PORTFOLIO The most reliable solutions!. Our Clients: The most reliable solutions!

Slides:



Advertisements
Similar presentations
Ukraine, Кyiv, 2013 Presentation of LLC SERVICE-NS: Reliable and uninterrupted technical service of filling stations and petroleum storage depots, providing.
Advertisements

1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer.
DEVELOPMENT OF THE GIURGIULESTI PORT COMPLEX. Giurgiulesti International Free Port ha, - has the status of a free economic zone - the oil terminal.
OPERATIONAL PROGRAMME ON TRANSPORT Nelly Yordanova Head of Managing Authority Structural Funds in Bulgaria: Possibilities in Environment, Infrastructure,
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
Program of the NC KazMunaiGaz JSC for the Development of Kazakhstan’s Content for was approved on April 22, To increase the volume of purchases.
Astana - November 2008 “Break Through Projects of the National Company “KazMunayGas”
Mangystau Governor’s Office ECONOMIC AND INVESTMENT POTENTIAL OF THE MANGYSTAU REGION OF THE REPUBLIC OF KAZAKHSTAN.
ARISTOTELION UNIVERSITY OF THESSALONIKI SCHOOL OF TECHNOLOGY FACULTY OF RURAL AND SURVEYING ENGINEERING DEPARTMENT OF TRANSPORTATION AND HYDRAULIC ENGINEERING.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Engineering Technology Division
INITIATIVES IMPLEMENTED ON NATIONAL AND INTERNATIONAL LEVELS FOR ENERGY EFFICIENCY AND ENERGY- SAVING IMPROVEMENT VI Eurasian Energy Forum 4-6 October.
Water System Planning Study
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Limited Proceedings Water & Wastewater Reference Manual1.
Main Achievements in Public Procurement in Ministry of Finance of the Republic of Moldova Public Procurement Agency Batumi, 2015.
An investment project Creation of a demonstration object of energy effective office building.
Development Projects Construction of residential real estate in Kiev, Ukraine.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
Recycling plant with a sorting line and area for temporary waste storage Project idea: utilization and processing of waste Place of realization: near treatment.
Several problems in implementation of the investment programs in power industry Speaker: A.Y.Kopsov, Member of the “Nice Club”, Doctor of Technical Science,
Report on realization of State program of forced industrial – innovative development of RK for by results of 2010 Ministry of Education and Science.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Risk Management & Corporate Governance 1. What is Risk?  Risk arises from uncertainty; but all uncertainties do not carry risk.  Possibility of an unfavorable.
TAOYUAN ENVIRONMENTAL SCIENCE & TECHNOLOGY PARK BUSINESS INVITATION SEMINAR PRESENTATION OF PREFERENTIAL MEASURE & COUNSELING ENVIRONMENTAL PROTECTION.
TRACECA CONSTRUCTION OF INTERMODAL TERMINAL IN THE REGION OF RUSE CITY BULGARIA Infrastructure Working Group Kiev, 11 May 2011.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Infrastructure and capacity development of the State Enterprise “Sea Trade Port of “Yuzhny”
Software Engineering Lecture # 1.
"Mixed-use complex Altufyevskoe highway" According to the General Developing Plan there should be built 60 high-rise multi-functional - residential, hotel.
Environmental Screening A Requirement for All CIDA Financed Projects.
Boiler Operations, Maintenance and Performance Conference.
State Regulation in the Natural Monopoly Sphere Agency of the Republic of Kazakhstan on Regulation of Natural Monopolies ALMATY – 2006.
1. Initiator and goals of the project Initiator of the project – the Investment Promotion Agency of Novosibirsk region – a specialized organization for.
Federal Service for Environmental, Industrial and Nuclear Supervision LEGAL REQUIREMENTS ON EXPLOSION PROTECTED EQUIPMENT FOR THE GAS AND PETROLEUM ACTIVITIES.
PUBLIC AUDIT IMPLEMENTATION IN THE REPUBLIC OF KAZAKHSTAN.
ASTANA BENCHMARKING: International experts opinion and recommendations ,700 TWh According to international experts global energy resources.
Energy Management and Planning MSJ0210 Energy generation Eduard Latõšov.
Grey Owl Municipal Water feasibility study
PROJECT COMMUNICATION PROCEDURE AND DOCUMENT MANAGEMENT
Fort Stanwix National Monument Energy Audit Contract
REGIONAL DEVELOPMENT MAP
Uniper Energy Services
Information about the resort recreation area "Kenderli"
GEORGIAN ELECTRICITY MARKET OPERATOR
Management company of a special economic zone
Construction of multi-storey apartments
Industrial Zone Alatau district of Almaty
Agro zone «Intensive gardens»
Department of Environmental Quality Division of Mitigation Services
- Customs duties exemption
Systems Analysis and Design
(Additional materials)
An-Najah National University Faculty Of Engineering
Energy Services Energy Supply Contracts for Combined Heating and Cooling in new buildings based on Water-Water Heat Pumps systems Bratislava, 7th November.
Management company of a Special Economic Zone
Cross-border Infrastructure Projects
CITY OF MARSHALL CHLORIDE ISSUES September 26, 2017
Construction Management & Inspection
Safety and Security- From Assessment to Implementation
Construction of Balkhashskaya TPS
River Basin Management Flood protection
EXCCOM LLP CERTIFICATION CENTER Astana 2016.
Hnaider Water Tower Project
ARIZONA WATER COMPANY East Sedona Water Storage Facility
Relationship between World Bank and Romanian EA requirements
Liquefied Natural Gas Terminal in Lithuania
IMPLEMENTATION OF ARTICLE 9
WSUP Madole Construction
Presentation transcript:

PORTFOLIO The most reliable solutions!

Our Clients: The most reliable solutions!

Our Clients: The most reliable solutions!

PROJECT: «MULTIFUNCTIONAL RESIDENTAL COMPLEX “GREEN QUARTER” – MEGALINE» Client – EXPO Village LLP Project – “Green Quarter” Multifunctional Residential Complex Building footprint = , 73 m2 Buildings total area = ,21 m2 Number of construction phases – 6 Services performance period – 2015 Services provided – Initial permit documentation compliance review, issue of comments, advice and suggestions; Review of Designer’s Technical Solutions contained in all sections of design documents except Cost Estimate Section Client’s advantages – All sections of Design Documentation quality improvement Preparation of additional feasibility studies required for Project sections calculations. As a result positive conclusion from Gosexpertisa RSE for construction stages 2, 3 obtained

The most reliable solutions! FS: RAILWAY STATION COMPLEX CONSTRUCTION IN ASTANA Client – JSC “NC Kazakhstan temir Zholy” Project – Railway Station Complex Technical description Construction Area - 26,7399 hа Complex total area m2. Capacity passenger per day, Parking capacity – 1129 parking spaces Complex heat power - 12,86 Gcal/hour. Services performance period– 2015 Services provided – Development of specific anti-terrorism section Design estimate documentation review Client’s advantages – safety level upgrade for Astana local residents and visitors As a result positive conclusion from Gosexpertisa RSE on 12 May 2016 obtained

PROJECT: RAILWAY JUNCTION DEVELOPMENT IN ASTANA The most reliable solutions! Client – Zhol Zhondeushy LLP Project – Railway junction development, Astana Technical description Construction area 26,7399 hа Complex total area m2. Capacity passenger per day, Parking capacity – 1129 parking spaces Services performance period– Services provided– Initial permit documentation compliance review, issue of comments, advice and suggestions; Review of accepted Technical solutions contained in design documents Review of technical documents compliance with building code of RK, including comments, recommendations and suggestions.

PROJECT: «PROJECT DOCUMENTATION TECHNICAL EXPERTISE» The most reliable solutions! Client – ERSAI Project– Self-elevating floating drilling unit Technical description Width – 72 m. Height – 64 m. Modified triangular body with three triangular supports 119 meters high, that allows drilling as deep as 50 up to 80 meters Unit weight – t. Services performance period– 2015 Services Provided– Technical issues and design data review Authenticity check, assessment and revision of documents and design drawings Assessment and justification of occurred changes as additional work Assessment of Contractor’s estimate of expenses for additional work completed Recommendations and suggestions for documents type and format Client’s advantages – Construction cost adjustment As a Result technical changes justification

OIL PUMPING STATION “663 KM” RECONSTRUCTION AND EXPANSION The most reliable solutions! Client –KazTransOil JSC Project – Oil pumping station 663 km, Atyrau region Technical description Boosting the capacities from 10 to 20 mln oil ton per year Services performance period – 2014 Services provided – Revision of estimate and technical sections Design decision revision Price lists collection Project estimate cost increase by means of not listed expenses detection for KZT 10 bn Method Statement development Project decision development and justification Client`s advantages– FEED/DD quality improvement As a result RGP “Gosexpertise” positive conclusion obtained in December 2014

