015.
Street Maintenance Program Update City Council Work Session February 5, 2013 Department of Public Works & Transportation.
1 MnDOT Metro District Proposed Transportation Improvement Program (TIP) Amendment Metropolitan Council January 17, 2007.
Water Main Repair, Replacement and Rehabilitation (WMR3) Strategic Sourcing Team Gary Gumm, P.E., Interim Chief Operating Officer – Team Sponsor Hala Flores,
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Omaha CSO Gilmore Avenue Sewer Separation South Omaha Neighborhood Alliance May 17, 2012.
MED SR 18 Corridor Project MED PID October 13, 2015.
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
City of Burbank Burbank Unified School District. Examples of Joint Projects:  Baseball field lighting.  Tennis court lighting.  Resurfacing of tennis.
Capital Facilities Program Update San Rafael City Schools 10 May 2016.
Expanded Shave and Pave Program Roads and Parks Maintenance Department Development & Infrastructure Division October 23, 2012.
ITEM 9B Authorize a Commercial Developer Agreement with Keller Watermere, L.P., for South Village at Watermere, located south of West Southlake Boulevard.
C APITAL PROJECT FUNDING UPDATE AARON BOVOS – CHIEF FINANCIAL OFFICER 1 SEPTEMBER 29, 2015.
SEWER TRUNK LINE REHABILITATION PROJECT (Alexandria Place, Black Oak and Navy Drive) COUNCIL AGENDA ITEM 14.1.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
PUBLIC WORKS FY 2012 Proposed Budget May 24, 2012.
Evergreen Highway Corridor Update Planning Commission Workshop March 22, 2016 Jennifer Campos, Senior Planner.
STRONG NEIGHBORHOOD INITIATIVE Public Works Department January 30, 2007 Agenda item 8.01.
“BACK TO BASICS” November 2, 2010 CITY BOND ELECTION Facilities & Infrastructure Municipal Court Courthouse (Proposition 401) Municipal Services Maintenance.
I P M 1 City of Fort Worth City Council Presented by Doug Rademaker, Deputy Director, PMO Ken Hall, IPM Program Manager, CH2M HILL October 27, 2009 I n.
 Maintain a systematic approach to planning and initiating capital projects affording the opportunity to plan the location, timing, and financing of.
Joint DPW-SWB Capital Improvement Program
What is Tax Increment Financing?
Healthy Communities & Sustainable Growth
Proposed Draft Financial Plan April 10, 2017
2nd Street Drainage and Paving Improvements
City of Orinda 2017 Annual and Measure J &L Pavement Rehabilitation Projects City Projects No & 4115.
BIKE WALK CIVICS KING STREET NEIGHBORHOOD GREENWAY PILOT March 9, 2017.
The Central Avenue Connector Trail
PUBLIC WORKS DEPARTMENT
Runway Rehabilitation: Award of construction contract and acceptance of 3 grants Resolution June 22, 2009.
City of San Jacinto 7th Street Pavement Repairs
2017 Reconstruction of Northfield Street
AASHTO Subcommittee on Construction Contract Administration Section
Infrastructure Investment Needs
AUTHORIZATION TO INCREASE PURCHASE ORDER NO WITH CALE AMERICA BY $82,000 FOR A TOTAL AMOUNT NOT TO EXCEED $156,995 FOR CALE WEB OFFICE FEES AND.
Sausalito Downtown Public Restroom
Determine Reinvestment
Public Information Meeting NW 100th Street Reconstruction Project
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Emphasis on Quality Rochester’s City Owner Contract Process
Designers’ Manual Overview and Chapter Contents
Joint DPW-SWB Capital Improvement Program
Village of Elk Rapids Budget
Capital Improvement Plan
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Meadow Lake Boulevard Street Extension Project
Value Engineering In Design
Cost Containment Working Group Board Update
City of West Fargo special assessment forums
City of Santa Paula Water and Sewer Rate Study Results Public Workshop
Hoops, haddock, cascade, oriole, Ervin and valley view heights paving
Presentation transcript:

Proposed Utility Line and Pavement Replacement Process Proposed Utility Line and Pavement Replacement Process Pre-Council June 28, 2016 Presented by: Transportation and Public Works Water

2 Utility Line and Pavement Replacement Process  Description of Current Process  Proposed Changes to Procurement Process  Proposed Implementation  Questions

3 Separate Water/Sewer and Paving Replacement Contracts  Intended to minimize bid prices and maximize competition 58 pre-qualified water/sewer replacement contractors 27 pre-qualified concrete pavement contractors 13 pre-qualified asphalt pavement contractors  Warranty issues Trench settlement affecting paving performance, resulting in warranty disputes  Delays between temporary and permanent paving Utility work schedule coordination with large paving contracts

4 Separate Water/Sewer and Paving Replacement Contracts

5 Recent Utility and Paving Replacement History  2014 Bond – Year 1 (2015) 10.9 miles water/sewer replacement 8 water/sewer construction contracts, $7.6M construction costs 36.1 lane miles of street replacement 3 street replacement contracts, $13.5M construction costs  2014 Bond – Year 2 (2016) 16.1 miles water and sewer replacement 9 water/sewer replacement contracts, $11.2M construction costs 28.7 lane miles of street replacement 3 street replacement contracts, $9.2M construction costs 3 combined water/sewer/paving contracts, $7.3M cost

6 Unit Price Comparisons  Year 1 – Avg. Utility/Paving Replacement Costs Water Replacement Costs - $140/LF Sewer Replacement Costs - $127/LF Street Pulverization/Overlay Costs - $375,000/LM  Average Lane Miles per Contract = 12 miles  Year 2 – Avg. Utility/Paving Replacement Costs Water Replacement Costs - $144/LF Sewer Replacement Costs - $135/LF Street Pulverization/Overlay Costs - $425,000/LM  Average Lane Miles per Contract = 10 miles  Combined – Avg. Utility/Paving Replacement Costs Water Replacement Costs - $156/LF (10% increase) Sewer Replacement Costs - $149/LF (14% increase) Street Pulverization/Overlay Costs - $493,000/LM (23% increase)  Average Lane Miles per Contract = 2.3 miles

7 Contractor Feedback  Water and TPW Management Staff attended April 13 Tarrant County Contractor’s Association Meeting  Feedback Received from Contractor’s included: We would receive balanced unit pricing if we included mobilization costs for both utility and paving work Combining utility work with paving work would simplify the warranty response and repair Combining utility work with paving work would minimize the time between temporary and permanent pavement replacement Combined contracts could include sequencing language to further minimize impacts of utility and paving work on residential neighborhoods.

8 Proposed Procurement Process  2014 Bond – Year 3 (2017) 4 water/sewer design projects, 9 construction projects planned 7.1 miles water/sewer replacement planned 27.7 miles of street replacement planned  Combined engineering agreements Four water engineering agreements already approved by Council will be amended to include paving design costs. New water and sewer replacement project engineering agreements will include both utility and paving design (where applicable) in the engineering agreements.  Combined construction contracts Year 3, 2014 bond program – use combined contracts Water/sewer rehab projects with TPW street participation will be bid as combined projects.

9 Proposed Coordination Process  Monthly Water and TPW Staff Coordination Meeting Further facilitate the use of combined projects through strategic programming of water/sewer/street capital funds Develop single tracking tool that allows both TPW and Water to review status of on-going utility replacement projects requiring permanent pavement replacement

10 Moving Forward  Combined Projects – design and construction Water/Sewer/Street projects to be designed and constructed as combined projects over next year. Continue inter-departmental coordination meeting Track unit prices to quantify cost impacts  On-going dialogue with contracting community Incorporate input from contracting community to improve procurement process and facilitate increased interest in bidding combined projects.  Future report to Council on cost implications Report back to council on combined project unit costs in comparison to historical unit price costs Benchmark with other cities

Platypus Process

12 QUESTIONS