Federal Aviation Administration Test Planning for AOC/FOC Interface for Data Comm Production System To: DCIT 26 From: Data Comm Production Sub-Team Date:

Slides:



Advertisements
Similar presentations
Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 20th MEETING OF WORKING.
Advertisements

Data Comm Proposed DCL Services Deployment Waterfall
Federal Aviation Administration S1P1/P2 Production System: DCL Route Rules DCIT#32 16 April 2014.
Federal Aviation Administration Data Communications Program DCIT Update MEM ATCT DCL Trials To:DCIT Plenary From: Matt Maki Date:
NextGen Integration Working Group Plenary Meeting Three July 15, 2014.
Direct Loan Technical Spec Update David Jenks Debbie Miller Robert Berry.
AOC/FOC Interface for Data Comm Production System
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #24 En Route Route Clearances Draft Use Case Introduction Boeing –
FAA Controller Pilot Data Link Communications Program ATN ‘99 London, England James H. Williams September 22, 1999.
Secure System Administration & Certification DITSCAP Manual (Chapter 6) Phase 4 Post Accreditation Stephen I. Khan Ted Chapman University of Tulsa Department.
1 Overview of IDEA/SPP Early Childhood Transition Requirements Developed by NECTAC for the Early Childhood Transition Initiative (Updated February 2010)
Federal Aviation Administration Data Communications Implementation Team (DCIT) Trials Activities/DTAP Update Schedule Timelines Matt Maki.
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: AOC WG From: Data Comm Production Sub-Team Date: 07/11/12.
Federal Aviation Administration Data Communications Program Data Comm Trials and Production Requirements: High Level Impact Presented To: DCIT #23 Plenary.
12/01/2011 FEDERAL AVIATION ADMINISTRATION AIR TRAFFIC ORGANIZATION 1 Execution of Flow Strategies (XFS) (aka Go Button)
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Electronically approve and create Suppliers in Oracle Financials using a combination of APEX and Oracle Workflow. NZOUG Conference 2010 Brad Sayer Team.
Federal Aviation Administration Data Communications Program DCL Trials DCIT Update MEM ATCT To:DCIT Plenary From: Matt Maki Date:
Federal Aviation Administration Data Communications Integration Team (DCIT) DCL Trials test activities Presented to:DCIT # 15 By:Peter Muraca FAA Date:May.
Federal Aviation Administration Federal Aviation Administration 1 Presentation to: Name: Date: Federal Aviation Administration AMHS Security Security Sub-Group.
Harris.com Michael Earl Systems Engineering, Trials and OPR Trials Status and OPR Update.
Copyright © 2007, Oracle. All rights reserved. Managing Concurrent Requests.
Presented to: DCIT #12 Plenary By: Andy Fry, Thane Inc. Date: January 12, 2012 Federal Aviation Administration Data Communications DCIT Update Flight Deck.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
Data Link Communications
Data Communications Implementation Team (DCIT)
Document Tracking and the Related Process Andria Roney Rob Mead Andy Fry Andrew Onken.
FAA System-Wide Information Management Program Overview for SWIM-SUIT Public Lauch Donald Ward Program Manager FAA SWIM Program April 2007.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #25 Agenda 07/17-07/18/2013 Harris Corp – Washington, D.C.
Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig & Pete Muraca.
Presented to: DCIT FDWG Breakout Session By: Andy Fry, Thane Inc. Date: July 11, 2012 Federal Aviation Administration Data Communications DCIT #16 Flight.
Federal Aviation Administration Data Communications Program Operational Trials in Domestic Airspace Presented to:Data Comm Implementation Team (DCIT) By:Jerry.
Federal Aviation Administration Data Communications Program Departure Clearance (DCL) Trials DCIT17 To:DCIT Plenary From: Matt Maki, Trials Lead Date:
Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT25 Update To:DCIT25 Plenary From: Matt Maki Date:
BOEING is a trademark of Boeing Management Company. Copyright © 2011 Boeing. All rights reserved. OMWG and All Working Groups DCIT-39 report out 11 March.
Federal Aviation Administration DCIT 39: S1P1 DCL E2E Summary DRAFT To: DCIT All WG From: Data Comm Production SE Date: DCIT 39, 11 March DRAFT.
Federal Aviation Administration Test Planning for AOC/FOC Interface for Data Comm Production System To: DCIT 29 From: Data Comm Production Sub-Team Date:
EWR DCL Trial Update Capt Gregg Kastman MD-11 Flt Trng Sup.
Presented to: By: Date: Federal Aviation Administration DCIT 41 Plenary Mark Patterson, FAA, AFS June 2015 Flight Standards Update.
Presented to: By: Date: Federal Aviation Administration DCIT 40 Plenary Mark Patterson, FAA, AFS April 2015 Flight Standards Update.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #23 Plenary 05/09/2013 To: DCIT By: Gregg Anderson.
Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status / Overview DCIT #27 Plenary From: Matt Maki / DCL Trials Lead.
GROUND-GROUND STRINGAIR-GROUND STRING AVIONICS CSP AOC DTAP NESG HADDS.
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: AOC WG From: Data Comm Production Sub-Team Date: 08/22/12.
Federal Aviation Administration TDLS-CSP IRD and SDB-CSP IRD Update To: DCIT #24 From: Bruce Notley Date: 6/13/13.
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: DCIT AOC WG From: Data Comm Production Sub-Team Date: 2/1/13.
Federal Aviation Administration Data Communications Program Final Investment Decision (FID) – Update on May 30, 2012 Presented to:SC-214/WG-78 Plenary.
Courtesy Copy Messages DCIT WG meetings 3/6/2012.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCL Trials ”T e s t S t a t u s” Presented to:DCIT, Meeting #18 Presented.
Federal Aviation Administration System Wide Information Management SWIM Implementing Programs (SIPs) Status Presented to: Demonstrations and Prototypes.
Federal Aviation Administration Subscriber Database (SDB) and Web Access To: DCIT AOC WG From: Data Comm Production Sub-Team Date: 3/13/13.
Step 1 Lead Notifications Dear Partner, New leads have been assigned to your organization based on customer preference and are available for you.
FAA NextGen Data Comm Tower Service: CPDLC DCL New Operator Introduction.
Presented to: DCIT Flight Deck Working Group By: Andy Fry, Thane Inc. Date: October 12, 2011 Federal Aviation Administration Data Communications DCIT #10.
FAA Data Comm Program Status AERONAUTICAL COMMUNICATIONS PANEL (ACP)
International Civil Aviation Organization
Data Comm Departure Clearance End To End Summary: (DCIT #27 WG)
TaxSlayer Online (TSO)
Data Communications Program
TaxSlayer Online (TSO)
USOAP Continuous Monitoring Approach (CMA) Workshop
Operational Context and Use Case Focus Group
Presentation transcript:

