CLIC Activities of M. Filippova 16.02.2012 16 Feb 20121M. Filippova, BE-RF-PM EDMS Quality assurance Component procurement.

Slides:



Advertisements
Similar presentations
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Advertisements

Electronic Systems Support LV PS Procurement - Status February 28, 2005.
SEVOCITY WELCOMES 1. AGENDA Introductions Key Responsibilities Review of Key Information Major Project Steps – Review 2.
Satellite 1 Purchasing - overview What we do Provide a service for all queries relating to purchase of goods and services from external companies using.
SUPPLY/LOGISTICS FUNDAMENTALS
CERN – European Organization for Nuclear Research Administrative Support - Internet Development Services A Contract Follow Up Quick tour Laure Esteveny.
 SAP AG 1999 filename (author) / 1 Elvira Wallis SAP AG Update on Previous Development Requests.
Procurement Procedure and Preparation of Procurement Plan with reference to Karnataka.
Slide 1 CATHI Project Administration Seamus Hegarty Human Resources Department Marie Curie Actions administrator CATHI kick-off meeting CERN 23 May 2011.
Very Small-Value Procurement Under World Bank/IDA Small Grants, Loans and Credits Zagreb Regional Procurement Training Feb. 27 – March 3, 2006.
November 3, 2002CVEN349 - Maxwell1 Procurement and Materials Management Module 6.2 November 3, 2002.
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
PROCUREMENT PLAN States should prepare Procurement Plan for the entire outlay approved by the PAB for the State Component and all the Districts. The Procurement.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
CONFIDENTIAL © 2009 Cymer, Inc. IBP – GTS Product Catalog – Understanding Information Provided Marcus Osibov
CLIC activity of Jukka Väinölä Feb 20121J. Väinölä, BE-RF-PM.
Purchasing Overview. Fundamentals of Purchasing Procedures.
New test structures: Status report and technical documentation review
EN-GMS Group Meeting S. Prodon – CERN News (scientific matters) 1 st collisions at 13 TeV on 20 May Stable beam as from 3 June = start of.
CLIC Cost & Schedule WG: mandate, organization, activities 2009 Ph. Lebrun CERN, Geneva, Switzerland TILC’09 Tsukuba, Japan.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
HL-LHC Project Kick-off Meeting Friday 15 th April 2011 Sylvain Weisz DG-DI-DAT on the behalf of the A&T Sector Projects Support Office.
Doing business with CERN Anders Unnervik 3 November 2014.
Procurement Part Two Marketing Logistics Purchasing Decision Variables: How to Rate Suppliers.
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
Agenda : CLIC Civil Engineering and Services (CES) WG.
Corporate Technical Infrastructure Management From MP5 to a Corporate Technical Infrastructure Management System.
Project schedule and status R. Guida, F. Ravotti, D. Pfeiffer November 14th, 2012 GIF++ users meeting.
CATHI Project Administration Seamus Hegarty Human Resources Department Marie Curie Actions administrator CATHI General Meeting CERN 14 November 2011.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
CLIC Cost at 3 TeV and 500 GeV CDC meeting, Hans-H. Braun for CLIC cost & Schedule WG Mick Draper, Katy Foraz, Claude Hauviller, Bernard Jeanneret,John.
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
Freedom of Information Information Managers Workshop 1 st November 2007.
Sydney (02) Melbourne (03) Brisbane (07) Carlo Biaro Capital Insight Conference 2013 – Tools and.
T. KurtykaLinac4 meeting 12 March 2009 Guidelines from the sLHC Specification Committee 1). sLHC Specification Committee 2). Schedule of tenders for Linac4.
New Comers Information Emanuele Piemonti Spalazzi & Gaetan Richaud EN-GMS-Adm
HNSciCloud Pre-Commercial Procurement Project Procurement Framework and Schedule Dante Gregorio CERN 26 January
TBTS Test Program & Schedule G. Riddone
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
TE-MPE-EM: Subcontracting Raphaël Berberat
ELENA Documentation and Data Management Items, Assets, Functional Positions T. Birtwistle EN-ACE-CL With input from T. Krastev EN-ACE-EDM.
Doing business with CERN Anders Unnervik 20 May 2014.
Purchasing supplies at CERN Procurement Rules Someone FP-PI.
M. FILIPPOVA CERN CLIC BE-RF RF DEVELOPMENT MEETING ON Inventory of RF components.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
CLIC activity of S. Iija Feb 20121S. Iija, BE-RF-PM EDMS MTF Administrative work.
Product Lifecycle Management with the CERN EDMS David Widegren CERN, TS/CSE 8 Nov 2005EDMS:
02-Dec XB Dec-2010 XB-10 Engineering design, production and follow-up of X-band RF components G. Riddone in collaboration.
PROCUREMENT RULES FOR EXPERIMENTS AT CERN Dante Gregorio CERN Procurement Service.
Cold mass procurement, status and plan, QA-QC H. Prin With contribution from S. Becle, O. Housiaux, R. Principe, J.-L. Rudeiros Fernandez, F. Savary 3.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
CLIC activity of W. Zhou Feb 20121W. Zhou, BE-RF-PM Procurement Quality assurance.
IT-4135/EN Supply of Air Handling Units for Industrial HVAC Projects at CERN Technical Specification Paul Pepinster / EN-CV.
LHC intervention scheduling with the Work Acceptance Tool
4 THE DIGITAL FIRM: ELECTRONIC COMMERCE & ELECTRONIC BUSINESS.
Pre-Defined Processes & Activities
Sap sales & distribution
PROCEDURE FOR PURCHASING DRUGS
MPE-EM Workshop Purchasing strategy for electronic modules
local INVENT Meeting progress in the Project Oct
Cooperation between CERN and Norwegian Industries 2017
Ways to industry participation in CLIC 24th October, 2017
MARKETING, PURCHASING AND PRODUCTION (7 - 9%)
Projects and procurement
Projects and procurement
Secretarial Studies Program
IT-4464/EN Bidders conference
East Hall under construction
Presentation transcript:

CLIC Activities of M. Filippova Feb 20121M. Filippova, BE-RF-PM EDMS Quality assurance Component procurement

CLIC EDMS 1.Updating, changing of structure and co-administration of EDMS (Engineering & Equipment Data Management Services, for the CLIC experiment (The Compact Linear Collider): managing the access rights for EDMS documents submitting documents to EDMS 2. PBS (Project Breakdown Structure): updating the excel tables (EDMS #918792) updating, changing of PBS in EDMS: - Hardware Baseline at 3 TeV (Proj. Id: AB ) - Hardware Baseline at 1.5 TeV (Proj. Id: AB ) - Hardware Baseline at 500 GeV (Proj. Id: AB ) 16 Feb 20122M. Filippova, BE-RF-PM

Component Procurement 16 Feb Departmental Request 2.Preparing of technical specifications for the supply of X-band RF components 3.Price enquiry made by Commercial Officer 3 to 5 bids requested (preparing the list of firms to be contacted for the related price enquiries) 4.Preparing of Purchase Requisition (DAI) 5.Contract follow-up: contacting companies concerning the status of the manufacturing process, the coordination of requirements and conditions of production manufacturing with firms. Small orders Requests up to 1 kCHF Requests between 1 and 5 kCHF Requests between 10 and 50 kCHF Requests between 50 and 200 kCHF Medium orders Big orders Requests between 200 and 750 kCHF I. Departmental Request II. Market Survey followed by Invitation to Tender III. Finance Committee approval EDH (Electronic Document Handling System) work: N4 N2 -N 4 N1 -N 4 above 750 kCHF NI -NIINI –NIII M. Filippova, BE-RF-PM

RF Component Inventory and Logistics RF component inventory (high power loads, bi-directional couplers, splitters, hybrids, et..): updating of the RF component database UPDATED RF COMPONENT DATABASE.accdr (prepared by I. Kossyvakis), which is located at the following folder: G:\Departments\AB\Projects\CLIC Structures\RF structure development\ components\Inventory\Database Logistics of components (in collaboration with F. Rossi) EDH work: Shipping requests (Expedition) TID requests (Inter Departmental Transfer) 16 Feb 20124M. Filippova, BE-RF-PM

16 Feb 2012M. Filippova, BE-RF-PM5 Quality Assurance EDMS for RF structures and TBM (in collab. with S. Iija and W. Zhou) MTF (in collab. with S. Iija and W. Zhou)

Administrative Work Contracts, Addenda, Memoranda: signature procedure workflow Preparing of meeting agendas in Indico (Cost and schedule meetings, Two- beam module review, Test Module, CLIC Technical Committees, et..) Organizing of WebEx audio conferences Booking of conference rooms (in Indico), requiring of CERN visitor cards and other administrative work Participation in the French course and other trainings 16 Feb 20126M. Filippova, BE-RF-PM