BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District November 29 th, 2012.

Slides:



Advertisements
Similar presentations
US Army Corps of Engineers BUILDING STRONG ® Mid-West Electric Consumers Association September 16, 2014 Corps of Engineers US Army Missouri River Mainstem.
Advertisements

St. Louis District Water Control Operations
Illinois Drought Response Task Force Arlan Juhl, Director of the Illinois Department of Natural Resources.
US Army Corps of Engineers BUILDING STRONG ® RIVER RESOURCES ACTION TEAM BOAT TRIP Upper Mississippi River (Pools 24, 25, and Mel Price) St. Louis District.
US Army Corps of Engineers BUILDING STRONG ® Louisiana Coastal Area Modification of Davis Pond Study Overview Governor’s Advisory Commission on Coastal.
RRAT – Dredging Update  Gilbert Island Post Construction  Flex Pipe Update  Flex Pipe use  2014 Dredging Update  Dredge Master Plan.
US Army Corps of Engineers BUILDING STRONG ® St. Louis District Dredging Lance Engle Dredging Project Manager St. Louis District WEDA – Midwest 2012.
® Cumberland River Basin 2007 Hydrologic & Hydraulic Drought Joy Broach – Aquatic Biologist Planning Branch - Environmental Section SWPBA Tennessee November.
Reduction of Streamflow From Upstream Ice Formation a.k.a. “Ice Bite” Brian Connelly North Central River Forecast Center Chanhassen, Minnesota.
Civil Works Baltimore District River and Harbor Projects.
US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013.
A Look Back at 2011/ A Look Ahead at 2012 John Lewis, Senior Forecaster National Weather Service Little Rock, Arkansas.
US Army Corps of Engineers BUILDING STRONG ® USACE – ACF Operations Bailey Crane Water Management USACE, Mobile District.
31 DECEMBER VARIABLE FLOOD CONTROL DRAFT FOR LIBBY RESERVOIR U.S. Army Corps of Engineers Northwestern Division, North Pacific Region.
Dredging, Disposal Management and Impacts on Lake Sediments US Army Corps of Engineers.
Area of Notice Bannock Creek Drainage All surface and ground water rights in drainage Approximately 80 – 90 notices sent.
Drought and the Central Valley Project August 2014.
Planning for Restoration of the Mississippi River in the Twin Cities Christian Lenhart.
National Weather Service North Central River Forecast Center Mississippi River Forecast Procedure.
One Corps Serving The Army and the Nation Tulsa District The Tulsa District Corps of Engineers and Its Cooperative Partners.
Savannah Harbor Expansion Project
Tri-Agency Data Sharing by Joel Asunskis, P.E. Hydraulic Engineer/Data Manager Water Control Management St. Louis District U.S Army Corps of Engineers.
US Army Corps of Engineers BUILDING STRONG ® Mouth of the Columbia River (MCR) Jetties Laura Hicks Chief, Planning and Project Management Branch Pacific.
Water Supply Planning Initiative State Water Commission November 22, 2004.
US Army Corps of Engineers BUILDING STRONG ® Portland District - Navigation Update COL Steve Miles Commander Portland District PNWA Annual Meeting 13 October.
Conservation Action Committee April 17, 2014 Drought Watch 2014 Lake Oroville, 2014.
MVS Mainstem Forecast Model Update: NETMISS2 by Joel Asunskis, P.E. Hydraulic Engineer, St. Louis District Water Control U.S. Army Corps Of Engineers October.
Kathy Alexander, Ph.D. Technical Specialist Water Availability Division Texas Commission on Environmental Quality.
US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers St. Paul District Channels & Harbors Project Presentation for 2012 WEDA Midwest.
Hydro Power 102. Hydroelectric Models in the Northwest.
One Team: Relevant, Ready, Responsive, Reliable 1 MRGO Closure Status Next Steps & Status USACE & State negotiate and sign MOA Plans & Specifications for.
IMPROVING MILLERTON LAKE FLOOD CONTROL OPERATIONS TO INCREASE WATER SUPPLY Mr. Antonio M. Buelna, P.E. Mr. Douglas DeFlitch Ms. Katie Lee October 29, 2009.
