1 SUPPLY/LOGISTICS FUNDAMENTALS
NAVEDTRA C 103 SUPPLY/LOGISTICS FUNDAMENTALS

2 SUPPLY/LOGISTICS FUNDAMENTALS
References: ABFC View COMFIRSTNCDINST A, Seabee Supply Manual (Dec 2007) NAVFACINST , Navy Expeditionary Table of Allowance (TOA) and Advance Base Functional Component (ABFC Development and modification policy and processes)

3 SUPPLY/LOGISTICS FUNDAMENTALS
PQS Question Name the 7 Sub-Components of the NMCB Table of Allowance (TOA) Reference: ABFC View

4 7 Sub-components of TOA P25CC – Command & Control
P25EM – Equipment Maintenance Module P25FIE – Fly in Echelon P25SC1 – Construction Module P25SC2 – Construction Module P25SC3 – Construction Module P25SS – Seabee Sustainment Module

5 SUPPLY/LOGISTICS FUNDAMENTALS
PQS Question Describe the duties and responsibilities of the Material Liaison Officer (MLO) within the battalion organization. Reference: COMFIRSTNCDINST A, p. 1-10

6 MLO The MLO Officer is responsible for procuring, receiving, stowing, issuing, shipping, transferring, and accounting for all construction project materials Is also responsible for maintaining related inventory, accountability, financial records, and files.

7 SUPPLY/LOGISTICS FUNDAMENTALS
PQS Question Describe the proceudres for issuing project material from the MLO Office. Reference: COMFIRSTNCDINST pp. 6-2 thru 6-3

8 Procedures for issuing project material
All material is requisitioned from the MLO on a Personnel must give the MLO the 1250s in advance so the MLO can process the paperwork, draw the materials out of storage, and prepare it for pick-up or delivery to the job site

9 SUPPLY/LOGISTICS FUNDAMENTALS
PQS Question Describe the procedures for conducting physical inventories. Reference: COMFIRSTNCDINST pp 6-3 thru 6-4

10 Inventory Baseline Inventory: Each Echelon V Commander will maintain a Baseline inventory for each TOA under its cognizance as defined in reference (a). The Baseline inventory will be established at the completion of an Integrated Logistics Overhaul using data provided by Naval Facilities Engineering Logistic Center (NFELC) as verified by the receiving unit and the cognizant Echelon V Commander.

11 SUPPLY/LOGISTICS FUNDAMENTALS
PQS Question Describe the procedures for requesting changes to approved TOAs Reference: NAVFACINST H pp 9 thru 11

12 Allowance Change Request
An ACR (NAVSUP ) is used to change the quantity on an allowance list. Typical reasons for an ACR include: material failure rates other than expected New operating areas or conditions Mission assignments require additional support Technical improvements in equipment, systems or repair parts that can provide additional capabilities An ACR is submitted through the 3M organization to Navy Inventory Control Point (NAVICP) Before submitting an ACR, ensure that a similar request has not been previously denied.