Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, 2012. ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,

Slides:



Advertisements
Similar presentations
CMS Week March presented by John Coughlan RAL FED Hardware Status Pre-Series Manufacture Final Production Plans.
Advertisements

Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
HV Report F.Cavallari (INFN Roma). High Voltage set-up in M0’ 2 channels each driving 50 crystals (100 APDs) 1 Crate hosting 1 board (final system). 1.
Target Controller Electronics Upgrade Status P. Smith J. Leaver.
Consolidation program SPS Main Power Converters (Dipole & Quadrupole) K. Kahle / Q. King / G. Le Godec (TE-EPC) IEFC Workshop, 9 March 2012.
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
S.Sergeev, JINR, Dubna. This is just an example of what could be done Could be extended to needs of any NA62 sub- detector requiring a lot of analog measurements.
Upgrade developments in Clermont-Ferrand Romeo Bonnefoy and François Vazeille Tilecal upgrade meeting (CERN, 13 June 2014) ● Handling tools ● Deported.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
TE-MPE-EP, VF, 11-Oct-2012 Update on the DQLPU type A design and general progress. TE-MPE Technical Meeting.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
UF-PNPI HV system upgrade Presented by N. Bondar. CERN  Part 1. HV System migration to USB interface  Part 2. HV System proposal of Stage 2.
LV and HV status of the RPC system RPC detector and trigger group.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Faculty of Physics, University of Belgrade General meeting 19 th of August, ToF-LR HV Upgrade Jovan Puzović, Faculty of Physics, Belgrade.
The LST High Voltage System LST Readiness Review May 5, 2004 Klaus Honscheid Ohio State University.
CIDB The PSI Controls Inventory DataBase Timo Korhonen, PSI (for the CIDB Team)
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
The Alice-ToF HV system and the PVSS control system E. Scapparone for the Alice-Tof group DCS Workshop, June 16 - The ToF High Voltage layout ; - Component.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
ISEG HV power supplies for NA62 R. Fantechi 6/4/2011.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
CSC ME1/1 Patch Panel Interconnect Board (PPIB) Mikhail Matveev Rice University February 27, 2013.
NA62 straw tracker DCS Straw tracker overview Bulk power supply Power supply distribution and monitoring LV + monitoring HV Temperature monitoring Gas.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
Preparation of chamber training g. passaleva. Gaps to be trained We have O (100) gaps that have tripped at least once since June At a quick glance they.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
HBD HV Control and Monitoring System RESISTORS, CALIBRATION & CO. Manuel Proissl HBD Meeting 12/23/2008.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Technology Department 1 ELENA Fast Deflectors status Nicolas Voumard, Jan Schipper TE/ABT/EC TCM 17/11/2015 1/11.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
TDC/TEL62 update M. Sozzi NA62 TDAQ WG meeting Bruxelles – 9/9/2010.
Faculty of Physics, University of Belgrade General meeting, 19 th of May, Pixel/Connectors Checking Jovan Puzović, Faculty of Physics, Belgrade.
CDMS II Shielding To Installation To Construction From Design.
Faculty of Physics, University of Belgrade General meeting, Wroclaw 28 th of January, ToF-L/R HV Upgrade, Status and Plans Jovan Puzović, Faculty.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
Faculty of Physics, University of Belgrade Collaboration board meeting 31 th of January, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
V.Duk, INFN Perugia1 CHOD/NHOD status Viacheslav Duk, INFN Perugia Ferrara,
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 01/19/2009.
Faculty of Physics, University of Belgrade Collaboration meeting CERN, 24 th of September 2015 ToF-LR status and future Jovan Puzović, Faculty of Physics,
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Faculty of Physics, University of Belgrade Collaboration meeting, Zagreb, 10 th of October, Remote control and monitoring of ToF-L/R detector Jovan.
Faculty of Physics, University of Belgrade Collaboration meeting, Dubna 8 th of April, ToF-LR Upgrade Jovan Puzović, Faculty of Physics, Belgrade.
RICH Readout Plans F. Bucci, M. Piccini on behalf of the RICH WG.
High Voltage Module in Active Voltage Dividers (AVD) for MPGD
LKr status R. Fantechi.
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
T1 Electronic status Conclusions Electronics Cards:
NA61 PSD. Upgrade status. Institute for Nuclear Research RAS, Moscow.
Report on radiation test done in Casaccia on January 11, 2006
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
RPC Detector Control System
RPC HV-LV project Introduction System requirements and description
RPC HV-LV project Introduction System requirements and description
RPC Detector Control System
Presentation transcript:

Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics, Belgrade

Faculty of Physics, University of Belgrade Collaboration meeting, Budapest, Page 2 out of 23 Jovan Puzović, Belgrade SHINE team Outline Short overview of ToF-L/R HV system Reason for upgrade of HV system Possible solutions for upgrade Description of chosen solution Current status of HV upgrade

Faculty of Physics, University of Belgrade Collaboration meeting, Budapest, Page 3 out of 23 Jovan Puzović, Belgrade SHINE team HV System Components 1)Main control unit – CAEN SY527 (10 units – working well – some aging problems) 2) HV Generator modules – CAEN 753 (10 units – 90 channels - working well) 3) HV Distributors modules – CAEN 933 (80 units – 1920 channels - lot of problems due to aging) 4) PC for control and monitoring (working well)

Faculty of Physics, University of Belgrade Collaboration meeting, Budapest, Page 4 out of 23 Jovan Puzović, Belgrade SHINE team System topology

