Fermilab LCLS-II Cryomodule QA/QC Model and Software Tools ESS Cryomodule Workshop, 16-Oct-2014 Jamie Blowers Head of Machine Shop and Quality & Materials.

Slides:



Advertisements
Similar presentations
Our Corporate Mission Quality Systems Management, Inc. (QSMI)
Advertisements

Calyxinfo Walking through Calyx Info The Organisation.
Global Congress Global Leadership Vision for Project Management.
Teamcenter: Engineering Data Management System
QUALITY MANAGEMENT DEFINITIONS AND CONCEPTS QUALITY MANAGEMENT TOOLS QA / QC PROCESS COMPUTERS AND PROJECT QUALITY.
Computer Engineering 203 R Smith Requirements Management 6/ Requirements IEEE Standard Glossary A condition or capability needed by a user to solve.
SAP R/3 Materials Management Module
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
Getting the Most Out of Blue Mountain RAM
Basics of Good Documentation Document Control Systems
The BIM Project Execution Planning Procedure
Effective Methods for Software and Systems Integration
Hot Checkout System for Accelerator Operations at JLab Ken Baggett (Team Leader) Theo Larrieu Ron Lauzé Randy Michaud Ryan Slominski Paul Vasilauskis.
TD/MSD TORUS CMM PRODUCTION: OVERVIEW G. Velev Clas12 Torus CCM Production Readiness Review –Dec 4, 2013.
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
1 Building and Maintaining Information Systems. 2 Opening Case: Yahoo! Store Allows small businesses to create their own online store – No programming.
Introduction to Computer Aided Process Planning
Teamcenter Update May 2012 Agenda  What is Teamcenter  Benefits  Status  Planned Next Steps.
From Research Prototype to Production
Fermilab Cryomodule QA/QC Model Jamie Blowers LCLS-II EDM/PLM Applications 31-Mar-2014.
Document Control Basics of Good Documentation and
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
INFN-Pisa Glast Database in Pisa A practical solution based on MSAccess Luca Latronico INFN Pisa.
Best Uses of Microsoft Access Lauren Lewis. What is Microsoft Access? o MS access is a database management system from Microsoft that combines the relational.
IT Project Management Tools Available for Use at the Utah Dept. of Health The sooner you begin coding the later you finish. What is not documented has.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Managing Accelerator Quality Matthew Conlon 13 April 2015.
Student Curriculum Planning System MSE Project Presentation I Kevin Sung.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
CERN Equipment Management Integrates Safety Aspects EDMS Doc Eva Sanchez-Corral Mena, Stephan Petit / CERN 1 CERN Equipment Management Integrates.
U.S. Department of Agriculture eGovernment Program eGovernment Working Group Meeting February 11, 2004.
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
Teamcenter – Overview Teamcenter - Lab Wide EDMS1.
1 LHC-DFBX Fabrication Oversight Plan Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab.
Systems Accreditation Berkeley County School District School Facilitator Training October 7, 2014 Dr. Rodney Thompson Superintendent.
Accelerator/WP High Beta Structures Alan Wheelhouse HIGH-BETA CAVITY DELIVERY April 21, 2015.
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
Software Project Management (SEWPZG622) BITS-WIPRO Collaborative Programme: MS in Software Engineering SECOND SEMESTER /1/ "The content of this.
Thanks for giving me an opportunity to share with you our process for controlling media and other supplies. Disclaimer: We are not yet accredited to ISO.
CAD CAM. 2 and 3 Dimensional CAD: Using 2-dimensional CAD software, designers can create accurate, scaled drawings of parts and assemblies for designs.
JLab SRF Operations Staffing and Training T.Reilly JLab.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
Establishment of Engineering Data Management System in India based on Teamcenter Computer Division, BARC 27 Feb, 2015.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
©© 2013 SAP AG. All rights reserved. Product Development Scenario Overview Open Legend Project Manager Scenario Description The following business roles.
LCLS-II Cryomodule Interconnect Camille M Ginsburg (FNAL) FNAL LCLS-II Deputy Team Lead – Cryomodules Cryomodule Control Account Manager 29 July 2015 Project.
Engineering Documentation
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
Production CM QA/QC Plans and Systems Production Cryomodule Final Design Review Jamie Blowers 12-May-2015.
LCLS-II Prototype Cryomodule FDR J. Blowers, C.M. Ginsburg, T. Peterson, R. Stanek, J. Theilacker (FNAL) 21 – 22 January 2015 Homework Responses.
Software Engineering Process - II 7.1 Unit 7: Quality Management Software Engineering Process - II.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
Cold mass procurement, status and plan, QA-QC H. Prin With contribution from S. Becle, O. Housiaux, R. Principe, J.-L. Rudeiros Fernandez, F. Savary 3.
Cryomodule Safety Approvals Jay Theilacker LCLS-II Production Cryomodule Final Design Review May 12-14, 2015.
LCLS-II Prototype Cryomodule Darryl Orris 21 January 2015 Final Design Review: Instrumentation.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
CONFIGURATION MANAGEMENT AND CONTROL PLAN ESS Quality Assurance and Control workshop (30June) V. HENNION.
Accelerator Readiness Review October 31, 2006
Welcome ! Capstone Design Lab is a new 4 credit course specifically aimed to give you industry design exposure in a design team atmosphere The course.
Description of Revision
Quality Management Systems – Requirements
Product Development Scenario Overview
Document Management Don Mitchell March 15, 2019.
ESSI CHANGE AND nonconformity control SYSTEM
DOE Review of the LCLS Project October 2006
Work Unit AIK 11.2 CDR of the CDS-SL Quality
Presentation transcript:

