Short update from Glasgow R. Bates, A. Blue, T. McMullen.

Slides:



Advertisements
Similar presentations
Status and future measurements on Micron detectors Outline: Irradiation and measurement in dry atmosphere Measurements in vacuum.
Advertisements

Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Electrical and thermal testing at Glasgow and Liverpool.
M. Jones, A. Boston, M. Chartier, B. McGuirk, P. Nolan, R.D. Page, P. Pusa, D. Seddon, J. Thornhill, D. Wells and the ALPHA collaboration Department of.
Lai Po Lok Law Cheuk Hong Lee Zin Ming Yam Chi Ching Group 3 310KM Tutorial 8.
Setup/Installation/Operation of an Environmental Control Unit (ECU)
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
ATLAS Module building at Glasgow
HV Report F.Cavallari (INFN Roma). High Voltage set-up in M0’ 2 channels each driving 50 crystals (100 APDs) 1 Crate hosting 1 board (final system). 1.
FPGA PID Heater/Cooler Controller Galt Design, Inc.
MICE RF & Controls Paul Drumm. RF Layout 2 MW Amplifier Master Oscillator Controls etc 201 MHz Cavity Module 2 MW Amplifier 201 MHz Cavity Module CERN.
MICE RF TEST STAND Major Milestones (2006) –Testing of BURLE 4616 circuit September 2006 –Testing of 4616 circuit with full amplitude and phase control.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 30 June Sam Burke UCSB HEP Group.
A Brief Overview of LabVIEW Data Acquisition (DAQ)
STARLight PDR 3 Oct ‘01 G.1.1 Rashid STARLight STARLight Thermal Tahir Rashid STARLight Mechanical Engineer (734)
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 13 October 2003 Sam Burke Lance Simms.
Manuel FahrerCMS Week TB Meeting /6 1-Shot Test Beam CERN CMS: M.Huhtinen, R.Hammarstrom, A.Macpherson CERN ATLAS, PS, Karlsruhe CMS  Overview.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 28 July 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 23 June Sam Burke UCSB HEP Group.
Self-Contained Particulate Filter Filter 3 Presenters: Ian Gray, Kyhia Bostic Demo Given by: Nathan Sullivan.
Scanning apparatus. Final tune ups Repeatability: move in a given steps and see if we can get the same amounts. Calibration: mainly to convert any given.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 7 July 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 17 June Sam Burke UCSB HEP Group.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #26 University of California.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 14 July 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 21 July 2003 Sam Burke UCSB HEP Group.
TCT+, eTCT and I-DLTS measurement setups at the CERN SSD Lab
CO2 cooling pressure drop measurements R. Bates, R. French, G. Viehhauser, S. McMahon.
Oven controller design documents Martijn Jasperse February 2011.
Institute of Physics ASCR, Prague Strip Sensors R&D for SCT and ITk Marcela Mikeštíková.
Charge collection studies on heavily diodes from RD50 multiplication run (update) G. Kramberger, V. Cindro, I. Mandić, M. Mikuž Ϯ, M. Milovanović, M. Zavrtanik.
WP3 10 July 2014 QMUL/GAB 1 Status of Sensor Testing Setup at QMUL Re-structuring of QMUL Physics & Astronomy June/July 2013: Evacuated Physics building.
Temperature dependence of sensor leakage current Contents Introduction Measurement Result Summary Junkichi Asai (RIKEN BNL Research Center) (Hiroki kanoh.
ALBA Synchrotron – 17 June 2010 Centro Nacional de MicroelectrónicaInstituto de Microelectrónica de Barcelona First Measurements on 3D Strips Detectors.
Thermal measurements in Glasgow Richard Bates, Isaac Bonad, Craig Buttar.
The LST High Voltage System LST Readiness Review May 5, 2004 Klaus Honscheid Ohio State University.
M. Gilchriese Sector Status Module Loading Task Force Meeting November 18, 2004.
19 th November 2010EN/CV/DC Thermosiphon project IV review - Overall cost estimation and planning Michele Battistin Elena Perez Rodriguez 19 th November.