Federal Aviation Administration Test Planning for AOC/FOC Interface for Data Comm Production System To: DCIT 26 From: Data Comm Production Sub-Team Date: August 2013

2 Federal Aviation Administration August 2013 Introduction In preparation for integration testing activities planned in 2014, FAA would like to discuss establishing a test interface between TDLS and AOC/FOC systems This testing will ensure all necessary changes made for DCL operations within the production system are working appropriately prior to operational and field tests FAA will provide information to the aircraft operators for their feedback for planning of this activity

3 Federal Aviation Administration August 2013 Integration Test Timeline FAA will coordinate with each AOC/FOC participant to establish connectivity The goal is to plan on integration testing in the May 2014 & beyond timeframe Need to plan on 6-9 month lead time to establish connectivity and achieve test configuration FAA will coordinate with each AOC/FOC participant to establish connectivity The goal is to plan on integration testing in the May 2014 & beyond timeframe Need to plan on 6-9 month lead time to establish connectivity and achieve test configuration

4 Federal Aviation Administration August 2013 Connectivity Establishment FAA will provide IRDs and ICDs, which includes messages exchanged with AOCs, to be used for AOC system updates for the interface –The TDLS-CSP interface is the legacy PDC interface that is being enhanced with new messages –The TIMS SDB-CSP interface is the new web-based interface to support the Subscriber Data Base and user preferences Airline(s) who choose to participate and FAA’s IFCET (Interfacility Communications Engineering Team) will coordinate to configure a VPN connection to FAA’s Front End Processors within the FTI National Test Bed (FNTB) located at WHJTC FAA’s FTI User's Guide for Non-NAS Users will provide details Once the operator’s VPN is configured, IFCET will provide a certificate with the appropriate private/public keys FAA will configure the FNTB to ensure a proper flow from the airline system to TDLS

5 Federal Aviation Administration August 2013 Documentation TDLS - CSP IRD dated April 26, 2013 –This IRD was provided to DCIT AOC WG in May –Includes legacy PDC, new Dispatch message (Courtesy Copy) and new Gate Request (GREQ) message –Currently updates being made to address comments TIMS SDB - CSP IRD dated April 26, 2013 –This IRD was provided to DCIT AOC WG in May –Describes the web-based interface to the Master Subscriber Database –Currently updates being made to address comments Corresponding ICDs –TDLS - CSP ICD dated June 21, 2013 –TIMS SDB - CSP ICD dated May 29, 2013 –Currently updates being made to address comments FTI User's Guide for Non-NAS Users