Fermilab LCLS-II Cryomodule QA/QC Model and Software Tools ESS Cryomodule Workshop, 16-Oct-2014 Jamie Blowers Head of Machine Shop and Quality & Materials Departments, Technical Division QA Manager, FNAL LCLS-II QA Manager

Outline QA/QC “first principles” Fermilab QA and Engineering framework –SLAC LCLS-II additions QA/QC staff and function infrastructure –Collaboration with JLab on procurements Engineering Data Management Process Control and Production Date Management Our approach to-date regarding cryomodule assembly Closing Remarks Questions 16-Oct-2014J. Blowers | FNAL LCLS-II QA/QC and Software Tools2

QA/QC “First Principles” Apply our limited resources in the most effective way possible to minimize risk and assure that all requirements are met Ensure that requirements/expectations, both in-house and external, are as clear as concise as possible Culture counts; leverage its strengths, account for its weaknesses Quality cannot be inspected into something; it is designed and planned –But we still need to verify our work As much as possible leverage proven and effective processes/tools 316-Oct-2014J. Blowers | FNAL LCLS-II QA/QC and Software Tools

Internal and External Systems (a.k.a. constraints) 16-Oct-2014J. Blowers | FNAL LCLS-II QA/QC and Software Tools4

Staff/function Infrastructure 16-Oct-2014J. Blowers | FNAL LCLS-II QA/QC and Software Tools5 Hiring D. Frye L. Carpenter (C)

JLab/Fermilab Procurements Procurements split between the two labs For any given procurement, a “Lead Lab” has been identified –As the name implies, they lead and make the procurement –The other Lab is involved in a supporting role 16-Oct-2014J. Blowers | FNAL LCLS-II QA/QC and Software Tools6 Each Lab performs their own receiving inspections −Allows for each Lab to work in their preferred way (to a common set of requirements) −Eliminates the natural tendency to reproduce/redo work Each Lab has named an technical person to work on each procurement (for both lead and supporting); “SOTR”

Sub-Contracting Officer’s Technical Representative (SOTR) Important Role / Responsibility –“Glue” between design, prototyping, procurement and assembly phases –Technical expertise for sub-system components Design Phase –Develops technical specifications from higher level requirements –Prepares drawings and supporting technical documents Prototyping Phase –Works with Acquisition/Procurement to procure prototypes from industry/partner labs –Participates in prototype development and testing –Feeds forward experience into production process Production Procurement Phase –Provides technical leadership and point of contact with suppliers Inspection/Assembly/Integration –Provides sustaining engineering during receiving inspection & manufacturing –Technical judgment to resolve non-conformances 16-Oct-2014J. Blowers | FNAL LCLS-II QA/QC and Software Tools7 (Ed Daly)

