1 EUROGIA+ Success Story – A project, “WIFI”. 2 WIFI – Wind Farm Installation Vessel New concept of barge for the installation of offshore in-one-piece.

Slides:



Advertisements
Similar presentations
OO Star Wind Floater A robust and flexible concept for floating wind
Advertisements

Forth Estuary Forum 28th Nov 2013
The first floating wind turbines Martin Jakubowski Technology Architect Blue H Technologies BV, The Netherlands Brindisi, Italia 23rd of May
Self Installing Wind Turbine (SIWT) Mark Riemers – Managing Director.
An Experimental Investigation on Loading, Performance, and Wake Interactions between Floating VAWTs ____________________________________________ Morteza.
Wind Energy Wind power is the conversion of wind energy into a useful form of energy, such as using wind turbines to make electricity, wind mills for mechanical.
D EMO W IND ERA-NET C OFUND A CTION J OINT C ALL 2015 W EBINAR : 4 M ARCH 2015 For further information, please see the DemoWind website:
EWEC 2011, 16 th March 2011 Universal Foundation A novel wide-ranging substructure installation concept 1 MBD introduction The Universal Foundation Framework.
Arklow - GEWE 3.6 MW Offshore Project Lessons Learned
22nd April, 2010, “Offshore access, safety and standards”
Quantifying risk through a rigorous analytical approach to the real world challenge of offshore wind construction – downtime, constraints and sequencing.
UK’s First Commercial Scale Offshore Wind Farm 26th March 2003 NWP Offshore Ltd.
Longyuan Mulilo De Aar 2 WEF MW Onshore Wind Energy Facility
Deep Water Offshore Wind Energy By Paul D. Sclavounos Horns Rev Wind Farm (Denmark) - Rated Power 160 MW – Water Depth 10-15m.
SEA-IT Dynamic contingency information system for maritime transportation Presented by Øyvind Endresen & Gjermund Gravir.
World Market Update 2002 March Page 1 - Market Status - Demand Side Supply Side - Market Forecast - Forecast until 2007 Predictions
INTERNATIONAL WORKSHOP ON MARINE POLLUTION CONTROL 8 th June 2006, Athens (GR) OIL SEA HARVESTER TST4-CT ww.osh-project.org THE OIL SEA HARVESTER.
C-Power NV is a Belgian company established for the development and implementation of a farshore wind farm on the Thorntonbank. Welcome Objective Partners.
NEW CONCEPTS FOR INSTALLING WINDTURBINES OFFSHORE.
Maryam Aljaber PBL Q2. Types of oil platforms Fixed platform. Complaint tower. Sea star Floating production system. Tension-leg platform. Spar.
VetroEnergo AS Wind Power at the Kola Peninsula Presentation at Bellona Conference 1-2. April 2008 Lars Helge Helvig, Norsk Vind Energi AS.
1.  Renewable energy is energy which comes from natural resources such as sunlight, wind, rain, tides, and geothermal heat, which are renewable.  Climate.
© Siemens AG All rights reserved. The importance of infrastructure June 2011.
Design of the Z72 wind turbine with direct drive PM generator
1 UK Offshore Wind 2002 Offshore Wind and Wave: A Common Route Map Phil Thompson - British Maritime Technology Chris French - NaREC Centre Director.
1 IPEK energy GmbH Development and Implementation of a Wind Farm 3rd International Conference on Alternative Energy & Power ICAEP 28 March 2009.
Background: 27 November 2007, FREDS EU Network became the Scottish EU Energy Network. Main objective: To raise Scotland’s profile in Europe ? ? ?
New Technical Approach to Classification of Anchor Handling and Diving Support Vessels A. DEVADAS RINA MUMBAI.
The Australian Wind Energy Association Clean Power. Clean Air. Australian Wind Energy Market Update Andrew Richards President, Auswind EWEC 06 Athens.
Small Wind Turbines Innovation opportunities via small wind turbine testing Daniel Feszty Associate Professor Department of Mechanical and Aerospace Engineering.
Prof. R. Shanthini 02 Feb 2013 Module 06 Renewable Energy (RE) Technologies & Impacts (continued) - Use of RE sources in electricity generation, in transport,
1  Renewable energy is energy which comes from natural resources such as sunlight, wind, rain, tides, and geothermal heat, which.
Shoals Marine Lab Wind Turbine Construction, June 2007 William E. Bemis Kingsbury Director.
Integrated Dynamic Analysis of Floating Offshore Wind Turbines EWEC2007 Milan, Italy 7-10 May 2007 B. Skaare 1, T. D. Hanson 1, F.G. Nielsen 1, R. Yttervik.
European Wind Energy Conference and Exhibition 2006 Athens, Greece EWEC’06 Athens 27 February-2 March 20061/16 Advanced Aeroelastic Modeling of Complete.
EWEC 2006, Athens1Jan Rispens Wind Energy Agency Bremerhaven/Bremen (Bild: Enron Wind) The WAB Industry Network in Northwest-Germany Profile and R&D-Activities.
Overview of Wave Energy Conversion Technologies
TMR4225 MARINE OPERATIONS SPRING 2007 Introduction.
Pro Care Career Project Number: DE/11/LLP-LdV/TOI/ Title of the Project: Individual Permeability in Geriatric Care and Health Care Date:
Floating Offshore Wind Turbines Floating Offshore Wind Turbines An Aeromechanic Study on the Performance, Loading, and the Near Wake Characteristics of.
Wind, Wind Power and Vestas Implementation of Wind Power.
FUTURE FOR OFFSHORE WIND ENERGY IN SPAIN Wind Energy Department
Petroleum Engineering 406
VOWTAP Progress Report VOWDA December 2, DOE Grants VOWTAP Extension No Cost Time Extension until May 31, 2016 Conditional upon achievement of two.
SPANISH MARITIME CLUSTER José Esteban Pérez The Hague, November 8th 2010 Development & main facts Nov Nov th Rountable ENMC, The Hague.
1 Author Gillie Country UK Session 4 – Block a Barcelona May 2003 'Virtual' Power Plant  Gas turbine used regulate power and voltage at point J.
Cooperative Agreements Program National Spatial Data Infrastructure David Painter FGDC CAP Coordinator.
North Coast Wind Farm Tolano Environmental Consulting.
H2020 Proposals LIFES 50 PLUS James Battensby – Technical Bid Manager 23 rd June 2015.
MHI Products © 2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.
Structural design and dynamic analysis of a tension leg platform wind turbine, considering elasticity in the hull NTNU supervisor: Erin Bachynski TUD.
Breaking waves on the offshore wind turbine monopiles and the effects of boundary layer
Renewables: Moy Wind Farm
Wind technology: R&I perspective
Talents of tomorrow: Aerodynamics and aeroelasticity
Icebreaker Wind Supply Chain Open House
THE OIL SEA HARVESTER SYSTEM :
Installation Vessel Design
Valid Points Need to Know about the Companies Act 2013
WIND TURBINE GENERATORS.
Closed Loop Wind Farm Control
Project Coordinator Peter Hjuler Jensen, DTU WIND ENERGY
LEANWIND Project - Introduction
Grid integration and stability of 600MW windfarm at Kriegers Flak
Objective Provide enough wind generation to supply 15% of Rhode Island’s native demand from wind powered generation in Rhode Island, for Rhode Island consumers.
RES in the North-Western EU
Electricity generation in Japan
Reduced Draft Spar (RDS) Floating Offshore Wind Turbines A Market Opportunity Pedro López Offshore Engineering & Ship Design
Funder Preferred Risk Allocation
The Innovation Fund focus: wind industry’s perspective
Presentation transcript:

1 EUROGIA+ Success Story – A project, “WIFI”

2 WIFI – Wind Farm Installation Vessel New concept of barge for the installation of offshore in-one-piece wind turbine  catamaran barge / float over method E+ Label on the 16th of March 2009 PARTNERSHIP Leader French Partner (Subcontractor for Technip) Norwegian Partner Spanish Partner Technip France Oceanide DNV Acciona Project Management and Engineering Basin tests Rules, regulation and validation Wind Turbine BUDGET k€Total CostSelf fundedNational Funding Technip France (150 for subcontracting) ACCIONA DNV15075 TOTAL Duration June 2009 till March 2011 Project Overview

3 The project is focused on the offshore installation of wind turbines by designing a new vessel that extends the concept of transporting a deck to site on a catamaran and installing it by the “float over method”. A 6MW turbine has been considered for the Vessel Design Purpose. Loads introduce by the Turbine during transportation and installation have been defined. Several Met-Ocean Conditions have been considered as well as port locations. The project also includes the logistics onshore, that will lead to the load out of the WTG. Work comprise the Vessel design as well as the WTG Tower and connections. Basin Tests have been performed. Project Consortium Agreement in Place. Funding approved by Countries. Several Meetings (FtF and Conf). WIFI – Wind Farm Installation Vessel

4 Initial Concept Current Concept development Based on project development, initial concept has develop: Use of DSIV Elevating capacity = 20,000 t (96 pinions) Hulls = 142.5m x 25m x 12m Displacement = 28,000 t Rear door to operate Not really fit for purpose ! Barge = 87 m x 18 m x 9 m, Draft = 4.60 m One central linking beam : 66 m x 30/16 m x 20 m Dynamic Positioning during installation Vertical handling of WTGs (heave compensation) Square Leg 16 m x 16 m x 84 m Lateral quick release shimming at top and bottom of the turbines mast Roll & pitch cancellation system: slo-roll (passive) Really fit for purpose ! WIFI – Wind Farm Installation Vessel Project Overview

5 Basin tests performed end of january Post- Process Cost Analysis final Success through Cooperation ! WIFI – Wind Farm Installation Vessel Project Overview