6 Federal Aviation Administration August 2013 AOC-TDLS Connectivity The external user referred to as the Communications Service Provider (CSP) is also the Airline Operations Center (AOC) in the context of the IRDs

7 Federal Aviation Administration August 2013 Subscriber Database TIMS Connectivity

8 Federal Aviation Administration August 2013 DRAFT Data Comm Proposed S1P1 Tower Waterfall Key Sites (3 Towers ) Group A (19 Towers )Group B (17 Towers )Group C (18 Towers ) Site NameSite ID ARTCC ID IOC Site NameSite ID ARTCC ID IOC Site NameSite IDARTCC ID IOCSite NameSite ID ARTCC ID IOC KS 1: Salt Lake CitySLCZLCQ New OrleansMSYZHU Q LouisvilleSDFZID Q BostonBOSZBW Q KS 2: Houston IntclIAHZHUQ AustinAUSZHU Q IndianapolisINDZID Q ProvidencePVDZBW Q KS 3: Houston HbbyHOUZHUQ San AntonioSATZHU Q CincinnatiCVGZID Q BradleyBDLZBW Q NAP – NAP ComplNAZLC/ZTLQ Los AngelesLAXZLA Q MemphisMEMZME Q NewarkEWRZNY Q IOA Compl Q Las VegasLASZLA Q NashvilleBNAZME Q J F KennedyJFKZNY Q In-Service DecisionQ San DiegoSANZLA Q DenverDENZDV Q La GuardiaLGAZNY Q John WayneSNAZLA Q AtlantaATLZTL Q PhiladelphiaPHLZNY Q Bob HopeBURZLA Q CharlotteCLTZTL Q TeterboroTEBZNY Q OntarioONTZLA Q JacksonvilleJAXZJX Q WestchesterHPNZNY Q San FranciscoSFOZOA Q OrlandoMCOZJX Q DetroitDTWZOB Q OaklandOAKZOA Q MiamiMIAZMA Q ClevelandCLEZOB Q San JoseSJCZOA Q Fort LauderdaleFLLZMA Q PittsburghPITZOB Q SacramentoSMFZOA Q TampaTPAZMA Q Balt/WashBWIZDC Q PhoenixPHXZAB Q Palm BeachPBIZMA Q DullesIADZDC Q AlbuquerqueABQZAB Q St LouisSTLZKC Q ReaganDCAZDC Q SeattleSEAZSE Q Kansas CityMCIZKC Q Raleigh/DurhamRDUZDC Q Dallas LoveDALZFW Q Minn-St PaulMSPZMP Q Chicago MidwayMDWZAU Q Dallas FTWDFWZFW Q Chicago O’HareORDZAU Q4 2016

9 Federal Aviation Administration August 2013 In Service Decision MilestoneProposed Sites 3 TDLS Towers 2 Nat’l ERAMs 1 Non-National Parent ERAM (3 ERAMs Total) Proposed Dates Key Site 1 IOCSalt Lake City (ZLC/SLC) Q Key Site 2 IOCHouston Intercontinental (ZLC/ZHU/IAH) Q Key Site 3 IOCHouston/Hobby (ZLC/ZHU/HOU) Q ERAM to NAP & NAP to NAP Integration Salt Lake Center/Atlanta Center (ZLC/ZTL) Q Independent Operational Assessment (IOA)Q In Service Decisions (ISD)Q4 2015

10 Federal Aviation Administration August 2013 QUESTIONS?

11 Federal Aviation Administration August 2013 BACKUP CHARTS

12 Federal Aviation Administration August 2013 Gate Request (FAA ->AOC): Summary Content –Gate Request data exchange provides same functionality as AOC provides in current response to a PDC –AOC to provide surface location at sites that require it operationally; initial implementation is Gate ID –Format based on DTAP SIDD, v1.1; subsequent DCIT/DTAP changes will be evaluated as a requirements change request Distribution/Timing –Gate Request is now a separate message from Dispatch message to accommodate timing requirements from both ATC and AOC ATC needs gate info when controller approves DCL (same as for PDC today) AOC wants Dispatch message when DCL is uplinked to pilot, not when approved by controller

13 Federal Aviation Administration August 2013 Gate Request (FAA ->AOC): Summary (cont’d) –Gate Request sent to AOC when controller/system first approves DCL, e.g., approx min prior to P- Time No explicit controller involvement in actual message to AOC One-time request message; any subsequent gate changes will be handled procedurally –Ground system will send to all users; When not operationally required, users can opt out of Gate Request via Subscriber Data Base (Discussion topic)