Portland Harbor Superfund Site. Overview of Statutes CERCLA - Federal law –Provides EPA with authority for clean up –Provides for liability, compensation,
Climate Outlook Jayantha Obeysekera (’Obey’), Ph.D.,P.E.,D.WRE Department Director Hydrologic & Environmental Systems Modeling.
National Weather Service Des Moines, IA National Weather Service Des Moines, IA Mid American Energy Spring Flood Outlook February 16, 2010 Jeff Zogg.
One Team: Relevant, Ready, Responsive, Reliable 1 Hannibal L/D Ohio River - Quoin Block Failure 110-ft x 1200-ft Main Lock Sep & Nov 2005 Pittsburgh District.
OP-Navigation.ppt1 U.S Army Corps of Engineers Savannah District.
Northwest Geographic Area Coordination Center Predictive Services Winter of Climate and Significant Fire Potential Outlook Monday December 7.
SEPOCTNOVDECJANFEBMARAPRMAYJUNJULAUGSEPOCT FY07FY06FY08 Page 1 of 3 FY07 Dredging Schedule New York District Mechanical Dredge Maintenance Dredging Newark.
Portland Harbor Superfund Site. Overview of Statutes CERCLA - Federal law –Provides EPA with authority for clean up –Provides for liability, compensation,
USACE Managing a Drought  Overview  Timeline  Depletion Scenario Current Status– 17 Oct 07.
US Army Corps of Engineers BUILDING STRONG ® Dredging with Turbidity Tests and the EPA in Green Bay Harbor Michael Staal, E.I.T. Civil Engineer U.S. Army.
US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Manual Update Joan Stemler St. Louis District Water Control.
US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers New Orleans District 75 th Annual Association of Levee Boards of Louisiana COL.
1 Atchafalaya River and Bayous Chene, Boeuf, and Black, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting April 13, 2005 Project Manager.
FY12 Budget and Caseload Update Fiscal Committee January 9, 2012.
US Army Corps of Engineers BUILDING STRONG ® Walla Walla District Update LTC Timothy Vail Oct 15, 2014.
US Army Corps of Engineers BUILDING STRONG ® Rock Arch Rapids Fish Passage Cape Fear River Lock and Dam No.1 Bladen County, NC US Army Corps of Engineers.
National Weather Service Des Moines, IA National Weather Service Des Moines, IA Iowa Spring Flood Outlook March 5, 2010 Jeff Zogg, Senior Hydrologist.
BUILDING STRONG ® Rock Removal on the Middle Mississippi River 1 RRAT 2014.
One Corps Serving the Armed Forces and the Nation By Eddie Brooks, P.E. Chief, Watershed Management Division Mississippi Valley Division Oct 30-31, 2007.
Threatened and Endangered Species Issues on the Kennebec River, Maine
Preparation Plan. Objectives Describe the role and importance of a preparation plan. Describe the key contents of a preparation plan. Identify and discuss.
Regional Carbon Sequestration Partnerships… “Pathways to Sustainable Use of Fossil Energy”
Drought Management Sheri Looper CVP Water Resource Specialist.
Daily Records Daily High Temperature Daily Low Temperature Daily Average Temperature Daily Precipitation Daily Snowfall Morning Snow Depth Maximum 71 (1889)56.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
US Army Corps of Engineers BUILDING STRONG ® Inner Harbor Navigation Canal Lock 2016 Dewatering Marine Industry Day USACE - New Orleans District 20 May.
Yuma Agriculture Water - Rights and Supply Terry Fulp Director, Lower Colorado Region Yuma Agriculture Water Conference January 13, 2016.
1 US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers St. Paul District Channels & Harbors Project Pool 2 Channel Management Study.
2017 National Waterways Conference
Translating restoration priorities
Mid-West Electric Consumers Association
Albeni Falls Dam Operations
2018 Annual Water Supply and Demand Assessment
The Effect of Improved Manure Management on Water Quality
FY12 Budget and Caseload Update Fiscal Committee February 6, 2012
Conventional Facilities
Manager, Resource Planning
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District November 29 th, 2012

