US Army Corps of Engineers BUILDING STRONG ® Mid-West Electric Consumers Association September 16, 2014 Corps of Engineers US Army Missouri River Mainstem.

Similar presentations


Presentation on theme: "US Army Corps of Engineers BUILDING STRONG ® Mid-West Electric Consumers Association September 16, 2014 Corps of Engineers US Army Missouri River Mainstem."— Presentation transcript:

1 US Army Corps of Engineers BUILDING STRONG ® Mid-West Electric Consumers Association September 16, 2014 Corps of Engineers US Army Missouri River Mainstem System 2014-2015 Draft Annual Operating Plan Mike Swenson, P.E. Power Production Team Lead Missouri River Basin Water Management

2 Graphics courtesy of National Drought Mitigation Center

3 June Precipitation – Percent of Normal

4 July Precipitation – Percent of Normal

5 August Precipitation – Percent of Normal

6 3-Month Outlooks August - October

7 Missouri River Mainstem System Annual Runoff above Sioux City, IA Million Acre-Feet U.D. L.D. L.Q. U.Q. Med. 10% 90% 75% 25% 50% 34.5 MAF 16.1 19.3 30.6 24.6 Historic Drought Periods 2014

8 Missouri River Runoff above Sioux City, IA 2014 Actual and Forecasted Million Acre-Feet

9 Missouri River Mainstem System Storage Zones and Allocations Exclusive Flood Control 7% Carryover Multiple Use 53% Permanent Pool 24% 0 17.6 56.1 72.4 67.7 72.8 Storage In MAF 33.9 Annual Flood Control & Multiple Use 16% Sept 16, 2014 Historic max - 2011 Historic min - 2007 60.8 50.7 MAF - March 1, 2014

10 Current Reservoir Levels – Sept 15, 2014 Exclusive Flood Control Annual Flood Control & Multiple Use Carryover Multiple Use Permanent Pool 2250 2252.3 Exclusive Flood Control Annual Flood Control & Multiple Use Carryover Multiple Use Permanent Pool Exclusive Flood Control Annual Flood Control & Multiple Use Carryover Multiple Use Permanent Pool Exclusive Flood Control Annual Flood Control & Multiple Use Carryover Multiple Use Permanent Pool 2246 2234 2160 2030 1854 1850 1837.5 1775 1673 1854.8 1620 1617 1607.5 1540 1415 72.4 67.7 56.1 17.6 0 Fort Peck Oahe Garrison System Storage 2232.4 1805.8 1570.2 33.9 1619.7 72.8 2196.2 1844.7 1614.4 60.8 1.6 feet below base of Carryover Multiple Use Zone.7.2 feet above base of Carryover Multiple Use Zone. 6.9 feet above base of Carryover Multiple Use Zone.4.7 MAF above base of Carryover Multiple Use Zone.

11 BUILDING STRONG ® 2014 Reservoir Operations  Flood Control ► System storage peaked on September 1 at 61.3 MAF, utilizing 32 percent of the system’s flood control storage ► Gavins Point releases reduced in mid-June in response to record flooding on the Big Sioux River. Release reduction lowered peak stages 3 to 4 feet in most areas ► Releases increased at lower four projects in September to evacuate stored water  Navigation ► Started season at intermediate service ► Increased to full service flow support after July 1 storage check ► 10-Day extension to the navigation season  Hydropower ► Annual generation forecast is 9.9 BkWh; long term average is 9.4 BkWh  Recreation, Water Supply and Irrigation ► Normal to above reservoir levels and releases ► Gavins Point winter release will be 20,000 cfs  Fish and Wildlife / Endangered Species ► All three upper reservoirs rose this year during the forage fish spawn ► Spring pulses from Gavins Point dam were not conducted this year

12 BUILDING STRONG ® Planned Operation for 2015  Draft Annual Operating Plan developed using 1 September starting conditions ► Based on 5 statistical runoff scenarios ► Will begin runoff year at the base of the Annual Flood Control Zone ► No spring pulse in 2015  Letter to Tribes will offer consultation  Draft AOP released in September 2014  Public meetings scheduled for October 27-29, 2014 ► Fort Peck, Bismarck, Pierre, Smithville and Council Bluffs  Final Annual Operating Plan in December 2014

13 System Storage 2014-2015 Decision Points Top of Exclusive Flood Control – 72.4 maf Base of Exclusive Flood Control – 67.7 maf Million Acre-Feet Base of Annual Flood Control – 56.1 maf 201420152016 Navigation Preclude – 31 maf

14 Missouri River Downstream Flow Support Support for 2015 Navigation Season Runoff Scenario Annual Runoff Volume (MAF) July 1 System Storage (MAF) Flow Level Above or Below Full Service (in kcfs) Length of Shortening (Days) SpringFall Upper Decile34.564.00+190* Upper Quartile30.663.10+120* Median24.660.8000 Lower Quartile19.357.7000 Lower Decile16.156.50-0.50 * 10-day extension for Upper Quartile and Upper Decile

15 BUILDING STRONG ® Draft 2014-2015 Annual Operating Plan (AOP) Median Runoff Condition  Flood Control ► Begin 2015 runoff season at the base of the annual flood control zone  Navigation ► Full service flow support to start season ► Full service flow support for Lower Quartile and above runoff following July 1 storage check ► Full length navigation season  Hydropower – Annual Generation = 9.7 BkWh in 2015

16 BUILDING STRONG ® Draft 2014-2015 Annual Operating Plan (AOP) Median Runoff Condition  Recreation, water supply and irrigation ► Near normal reservoir levels and releases ► Winter releases of 17,000 cfs from Gavins Point  Fish and Wildlife / Endangered Species ► Favor Fort Peck and Oahe during forage fish spawn ► No March and May spring pulses from Gavins Point ► Minimize zero releases at Fort Randall to the extent reasonably possible

17 Missouri River Mainstem System Forecasted Energy Generation Upper Basic: 10,500 GWh Basic: 9,900 GWh Lower Basic: 9,400 GWh Energy in GWh

18 BUILDING STRONG ® Mainstem System Generation Million MWhs Normal UD Med LD 9.4 10.4 7.6 8.7 11.2 14.6 10.0 9.6 6.1 7.5 7.6 6.5 5.6 6.3 4.9 6.6 9.7 12.8 9.9 11.1 13.5 4.9 8.7 10.2 9.9

19 BUILDING STRONG ®

20 Missouri River Basin – Mountain Snowpack Water Content 2013-2014 with comparison plots from 1997*, 2001*, and 2011 The mountain snowpack peaked in the “Total above Fort Peck” reach on April 7 at 132% of the normal April 15 peak. The mountain snowpack peaked in the “Total Fort Peck to Garrison” reach on April 17 at 140% of the normal April 15 peak. *Generally considered the high and low year of the last 20-year period.Provisional data. Subject to revision. July 7, 2014

21 BUILDING STRONG ® Plains Snowpack 1 March 2014 1 March 20131 March 2011

22 Graphics courtesy of National Drought Mitigation Center

23 BUILDING STRONG ®