14 Federal Aviation Administration August 2013 Gate Request Response (AOC->FAA): Summary Content –{Flight ID *A} { Sequence Number} {Tail Number} { Airport Departure} {Gate Assignment} –5-8 char Gate ID, if known; “G” if gate is unknown –Format based on DTAP SIDD, v1.1; subsequent DCIT/DTAP tweaks will be evaluated as a requirements change request Distribution/Timing –Sent by AOC to FAA in response to Gate Request Message –Expect response from AOC within 2 min, similar to PDC response

15 Federal Aviation Administration August 2013 Gate Request/Response: Questions (cont’d) Implementation: –Previous DCIT proposed that Gate Request message will be sent only to those users who currently supply gate in PDC response –Specific mechanism for determining which airports and which users require the Gate Request message was not defined Current planned implementation –Ground system will send Gate Request Message for all DCL aircraft to all AOCs (No change to existing PDC) –Users opt out via Web-based access to Subscriber Data Base (SDB), which is same mechanism as for providing ADNS addresses –SDB Web Access allows other user default preferences –If any issues with ATC for specific airport or users, adjust accordingly

16 Federal Aviation Administration August 2013 DCL Dispatch Message: Summary Content –Contains content of DCL that is sent to pilot for initial and any revised DCL Caveat that this is not an ATC clearance, and does NOT include a beacon code –For initial and revised DCLs, includes a separate full route string even if this was not sent to pilot –Format based on DTAP Systems Integration Description Document (SIDD v1.1, Nov. 2012); –Users have option to tailor Dispatch message preferences via Subscriber Data Base (not required) Distribution/Timing –Sent to AOC only when a DCL clearance uplink is sent to flight deck Initial DCL as response to request by flight deck via DM25 Revised DCL upon uplink (immediately after controller approval)

17 Federal Aviation Administration August 2013 DCL Dispatch Message Response: Summary Content –Format based on DTAP Systems Integration Description Document (SIDD v1.1, Nov. 2012) except no gate assignment (handled by separate Gate Request message) –Note that if gate is left in, will not be used –{Flight ID *A} { Sequence Number} {Tail Number} {Departure time} –Contains Departure time field from legacy PDC response to minimize software impact, per SIDD Distribution/Timing –Sent by AOC to FAA in response to DCL Dispatch Message –Expect within 2 min, similar to PDC and DTAP

18 Federal Aviation Administration August 2013 Web Access to the SDB Web Access provides a new, secure method for accessing the SDB –AOC/CSP can directly manipulate their subscriber data –Portal access is limited to their data –AOC/CSP may not need to access the SDB after initial set up Concept of Operation –CSP/AOC logs in to Web Access SDB –CSP/AOC creates/modifies a record to specify clearance type(s), Dispatch message options, Gate Request preference, and CSP/AOC address –CSP/AOC only accesses SDB when changes are required The enhanced SDB will include various flight specific and AOC/user data elements –Flight id (tail number, call sign, Airline ID, etc.) –ADNS address for PDCs and DCL Dispatch messages –Primary and secondary clearance preference types (PDC, DCL) –Other User Preferences, e.g., type of DCL Dispatch/Courtesy Copy(CC) airline will receive (initial, revision, all), Gate Request message –Other PDC and CPDLC management information, as applicable

19 Federal Aviation Administration August 2013 DCL Service Fallback Concept: Summary If CPDLC service for DCL is not available, FAA automation will “fall back” to PDC –Flights tagged as getting DCL will be retagged as PDC if prior to 30 min before P-Time –AOC/User must tell FAA they want this fallback scheme applied Can be done in ICAO FP preferences in Field 18/DAT, e.g., code for DCL as primary and PDC as secondary An additional option is for AOC/user to provide this fallback preference via Web Access portal (Subscriber Data Base) for all flights (system- wide) Notification –Open question on notification of DCL service unavailability to AOC and/or flight deck –Current planned procedural implementation If short-term outage, add to D-ATIS If longer outage, issue NOTAM

20 Federal Aviation Administration August 2013 DCL Service Fallback Concept: Summary (cont’d) Fallback Implementation Approach –Fallback only occurs if AOC/User has designated PDC as the secondary clearance type preference via ICAO flight plan codes or Web Access SDB ICAO FP takes precedence –If flight has been “processed” as DCL, even if DCL not yet picked up by the pilot, no PDC will be sent If DCL is already approved, flight will still get the pending clearance as a response to DM25 but nothing after If DCL is not yet approved, controller will go to voice –If not yet processed, i.e., new flights or those earlier than “strip” time, will get PDCs if user has so indicated