Water pumping station-5 reconstruction for watersupply increase in conduit Astrakhan - Mangyshlak The most reliable solutions! Client –KazTransOil JSC Project – «Water pumping station- 5» Technical description Water supply increase to m3 per day Land area – 3,23 hа Modernization of trunk pumping station Old pumps replacement with the modern brand pumps RuhRPumpen Services performance period – 2016 Services provided – Estimate section correction Price lists compiling Method Statement correction Design documentation maintenance during Gosexpertise procedures until appropriate positive conclusion obtained within fixed time period Client`s advantages – Design documentation quality improvement As a result unlisted expenses revealed

“ZHAMANKOYANKULAK” SITE DEPOT RECONSTRUCTION. CORRECTION. FIRST STAGE (GAS REHYDRATION IMPLEMENTATION)" The most reliable solutions! Client – Intergas Central Asia JSC Project – «Gas dehydration on natural gas storage “Bozoy” Technical description: Plant capacity – 27nanometer3/day Construction land area – 1,0357 hа. Building coefficient – 36,6 %. Construction period - – 16 months. Expected work completion – August 2016 Provided services – Price lists compiling; Method statement section correction; “AKKE Monitoring system” section development Design documentation maintenance during Gosexpertise procedures until appropriate positive conclusion obtained within fixed time period Client`s advantages – Design process management recommendations and advices are obtained. As a result is project on completion stage.

SPECIALIZED FAST-FOOD RESTAURANT MCDONALD`S The most reliable solutions ! Client – Food Solutions KZ LLP Project – «Specialized fast-food restaurant McDonald`s» Technical description Building footprint -1611,4 m2 Land area hа Building total area m2 Building volume m3 Services performance period – 2015 Services provided – Project documentation completeness review; Issue of comments regarding to design documentation correction; Project decision development and justification; Design documentation maintenance during Gosexpertise procedures until appropriate positive conclusion obtained Client`s advantages – Project documentation quality improvement Construction project implementation without project decision modifications As a result positive conclusion of RGP “Gosexpertise” is obtained on

The most reliable solutions ! Client – Kazakh Institute of Oil and Gas JSC Project – «Gas pipeline “Beyneu- Bozoy-Shymkent”» Technical description: Design pressure – 7,4 и 9,81 Megapascals Gas pipeline total length – 1472 km. Services performance period – 2015 Services provided – Price lists section development; Method statement section correction; “AKKE Monitoring system” section development Project documentation maintenance during passing RGP “Gosexpertise” till positive conclusion will be obtained according to fixed time Client`s advantages – Project documentation quality improvement. As a result RGP “Gosexpertise” positive conclusion is obtained

PROJECT: «MULTIFUNCTIONAL COMPLEX ABU DHABI PLAZA» The most reliable solutions! Client – Aldar Euro Asia LLP Project – «Abu Dhabi Plaza Project» Technical description: Complex area – m2. The maximum number of storeys – 75 Services performance period – Services provided : Heating and domestic hot water design and engineering services 7 ETS Rooms development in BIM model (Revit) Approval by “Astana-Teplotranzit” JSC Client`s advantages: Complex construction freezing risks decrease Complex heat consumption decrease As a result the project performed according to ASHRAE standards is approved by “Astana- Teplotranzit” JSC

The most reliable solutions ! Client - ISS Engineering LLP Project – infrastructure of free economic zone “Chemical Park «Taraz» Technical description Free economic zone land area hа Railway area m2 - I queue Communications land area m2 - I queue, II queue Expected work completion – May 2016 Provided services – Technical documentation preparation with recommendations issue; Answers to RGP “Gosexpertise” comments preparation Clients advantages – Design process management recommendations are issued As a results risks of estimated costs understatement are revealed PROJECT: FREE ECONOMIC ZONE “CHEMICAL PARK “TARAZ”

PROJECT «ZHAIREM POLYMETALS» The most reliable solutions! Client - AAEngineering Group LLP Project - «Zhairem Polymetals», Zhairem Mining processing plant Technical description: Total stead area hа. Building volume m3 Throughput units Services performance period – 2016 г. Services provided – FEED/DD revision in accordance to regulatory technical requirements of RK Answers to RGP “Gosexpertise” comments preparation Client`s advantages – Court of Law positive decision in favor of Client regarding quality of performed works by Designer The project is on completion stage