Faculty of Physics, University of Belgrade Collaboration meeting, Budapest, Page 5 out of 23 Jovan Puzović, Belgrade SHINE team HV System Status Falling rate of HV distributors increase during last year During the November Be run (one month) we lose 4 distributors! 6 broken distributors sent to CAEN for reparation When we get them back, we will have only 4 spares, which is not enough to be safe for this year run

Faculty of Physics, University of Belgrade Collaboration meeting, Budapest, Page 6 out of 23 Jovan Puzović, Belgrade SHINE team Plan for upgrade 1)Replace two crates in the pit (480 channels) with the new system (first phase ) 2)Replace another two crates (480 channels) with the new system (second phase – 2013 or 2014) 3) Use replaced crates as source of spare parts for the remaining crates

Faculty of Physics, University of Belgrade Collaboration meeting, Budapest, Page 7 out of 23 Jovan Puzović, Belgrade SHINE team Plan for upgrade QUESTION buy a new system from manufacturer (CAEN,…) OR produce a custom made, based on resistor divider

Faculty of Physics, University of Belgrade Collaboration meeting, Budapest, Page 8 out of 23 Jovan Puzović, Belgrade SHINE team CAEN System 1) SY Universal Multichannel Power Supply System – BASIC5680 EUR 2) A1932AP - SY1527 H.V. channels +3 KV/500 μA Distributor (48 ch) (Double width)6,085 EUR 3) A2932AP - SY1527 H.V. channels +3 KV/250 μA Distributor (48 ch) (Single width) 6,085 EUR 4) SW SY4527 Control software1,250 EUR

Faculty of Physics, University of Belgrade Collaboration meeting, Budapest, Page 9 out of 23 Jovan Puzović, Belgrade SHINE team CAEN System

Faculty of Physics, University of Belgrade Collaboration meeting, Budapest, Page 10 out of 23 Jovan Puzović, Belgrade SHINE team Price for CAEN system 1) 480 channels, phase 1 (two old crates) ( * *2000) ~72000EUR (150 EUR/ch) 2) 960 channels, phase 2 (four old crates) ~144000EUR (150 EUR/ch) FAR BEYOND OUR POSSIBILITIES! (and still have connectors problems!)

Faculty of Physics, University of Belgrade Collaboration meeting, Budapest, Page 11 out of 23 Jovan Puzović, Belgrade SHINE team Custom made system -Distributor made as a passive resistors divider -Setting of HV by hand (choosing R) -Basic idea originate from Dubna

Faculty of Physics, University of Belgrade Collaboration meeting, Budapest, Page 12 out of 23 Jovan Puzović, Belgrade SHINE team Custom made system Distributor made as a passive resistors divider Setting of HV by hand (choosing R) Include monitoring of HV by implementing microcontroller inside every distributor! Use the same connectors on the back as we already use Made the standard housing (bin) compatible with standard rack

Faculty of Physics, University of Belgrade Collaboration meeting, Budapest, Page 13 out of 23 Jovan Puzović, Belgrade SHINE team Price for custom system 1)480 channels, phase 1 (two old crates) 15000EUR (~31 EUR/ch) (two crates+20 distributors+4 spare) 2) 960 channels, phase 2 (four old crates) ~30000EUR (~31 EUR/ch) (four crates+40 distributors+8 spare)

Faculty of Physics, University of Belgrade Collaboration meeting, Budapest, Page 14 out of 23 Jovan Puzović, Belgrade SHINE team Advantage Electronics is not complicate, expecting robust design, stable work and lower falling rate Price is ~5 times less comparing to new CAEN system needed to replace the old one High voltage level can be monitored by control logic in crate by using already existed cables and software in PC located in counting room Without monitoring can be run in passive mode in old CAEN crate!

Faculty of Physics, University of Belgrade Collaboration meeting, Budapest, Page 15 out of 23 Jovan Puzović, Belgrade SHINE team Disadvantage Complicate procedure of setting and calibration Every distributor board will be unique (according to HV specification for their set of channels) Control electronic will not be finished until start of the summer run! (But distributor boards can run without monitoring!)

Faculty of Physics, University of Belgrade Collaboration meeting, Budapest, Page 16 out of 23 Jovan Puzović, Belgrade SHINE team Crate - front

Faculty of Physics, University of Belgrade Collaboration meeting, Budapest, Page 17 out of 23 Jovan Puzović, Belgrade SHINE team Crate - top

Faculty of Physics, University of Belgrade Collaboration meeting, Budapest, Page 18 out of 23 Jovan Puzović, Belgrade SHINE team Front panel

Faculty of Physics, University of Belgrade Collaboration meeting, Budapest, Page 19 out of 23 Jovan Puzović, Belgrade SHINE team Communication

Faculty of Physics, University of Belgrade Collaboration meeting, Budapest, Page 20 out of 23 Jovan Puzović, Belgrade SHINE team Shematic

Faculty of Physics, University of Belgrade Collaboration meeting, Budapest, Page 21 out of 23 Jovan Puzović, Belgrade SHINE team Current status Contract between NA61 and IPB (Institute for Physics, Belgrade) already signed Mechanical parts ordered, expecting to be delivered till the end of the May Amphenol connectors ordered from CAEN, will be delivered to the end of June (90 days!) Electrical design finished PCB design in progress, will be finish in next few days PCBs expected at the beginning of June

Faculty of Physics, University of Belgrade Collaboration meeting, Budapest, Page 22 out of 23 Jovan Puzović, Belgrade SHINE team Conclusion First working modules (without HV monitoring) expected for mid of July (needed in case of emergency) Full functionality at the beginning of September ToF-L/R readout upgrade have to be discuss!

Faculty of Physics, University of Belgrade Collaboration meeting, Budapest, Page 23 out of 23 Jovan Puzović, Belgrade SHINE team THE END