BUILDING STRONG ®Overview  Historical Drought Overview  Low Water Operations  River Forecast  Extended Drought & Weather Forecast

BUILDING STRONG ® Historical Droughts Top 10 Low Water Stages at St. Louis (JAN 1940) (JAN 1963) (JAN 1964) (DEC 1937) (DEC 1989) (JAN 1957) (JAN 1956) (JAN 2003) (DEC 1933) (JAN 1954)

BUILDING STRONG ® Low Water Operations

BUILDING STRONG ® Critical Link Illinois River 29-NOV ~ 6,000 cfs Mississippi River 29-NOV ~ 34,000 cfs Missouri River 29-NOV ~ 46,400 cfs Mississippi St. Louis 29-NOV ~ 79,000 cfs

BUILDING STRONG ® Mel Price Low Water Operations  Approved Deviation to hold Mel Price 0.5 ft above maximum regulated pool ► Minimize fluctuations downstream (i.e. St. Louis Harbor) ► Extra storage is used to prevent low dips from L&D operations upstream ► Extra storage can be used to provide a pulse of water to free grounded tows if needed

BUILDING STRONG ® Mel Price Low Operations Actual W/O Mel Price Deviation Prevented St. Louis from dropping to -4.6 Avoided daily 1-2 ft fluctuations

BUILDING STRONG ® Middle Mississippi River Extended Forecast

BUILDING STRONG ® Daily Record Lows : 34 days POR: 14 days Record Low : -5.2 ft (Dec 1989) POR: -6.2 ft (Jan 1940) Extended Forecast Dec-Feb Low ~ -7.0 to -6.5 ft

BUILDING STRONG ® Daily Record Lows : 43 days POR: 10 days Record Low : 1.3 ft (Dec 1989) POR: -0.2 ft (Jan 1940) Extended Forecast Dec-Feb Low ~ -0.4 to 0.1 ft

BUILDING STRONG ® Daily Record Lows : 31 days POR: 27 days Record Low : 0.9 ft (Dec 1989) POR: 0.9 ft (Dec 1989) Extended Forecast Dec-Feb Low ~ -0.1 to 0.4 ft

BUILDING STRONG ® Record Low -6.2' 1/16/1940

BUILDING STRONG ® Record Low 0.85' 12/28/1989 Critical Stage ~ 2.0 ft

BUILDING STRONG ® Drought and Weather Outlooks

BUILDING STRONG ®

5 Day QPF

BUILDING STRONG ® 6-10 Day Outlooks Temperature Precipitation

BUILDING STRONG ® 8-14 Day Precipitation Outlook Temperature Precipitation

BUILDING STRONG ® Temperature (Average for St. Louis ~ 34.2˚) December Outlooks Precipitation (Average for St. Louis ~ 2.4”)

BUILDING STRONG ® December thru February Outlooks Temperature (Average for St. Louis ~ 30.2˚) Precipitation (Average for St. Louis ~ 6.4”)

BUILDING STRONG ® Current Activities Dredging Industry Coordination

BUILDING STRONG ® Rock Removal Information Brief Regulating Works Project (Civil Works) Information Brief

BUILDING STRONG ® Problem Statement Based on the current National Weather Service forecast, low Mississippi River stages will impact the St. Louis Districts’ ability to maintain the navigation channel at authorized project dimensions, especially in the Thebes Reach (River Mile ), in the mid-December 2012 timeframe. Pinnacle Rock Thebes Reach

BUILDING STRONG ® Rock Removal What are we trying to remove? MVS NN Thebes Grand Tower Mississippi River

BUILDING STRONG ® A B C D G Engineering Analysis Pinnacle Rock Impacts E F 7 areas were identified within Thebes Reach, River Miles 46 – 41, as impacts to maintaining authorized channel dimensions

BUILDING STRONG ® M M U Engineering Analysis Pinnacle Rock Impacts at Thebes Reach St. Louis from -5.0 to -7.0 A B C D E F G U M M U

BUILDING STRONG ® Pinnacle Removal Path Forward Regulating Works FY13 budget has funding to move forward with some priority locations (subject to contract award amount). PDT priorities include 4 locations totaling approximately 850 cy. Current coordination with RIAC have agreed to 12/12 work day. Due to the low water and time of year, impacts to navigation will be minimized. Coincides with scheduled closure at LD27 Main Lock for miter gate installation All parties agree this is the right time to pursue The Environmental Assessment and Biological Assessment are complete and valid based off our 2009 project Efforts are focusing on the drill and blast method, a proven methodology. The bedrock material strength is over 20,000 psi, ruling out other methods

BUILDING STRONG ® Pinnacle Removal Path Forward (Cont). Contract Status At least 2 contractors interested Pre-solicitation notice sent 5 November. RFP out 30 November. Tentative contract award date is late January/early February. Allows 60 days for rock removal work The current Biological Opinion does not allow us to blast outside this window Pallid Sturgeon spawning season PDT is working with USFW for a potential variance If all priority locations have been removed and resources still available, second level locations will be addressed subject to the availability of funds.

BUILDING STRONG ® Questions/Comments

BUILDING STRONG ® Rock Removal Drill and Blast Method Courtesy of NWP

BUILDING STRONG ® Rock Removal Drill and Blast Method Courtesy of NWP