Charge Collection Study of Heavily Irradiated Silicon Microstrip Detectors Chris Lucas (University of Bristol) Irena Dolenc Kittelmann, Michael Moll, Nicola.
Andy Blue Glasgow Update. Andy Blue WP3 Meeting Summary ESD Protection –Part all arrived and installed Compressed Air Controls –New lines and panel being.
Analysis of Edge and Surface TCTs for Irradiated 3D Silicon Strip Detectors Graeme Stewart a, R. Bates a, C. Corral b, M. Fantoba b, G. Kramberger c, G.
Status of Glasgow module production Richard Bates The University of Glasgow K.Smith, R. Bates, A. Cheplakov, V. O’Shea W. Bell, J. Melone, F. Doherty,
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
G. Kramberger, Charge collection properties of heavily irradiated expitaxial silicon detectors, RESMDD04, Oct , 2004, Firenze Setup and samples Setup.
Pressure drops over cooling pipes Richard French, Richard Bates, Alex Bitadze.
Update from Birmingham Phil Allport, Daniel Briglin, James Broughton, Andy Chisholm, Laura Gonella, Kostas Nikolopoulos, Simon Pyatt, Juergen Thomas, John.
CNM double-sided 3D strip detectors before and after neutron irradiation Celeste Fleta, Richard Bates, Chris Parkes, David Pennicard, Lars Eklund (University.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Andy Blue Glasgow Update. Andy Blue WP3 Strip Meeting Environmental Chamber Installed into cleanroom –Working on controlling scans via Ethernet connection.
Laboratory 5: Introduction to LabVIEW
Introduction to LabVIEW
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
DOM Thermal Test Sept X.Bai, D.Swarnkar,. 26”(L) X 28(1/4)”(W) X 20”(H) blue board box filled with fiber glass insulation blue board insulation.
Andy Blue WP3 - Glasgow Update Andy Blue. WP3 Meeting Update Module Building –2 nd Module (FZ1) wire bonded last week –Tested on Mon –Re-works yesterday/today.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
S.DusiniOPERA meeting, LNGS May 2003 Cosmic Test Status Reports Remind of test setup Status report Gas and HVOK Strips and ElectronicsOK DAQalmost.
Zheng Li, 96th LHCC open session, 19th November 2008, CERN RD39 Status Report 2008 Zheng Li and Jaakko Härkönen Full author list available at
S A Griffiths CM42 June 2015 Electrical & Control.
TOTEM Electronics Status
VMM and the SRS - update Michael Lupberger.
Markus Friedl (HEPHY Vienna)
“Update on Software Development for the Thermal Tests”
A Comparative Sensor Testbeam Using Micro-Focused X-rays
US Module Testing Progress Report
Setup for testing LHCb Inner Tracker Modules
US Module Testing Progress Report
Operations/Failure Analysis
Tests of Endcap capillary & Heat exchangers at CERN
Introduction to LabVIEW
Presentation transcript:

Short update from Glasgow R. Bates, A. Blue, T. McMullen

Devices to be tested CCE: 9 to measure (inc. 1 non-irrad.) – Work just started on non-irradiated – On course to finish all 1 st week of Feb – Chris & Kestutis (Students), Andy, Jo and myself working on this Electrical: 38 to measure (inc. 5 non-irrad.) – Stephen (Student) and Tom working on this Details of devices to test and progress following on Google docs

Electrical tests Electrical measurements performed on Wentworth prober with thermal chuck Chuck temperature verified Extra manipulators purchased to make inter- strip measurements – Arrived this year

First IV measurements performed

CCE update Using Alibava DAQ Testing apparatus ready – Labview based PID temperature control system – Labview based IV vi – Labview Alibava & Bias scan vi – Testbox to cool with Peltiers, heat with heater, monitor R.H Analysis at present with sin-preguntus – Working on updated code

DAQ set-up PID control for T and RH monitor HV supply Alibava Mother board Test Box

Test box

Test status System tested with ATLAS07 to 500 V – In situ Annealing still to be worked through Un-irradiated BZ3C-P12 bonded up and testing started Discovered issue with HV line – Extra current and breakdown issue at ~ 650 V – Appears to be HV filter – Will replace HV filter with external bias circuit