Engineering Data Management The Fermilab Engineering Manual requires the use of an Engineering Data Management System Fermilab has implemented that requirement using Siemens Teamcenter (PLM) All LCLS-II Cryomodule and Cryogenic Distribution System designs are managed within Teamcenter (NX) JLab design/engineering/QA folks have (or can have) accounts, and access the Fermilab instance through a Citrix interface (web) 16-Oct-2014J. Blowers | FNAL LCLS-II QA/QC and Software Tools8

16-Oct-2014J. Blowers | FNAL LCLS-II QA/QC and Software Tools9

(No CAD software needed to do this) 16-Oct-2014J. Blowers | FNAL LCLS-II QA/QC and Software Tools10

Process Control System: Vector All travelers are fully electronic; System is currently read-only to the world, so easy data sharing is in place As much as we could, we replicated the functionality and flexibility of a paper traveler: 16-Oct-2014J. Blowers | FNAL LCLS-II QA/QC and Software Tools11

Vector (con’t) Reporting: choose any or all fields of any traveler, and the report is generated and can be saved to Excel: 16-Oct-2014J. Blowers | FNAL LCLS-II QA/QC and Software Tools12

Vector (con’t) Using the serial numbers assigned to all the various sub- components, can easily trace from full cryomodule to cavity to Nb sheet, quickly accessing all the associated data –Important to set the serialization scheme as early as possible; we’re still working on this for LCLS-II Architecture: –Enterprise database backend (we use MS SQL Server) –Coding is platform-neutral (ASP) CERN 11T dipole magnet folks set up an instance of Vector at CERN, and they made a very detailed presentation of the system: 16-Oct-2014J. Blowers | FNAL LCLS-II QA/QC and Software Tools13

Cryomodule Fabrication Model Purchase major components from industry, using detailed specifications and/or drawings Everything is inspected prior to being released to production –Inspection records are maintained for all inspections, including non-conformances –Serialized parts are inspected using a traveler (Vector) –May be sampling Every processing/testing/fabrication process is done according to a traveler, which outlines the steps to follow, the necessary data to record, and sign-offs. –Very important to understand the data needed to be recorded All discrepancies are recorded and tracked to closure. 16-Oct-2014J. Blowers | FNAL LCLS-II QA/QC and Software Tools14

Example Cavity Travelers 16-Oct-2014J. Blowers | FNAL LCLS-II QA/QC and Software Tools15

Example Discrepancy Report 16-Oct-2014J. Blowers | FNAL LCLS-II QA/QC and Software Tools16

16-Oct-2014J. Blowers | FNAL LCLS-II QA/QC and Software Tools17

LCLS-II QC Example 16-Oct-2014J. Blowers | FNAL LCLS-II QA/QC and Software Tools18

Closing Remarks Tying this with what others have already said, If ESS does not implement an EDMS/PLM system, they will have a data management model like LCLS-II –Those providing IKC’s will use their own systems –ESS will want to receive records/data for the IKC’s, but won’t have a system in which to receive it One of the ways we’re transitioning from “R&D mode” to series production is by incorporating QC prints –A good way to really think about what is most important –Minimizes QC effort, and in series production time is money Fermilab travelers combine the procedures and records into a single document –Different than DESY/XFEL, similar to JLab –Production staff only go to a single document –Allows for very easy mining of all the data –Content is critical 16-Oct-2014J. Blowers | FNAL LCLS-II QA/QC and Software Tools19

Closing Experts says you should take care of QA/QC first: Questions? 16-Oct-2014J. Blowers | FNAL LCLS-II QA/QC and Software Tools20

For further information: Jamie Blowers o1: o2: c: Oct-2014J. Blowers | FNAL LCLS-II QA/QC and Software Tools21